Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE Móng cọc shinso SHIN SOPILE
Trang 1OF SHINSO-PILE
BAI CHAY BRIDGE – BC2
Trang 2Pile Location Installing 1st Round of Liner Plate
Pile Hole Excavation
Placing Re-bar Cage for pile
Placing Concrete for Pile
Contact Grouting around Pile
Installing next round of
Trang 4EMPTY SPACE
Trang 5EMPTY SPACE
Trang 6EMPTY SPACE
Trang 7EMPTY SPACE
Trang 8EMPTY SPACE
Trang 9EMPTY SPACE
Trang 10EMPTY SPACE
RE-BAR PLASTIC PIPE
Trang 11EMPTY SPACE
RE-BAR PLASTIC PIPE
Trang 12EMPTY SPACE
RE-BAR PLASTIC PIPE
CONTACT GROUT
Trang 15fixing Shin-So Pile Head P2 Pier
Trang 17• Removal of Soil with
electrical winch
Trang 18conical Pipe