1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Package Evaluation Training 7 sealingwindow

15 746 2

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 15
Dung lượng 677,67 KB

Nội dung

26/09/2012 Package Evaluation T i i Training Sealing window PE-07/2012-04-01 Agenda Introduction Transversal Sealing (TS) window Longitudinal Sealing (SA/LS) window PE-07/2012-04-01 / 26/09/2012 IIntroduction t d ti Sealing window PE-07/2012-04-01 Introduction Seal in Tetra Pak Packaging System Front Panel Transversal Sealing (TS) SA strip s LS Longitudinal Sealing (LS) External Sealing layer Primer Strip Applicator Sealing (SA) Internal layer, usually PET Rear Panel Primer External Sealing layer PE-07/2012-04-01 / 26/09/2012 What is a sealing window (SW)? Just softening/overheating PE ≠ sealing it This statement is effective for all sealing technologies (IH; HA; US; CH) ► A SW is the range of energy required to have an acceptable sealing quality, starting from a lower limit = first setting giving a good sealing decreasing the energy the sealing gets blocked to an upper limit = last setting giving a good sealing increasing the energy the sealing gets overheated Applicable for Transversal sealing (TS), Longitudinal sealing (LS), Strip Applicator (SA), PullTab (PT),… ► The optimum is defined by the medium value of the range PE-07/2012-04-01 / What is a sealing window (SW)? Example of LS sealing, hot air Sealing window is from 180 ◦C to 290 ◦C, medium value is 235 ◦C Medium setting, 50% is recommended to use in production PE-07/2012-04-01 / 26/09/2012 SW: When is it required? ► ► ► ► ► ► New filling machine installation New production capacities New type of product (different viscosity, %fat, fibre, etc…) Product temperature change (impact on TS) Trouble shooting Etc… Basic Requirements: Filling Machine perfectly set following MM Test methods Trained personnel PE-07/2012-04-01 / Transversal sealing window i d Sealing window PE-07/2012-04-01 26/09/2012 Transversal seal : Induction heating Sealing jaw : Inductor Pressure jaw : Dollies, Cutting rails, Knife, Spring, Rubber Bushing PE-07/2012-04-01 / Transversal seal evaluation Tearing PE-07/2012-04-01 / 10 26/09/2012 Transversal seal evaluation Dissolving PE-07/2012-04-01 / 11 Transversal seal evaluation Dissolving - Heat pattern evaluation Note: For mm fin package (TBA 80,100B, 125S); B-measurement is acceptable when > mm PE-07/2012-04-01 / 12 26/09/2012 Transversal seal evaluation Dissolving - Red ink tightness PE-07/2012-04-01 / 13 TS sealing window TPIH 2000 - 2500 The setting g range g determined by y the test is only y valid in the conditions during the test and not as general working range for the filling machine ► If any comparison test need, it is necessary to run at the test same occasion and with the same conditions ► Filling machine must set according to MM and EM, the settings of the jaw system, e.g parallelism, are an important parameter to assure the final result of the activity ► Verify the conditions of the cutting rails and inductors, inductors mount new dollies ► Check the cooling water flow through the inductors (for two jaws machine) ► PE-07/2012-04-01 / 14 26/09/2012 TS sealing window Test Execution - General After machine ready in Production state, make a preliminary test to find the power setting of the TPIH unit for cold/blocked seal ► Run machine with the found value for about minutes in order to stabilize all temperatures ► Run at least 100 packages before collect packages sample ► Then increase the power setting by 10 scu or 25 watt for every trial until the upper limit found (plastic lumps, overheating swinging package) overheating, ) ► Note: Increase power setting can be 20 scu or 50 watt on middle value but not at the lower of upper part PE-07/2012-04-01 / 15 TS sealing window Test Execution – jaws machine ► At each setting take out 10 packages (5 LH and RH) ► Evaluate LH and RH packages (total = packages per setting) immediately with the stretch pliers, note the seal quality in the test report ►Once the range is defined, take LH and RH (total = packages) at the lower, middle, ¾ and highest setting to be dissolved Highest g setting g 3/4 setting Middle setting Lower setting PE-07/2012-04-01/ 16 26/09/2012 TS sealing window Test Execution – Chain machine ► At each power setting take out total 20 packages (2 packages per link) Make sure each package is marked with link number ► Evaluate packages immediately with the stretch pliers, note the seal quality in the test report ► Once the range is defined, take out sample per link (total =10 packages) at the medium setting and evaluate immediately with the stretch pliers to verify the uniformity of th sealing the li quality lit among allll th the lilink k ►Once the range is defined, take sample per each link (total = 40 packages) at the lower, middle, ¾ and highest setting to be dissolved PE-07/2012-04-01/ 17 TS sealing window Documentation Record P-order and reel no Record Filling machine information Record product and temperature ► Record all settings ► Attached form as example ► ► ► Microsoft Excel Worksheet PE-07/2012-04-01/ 18 26/09/2012 Longitudinal S li window Sealing i d Sealing window PE-07/2012-04-01 Longitudinal seal (LS) SA LS PE-07/2012-04-01 / 20 10 26/09/2012 Longitudinal seal evaluation Heat distribution zonoscope PE-07/2012-04-01 / 21 Longitudinal sealing evaluation Tearing PE-07/2012-04-01 / 22 11 26/09/2012 Longitudinal seal evaluation Ink injection to air gap PE-07/2012-04-01 / 23 Longitudinal seal evaluation Ink injection to air gap – Channel deviation PE-07/2012-04-01 / 24 12 26/09/2012 LS sealing window Hot air/Induction heating The setting g range g determined by y the test is only y valid in the conditions during the test and not as general working range for the filling machine ► If any comparison test need, it is necessary to run at the test same occasion and with the same conditions ► Verify conditions, alignment and setting of hot air elements/inductor, spring pressure according to MM, mount new LS pressure roller ► Check the overlap dimension and overall forming of the package produced, overlap and forming should be on package basic condition ► PE-07/2012-04-01 / 25 LS sealing window Test execution ► After machine ready in Production state, make a preliminary test to find the power setting of the lower limit by tear down method ► Let the filling machine produce for 10 minutes before test execution ► Run at least 100 packages before collect packages sample Then increase the power setting by 10 scu/C or 25 watt for every trial until the upper limit found (blistering/swing packages) ► ► Hot air - Each setting read the temperature and air pressure and note in the record, adjust pressure according to recommend setting in MM when increase temperature PE-07/2012-04-01/ 26 13 26/09/2012 LS sealing window Test execution, cont… ► At each setting take out 14 packages for evaluation ►Evaluate by manual tearing packages for each setting ►Evaluate 10 packages each setting by red ink injection to air gap, record the result in the test report ► Use zonoscope to check heat distribution, constant heat distribution along the seal length For lower setting, heat distribution should >2 mm from strip edge edge ► Induction heating, for upper part, the length of wrinkle must be < 15 mm PE-07/2012-04-01/ 27 LS sealing window Documentation Record P-order and reel no Record Filling machine information Record product and temperature ► Attached form as example ► ► ► Microsoft Excel Worksheet PE-07/2012-04-01/ 28 14 26/09/2012 E d End Sealing window PE-07/2012-04-01 15 [...]...26/09/2012 Longitudinal seal evaluation Heat distribution zonoscope PE- 07/ 2012-04-01 / 21 Longitudinal sealing evaluation Tearing PE- 07/ 2012-04-01 / 22 11 26/09/2012 Longitudinal seal evaluation Ink injection to air gap PE- 07/ 2012-04-01 / 23 Longitudinal seal evaluation Ink injection to air gap – Channel deviation PE- 07/ 2012-04-01 / 24 12 26/09/2012 LS sealing window Hot air/Induction... (blistering/swing packages) ► ► Hot air - Each setting read the temperature and air pressure and note in the record, adjust pressure according to recommend setting in MM when increase temperature PE- 07/ 2012-04-01/ 26 13 26/09/2012 LS sealing window Test execution, cont… ► At each setting take out 14 packages for evaluation ►Evaluate by manual tearing 4 packages for each setting ►Evaluate 10 packages each... forming of the package produced, overlap and forming should be on package basic condition ► PE- 07/ 2012-04-01 / 25 LS sealing window Test execution ► After machine ready in Production state, make a preliminary test to find the power setting of the lower limit by tear down method ► Let the filling machine produce for 10 minutes before test execution ► Run at least 100 packages before collect packages sample... Induction heating, for upper part, the length of wrinkle must be < 15 mm PE- 07/ 2012-04-01/ 27 LS sealing window Documentation Record P-order and reel no Record Filling machine information Record product and temperature ► Attached form as example ► ► ► Microsoft Excel Worksheet PE- 07/ 2012-04-01/ 28 14 26/09/2012 E d End Sealing window PE- 07/ 2012-04-01 15

Ngày đăng: 08/09/2016, 09:28

TỪ KHÓA LIÊN QUAN

w