1. Trang chủ
  2. » Giáo Dục - Đào Tạo

guidelines for the installation

192 88 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 192
Dung lượng 8,62 MB

Nội dung

A list showing the request of modification, date and modification index see below... DEUTZ AG, Installation Manual BFM 1015... Modification index 0117 Checklist for inspection of starte

Trang 1

Modification index 01

Trang 3

In the electronic pocket-book all necessary changes and supplements will be

registered at short notice A list showing the request of modification, date and

modification index see below

Trang 4

DEUTZ AG, Installation Manual BFM 1015

Trang 5

Modification index 01

Trang 7

Modification index 01

Trang 9

Modification index 01

17 Checklist for inspection of starter motor system 17- 1

Trang 10

DEUTZ AG, Installation Manual BFM 1015

Trang 11

Modification index 00

Trang 14

Modification index 00

Trang 15

Modification index 00

Trang 17

Modification index 01

Trang 18

Modification index 00

Trang 20

Modification index 01

Trang 23

Modification index 00

Trang 24

Modification index 00

Trang 27

Modification index 01

Trang 28

Modification index 00

Trang 29

Modification index 00

Trang 30

Modification index 00

Trang 31

Modification index 00

Trang 32

Modification index 01

Trang 34

Modification index 00

Trang 35

Modification index 00

Trang 36

Modification index 00

Trang 37

Modification index 00

Trang 41

Modification index 00

Trang 42

Modification index 00

Trang 43

Modification index 01

Trang 44

Modification index 00

Trang 45

Modification index 00

Trang 46

Modification index 00

Trang 48

DEUTZ AG, Installation Manual BFM 1015

Trang 49

Modification index 01

Trang 50

Modification index 00

Trang 51

Modification index 01

Trang 56

Modification index 00

Trang 58

Modification index 00

Trang 61

Modification index 00

Trang 64

Modification index 01

Trang 65

Modification index 01

Trang 66

Modification index 00

Trang 67

Modification index 00

Trang 68

Modification index 00

Trang 70

Modification index 00

Trang 71

Modification index 00

Trang 72

DEUTZ AG, Installation Manual BFM 1015

Trang 73

Modification index 00

Trang 75

Modification index 00

Trang 76

Modification index 00

Trang 77

Modification index 00

Trang 78

Modification index 00

Trang 79

Modification index 00

Trang 80

DEUTZ AG, Installation Manual BFM 1015

Trang 81

Modification index 00

Trang 82

Modification index 01

Trang 83

Modification index 00

Trang 84

Modification index 00

Trang 85

Modification index 00

Trang 86

Modification index 00

Trang 87

Modification index 01

Trang 88

Modification index 00

Trang 89

Modification index 00

Trang 90

Modification index 01

Trang 91

Modification index 00

Trang 92

Modification index 00

Trang 93

Modification index 00

Trang 94

Modification index 00

Trang 95

Modification index 00

Trang 97

Modification index 00

Trang 98

Modification index 00

Trang 99

Modification index 00

Trang 100

DEUTZ AG, Installation Manual BFM 1015

Trang 101

Modification index 00

Trang 102

Modification index 00

Trang 103

Modification index 00

Trang 104

Modification index 00

Trang 105

Modification index 00

Trang 107

Modification index 01

Trang 108

Modification index 00

Trang 109

Modification index 00

Trang 110

Modification index 00

Trang 111

Modification index 00

Trang 112

Modification index 00

Trang 113

Modification index 00

Trang 114

Modification index 00

Trang 115

Modification index 00

Trang 116

Modification index 00

Trang 117

Modification index 00

Trang 118

Modification index 00

Trang 119

Modification index 01

Trang 120

Modification index 00

Trang 122

Modification index 01

Trang 124

Modification index 01

Trang 127

Modification index 01

Trang 128

Modification index 00

Trang 130

Modification index 00

Trang 131

Modification index 00

Trang 137

Modification index 00

Trang 138

DEUTZ AG, Installation Manual BFM 1015

Trang 139

Modification index 00

Trang 141

Modification index 00

Trang 143

Modification index 00

Trang 144

Modification index 01

Trang 145

Modification index 00

Trang 146

DEUTZ AG, Installation Manual BFM 1015

Trang 147

Modification index 00

Trang 150

Modification index 01

Trang 151

Modification index 00

Trang 152

Modification index 00

Trang 153

Modification index 00

Trang 155

Modification index 00

Trang 156

Modification index 00

Trang 158

Modification index 01

Trang 159

Modification index 01

Trang 160

Modification index 00

Trang 161

Modification index 00

Trang 162

Modification index 00

Trang 163

Modification index 01

Trang 166

Modification index 01

Trang 168

Modification index 00

Trang 169

Modification index 00

Trang 170

Modification index 00

Trang 171

Modification index 00

Trang 172

Modification index 00

Trang 173

Modification index 00

Trang 175

Modification index 00

Trang 177

Modification index 00

Trang 178

Modification index 00

Trang 180

Modification index 00

Trang 184

Modification index 01

Trang 185

Modification index 00

Trang 186

Modification index 00

Trang 187

Modification index 00

Trang 188

Modification index 00

Trang 189

Modification index 00

Trang 190

Modification index 00

Trang 191

17 Checklist for inspection of starter motor system

Cable laying, cable dimensioning, cable connection:

• Main cable (to terminal 30) and control cable (to terminal 50) have to be routed in that way that they do not come into contact (prevent short circuit)

• The cables have to be fixed approx 300mm after starter motor connection for the first time

• At terminal 50 only the control line to starter motor coming from a relay or from starter switch is allowed Additional electrical consumer e.g relays have to be connected at terminal 45

• The permitted resistance of control cable (terminal 50) and battery main cable (terminal 30) can be rough calculated with cross section, cable length (incl

ground cable, if available) number of transitions (add per transition 0,05mOhm) For the starter motor the permitted total resistance is cable resistance plus battery internal resistance Admissible values see starter drawing or installation guide line

Power relay for activating starter:

This relay should be similar to Bosch relay 0 332 002 150, the following data should

be checked:

• Switch-on voltage lower than 8Volt

• admissible electrical power 10% over value on starter motor drawing, e.g HE starter 60Amps, relay min 66Amps

• for short time (under 1 sec.) 250Amps must be permitted

• relay should be switched off when voltage is between 1,5 to 4,0V

Start blocking relay:

A minimum waiting time of 5 (6) sec must be observed

• after the drop of signal of terminal 50

• after drop of signals of "W", "D", "n"

• after starter has been switched off by speed signal

• start function must be blocked as long a speed signal occurs

Trang 192

DEUTZ AG, Installation Manual BFM 1015

Ngày đăng: 08/03/2019, 12:57

TỪ KHÓA LIÊN QUAN

w