1. Trang chủ
  2. » Giáo án - Bài giảng

Core concepts of accounting information systems 13 by simkin norman chapter 06

48 209 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 48
Dung lượng 1,49 MB

Nội dung

Prepared by Paula Funkhouser University of Nevada, Reno Core Concepts of Accounting Information Systems, 13th Edition Mark G Simkin ● Jacob M Rose ● Carolyn S Norman Developing and Implementing Effective AISs Chapter Chapter 6: Developing and Implementing Effective AISs • Introduction • System Development Life Cycle • Systems Planning • Systems Analysis • Detailed Systems Design and Acquisition • Implementation, Follow-Up, and Maintenance Copyright © 2015 John Wiley & Sons, Inc All rights reserved Introduction • Collaboration – Users, Analysts, Designers, Managers, Accountants and Auditors • Study of IT Systems – Planning and analysis through development – Design, Development, and Implementation – Maintenance of AIS applications Copyright © 2015 John Wiley & Sons, Inc All rights reserved Systems Development Life Cycle • Systems Study – Systems development work – Formal investigation of an existing information system • Performance of Study – In-house professionals (large organizations) – Hire outside consultants (smaller companies) Copyright © 2015 John Wiley & Sons, Inc All rights reserved Four Stages in the Systems Development Life Cycle • Planning and Investigation – Organize a systems study team – Preliminary investigation of current system – Develop strategic plans • Analysis of Current System – Identify information needs – Strengths and weaknesses Copyright © 2015 John Wiley & Sons, Inc All rights reserved Four Stages in the Systems Development Life Cycle • Design – Changes that eliminate/minimize weak points – Preserve the strengths • Implementation, Follow-up, and Maintenance – Resource acquisition – Training employees – Follow-up studies – Identify new problems and correct Copyright © 2015 John Wiley & Sons, Inc All rights reserved Systems Development Life Cycle Copyright © 2015 John Wiley & Sons, Inc All rights reserved Systems Studies and AISs • Applications Portfolio – Enterprise resource planning (ERP) • • • • • Work flows Data Gathering Recording tasks Employee responsibilities Rewarding managers – Business process reengineering (BPR) • Employee resistance Copyright © 2015 John Wiley & Sons, Inc All rights reserved Study Break #1 Which one of the four stages in the Systems Development Life Cycle is likely to be most costly for a new system? A Planning and Investigation B Analysis C Design D Implementation, Follow-up, and Maintenance Copyright © 2015 John Wiley & Sons, Inc All rights reserved Systems Planning • Planning for Success – Broad viewpoint in a systems study – Use an interdisciplinary study team for evaluation of systems – Study team works closely with steering committee – Align study with mission and strategic goals and objectives 10 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Point-Scoring Analysis 34 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Outsourcing • Business Process Outsourcing – Wide range of possible activities – Routine function to entire operation • Knowledge Process Outsourcing – Contract to perform research or other knowledge-related work 35 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Outsourcing • Advantages – Company can focus on core competencies – More efficient use of time and resources – Cost savings • Disadvantages – Inflexibility of contractual relationships – Loss of control – Loss of competitive advantages 36 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Implementation, Follow-Up, and Maintenance • Implementation Activities • Managing IT Implementation Projects • Postimplementation Review • System Maintenance 37 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Implementation Activities • Prepare the physical site • Determine functional changes • Select and assign personnel • Train personnel • Acquire and install computer equipment 38 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Implementation Activities • Establish internal controls • Convert data files • Acquire computer software • Test computer software • Convert to the new system 39 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Managing IT Implementation Projects • Program Evaluation and Review Technique – Also known as PERT – Helps identify critical paths – Recognize areas where slack time occurs • Gantt Charts – Useful for scheduling and tracking – Easy to understand – Best suited for projects lacking complexity 40 Copyright © 2015 John Wiley & Sons, Inc All rights reserved PERT 41 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Gantt Chart 42 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Managing IT Implementation Projects • Project Management Software – Operates on desktop or notebook computers – Aids in the management of implementation projects – Divides project into simpler activities – Estimates time and cost of activities 43 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Postimplementation Review • Reevaluate new system’s effectiveness – Talk with personnel about satisfaction levels – Talk with end users about satisfaction levels – Evaluate control procedures and effectiveness – Observe employee work performance – Evaluate computer processing functions – Determine output schedule timing and effectiveness 44 Copyright © 2015 John Wiley & Sons, Inc All rights reserved System Maintenance • System Maintenance – Performed by IT function – Continues tasks created by initial follow-up study • Responsibilities – Identify errors and anomalies – Estimate costs of fixing items – Perform necessary modifications 45 Copyright © 2015 John Wiley & Sons, Inc All rights reserved System Maintenance Costs 46 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Study Break #4 Prototyping, as an IT development approach, has both advantages and disadvantages In general, prototyping is most appropriate when: A The design team is not pressed for time in creating a new system B Users have a thorough understanding of their information needs C There are high risks associated with developing an implementing an ineffective system D System requirements are easily defined 47 Copyright © 2015 John Wiley & Sons, Inc All rights reserved Study Break #5 A point-scoring analysis: A Is a useful tool in conducting a feasibility analysis B Helps the systems study team to decide whether or not to outsource their AIS C Provides a systems study team with an objective means for selecting a final AIS D Is a tool used for managing IT projects 48 Copyright © 2015 John Wiley & Sons, Inc All rights reserved ... rights reserved Systems Development Life Cycle • Systems Study – Systems development work – Formal investigation of an existing information system • Performance of Study – In-house professionals.. .Chapter 6: Developing and Implementing Effective AISs • Introduction • System Development Life Cycle • Systems Planning • Systems Analysis • Detailed Systems Design and Acquisition... Stages in the Systems Development Life Cycle • Planning and Investigation – Organize a systems study team – Preliminary investigation of current system – Develop strategic plans • Analysis of Current

Ngày đăng: 15/05/2017, 11:43

TỪ KHÓA LIÊN QUAN