ons R20m5.00Tons Crawler crane50Tons Jetty 2a Crawler crane50Tons wharf 2aSuper structure line Drilling System Barge 1000tons Bentonite System Barge 600tons Drilling SystemBarge 1000ton
Trang 1Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
wharf 1
R20m
5
ons
R20m5.00Tons
Crawler crane50Tons
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
Drilling System Barge 1000tons Bentonite System
Barge 600tons
Drilling SystemBarge 1000tons
Bentonite SystemBarge 600tons
Rebar workBarge
10
PLAN OF WHARF AND JETTY IN BORED PILE STAGE - OPTION1
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
PLAN OF WHARF AND JETTY BORED PILE STAGE-OPTION1
Trang 2Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
wharf 1
R20m5.00Tons
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
ons
R20m19.5 T
ons
R20m19.5 Tons
Crane 80T
Crane 120T
R20m
5
ons
Crawler crane50Tons
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1
OPTION 1
Trang 3Km 000
L
Km 100L
Km
300L
Km 400L
Km 26+100R
Km26+300R
wharf 1
R20m5.00Tons
Jetty 2a
Crawler crane50Tons
wharf 2aSuper structure line
crawler crane80Tons
Jetty 2b
8.7
R
26m5.4tons
Material Barge35.4
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE - OPTION 1
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1
STAGE - OPTION 1
Trang 44%
R26m5.4 Tons
Crawler crane50TonsJetty 1a
Material Barge35.4
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Trang 5Jetty 2a
Crawler crane50Tons
38
crawler crane80Tons
Jetty 2b
8.7
R
26m5.4tons
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 41 - OPTION 1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 41 - OPTION 1
Trang 66060
Crawler crane
80 Tons21400
+15.545
+2.220+2.20
JettyB=6.0m
B
Len
57°
Pier ColumnTraveller
Existing bottom river
Rate Load = 5.4 tons
1587
45004500
Hmin = -1.28
Note : All dimensions are in mm, levels are in m
1 : 250
CHECKING CONDITION CRAWLER CRANE 80 TONS IN CANTILEVER CONSTRUCTION AT PIER 40 - OPTION 1
CHECKING CONDITION CRAWLER CRANE 80 TONS
IN CANTILEVER CONSTRUCTION AT PIER 40-OPTION 1 CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
Trang 7Jetty 1aB=9.0m
Traveller
Existing bottom river
3000 3000 3000
H800x300x26x14L=10.4m
H400x400x21x13L=8m
C 220x80x12x8.7L=16.5m
14004500
45007650
H 400x400L=48m
PIER 40
SPSPCofferdam systemD=0.7m, L=35m
+15.545
Jetty 1bB=1.5m
Concrete supply pileD=135mm , t=5mm
-4.59Hmin = -1.28
H300x300
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
Note : All dimensions are in mm, levels are in m
GENERAL VIEW CASTING CONCRETE PROCESS AT PIER 40 SIDE
GENERAL VIEW CASTING CONCRETE PROCESS
AT PIER 40 SIDE
Trang 8Crawler crane
80 Tons21400
Hmin = -1.28
Htb = +1.16
Hmin = -1.28
Note : All dimensions are in mm, levels are in m
CHECKING CONDITION CRAWLER CRANE 80 TONS IN CANTILEVER CONSTRUCTION AT PIER 41 - OPTION 1
CHECKING CONDITION CRAWLER CRANE 80 TONS
IN CANTILEVER CONSTRUCTION AT PIER 41 - OPTION 1 CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
1 : 250
Trang 9CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
GENERAL VIEW CASTING CONCRETE PROCESS AT PIER 41 SIDE
GENERAL VIEW CASTING CONCRETE PROCESS
AT PIER 41 SIDE
Note : All dimensions are in mm, levels are in m
Trang 10Hmin = -1.28
Htb = +1.16 Hmax = +1.68
96102920
500035000
-2.00-2.00
-3.00-3.00
-4.00-4.00
-5.00-5.00
-6.00-6.00
PLAN OF TEMPORARY SLOPE AT PIER 40
R25
1mx1mx2m
6 H200x200 6 H200x200
Gabion1mx1mx2m
Black sand K95Geotextile fabric
SECTION B - B
11
7000
11
60cm Stone 4x6cmGeotextile fabricBlack sand K95Geotextile fabric
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
RAMP WAY AT PIER 40 - OPTION 1
RAMP WAY AT PIER 40
NOTES:
All dimensions are m, levels are m Dimensions in typical section are mmm
Trang 11DETAIL ''C''Sub-base t=20cm
3000x1000x20
[200x76
Concrete C20 t=350mm
t=20mm
2 [200x76400
H800x300x14x26L=25.4m
Deck plate3000x1000x200
H350x350x12x19, L=12m
2[-200x75x5.2x9, L=10m
D32@0.8m, L=11.74m
2[-200x75x5.2x9L=24.2m
B
A
BA
Steel pile, L=48mH400x400Steel sheet pile, Larsen IV, L=20m
H350x350x12x19, L=12m
+2.20+2.20
H800x300x14x26L=25.4m
2[-200x75x5.2x9L=11.54m2[-200x75x5.2x9, L=9.0m
Detail ''C''
Detail ''G''C
C
-5.04-1.630
D32, L=10.5m
1000
Existing groundDetail ''D''
3540013000
structures of temporary JETTY 1A - option 1
- The material may be changed depend on actual condition
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1
Trang 12Steel sheet pile, Larsen IV, L=20m
PC bar D32
C-C section
+2.20
Sub-base t=200mm10800
[-300x90x9x13
[-200x76x5.2x9
D25 rebarL100x100x10@2mL50x50
[-200x76x5.2x9
300
H400x400x13x21H400x400x13x21
L100x100x10Bracing350
DETAIL ''E''Deck plate
3000x1000x20
Stiffener t=14mmSường tăng cườngH800x300x14x26Bolt M22
[-300x90x9x13
Plate 500x500x20
L100x100x10H400x400x13x21Stiffener plate, t=20mm
DETAIL ''D''
2[-200x76x5.2x9
PC bar D32@2mLarsen IV
Crossbeam, L=9.4m2[-300x90x9x13
H800x300x14x26, L=23.2m
[-300x90x9x13
L=2.9m
Deck plate3000x1000x200[-200x75x5.2x9
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GểI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
TYPICAL SECTION of temporary JETTY 1A - OPTION 1
TYPICAL SECTION OF TEMPORARY JETTY 1A - OPTION 1
Trang 13PC bar D32
a-a section
L100x100x10, L=3.8m
2[-200x75x5.2x9L=11.54m
H400x400L=9.5m
H800x300x14x26L=23.2m
Deck plate3000x1000x200
D32, L=10.5m[-200x75x5.2x9
H350x350x12x19
L=12m15600
D32@3m, L=1.57m
Detail ''A''Hmax = +1.68
3000x1000x20
[200x76
Concrete C20 t=350mm
20
PC bar D32 L=1.57mPlate 200x200
t=20mm
2 [200x76400
- All the dimension are mm, levels are m
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
structures of temporary JETTY 2A -OPTION 1
STRUCTURE OF TEMPORARY JETTY 2A - OPTION 1
Trang 14Crossbeam, L=9.4m2[-300x90x9x13
H800x300x14x26, L=23.2m
[-300x90x9x13L=2.9m
Deck plate3000x1000x200[-200x75x5.2x9
-1.23
DETAIL ''D''
2[-200x76x5.2x9
PC bar D32@2mLarsen IV
DETAIL ''E''Deck plate
3000x1000x20
Stiffener t=14mmSường tăng cườngH800x300x14x26Bolt M22
[-300x90x9x13
Plate 500x500x20
L100x100x10H400x400x13x21Stiffener plate, t=20mm
DETAIL ''F''
Deck plate3000x1000x20
[-300x90x9x13
[-200x76x5.2x9
D25 rebarL100x100x10@2mL50x50
[-200x76x5.2x9
300
H400x400x13x21H400x400x13x21
L100x100x10Bracing350
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GểI THẦU J2
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
TYPICAL SECTION of temporary JETTY 2A - OPTION 1
TYPICAL SECTION OF TEMPORARY JETTY 2A - OPTION 1
Trang 151000 4500 4500 400
Deck Plate3000x1000x200
H800x300x26x14L=10.4m
C 220x80x12x8.7L=16.5m
C 300x100x15x10 L=1.8m
Cross beam2C 300x90x13x9 , L=6.4m
H800x300x26x14L=10.4m
H400x400x21x13L=8m
C 220x80x12x8.7L=16.5mL100x100x10
L=3.8m
16900
A - A SECTION ( 1:150 )
DETAIL ''B'' (1:50)
C 220x80x12x8.7 L=16.5m SPSP
H 300x300
C 300x90x13x9 L=1.8mStiffener plate t=14mm
DETAIL ''A'' ( 1: 50)
1400
Steel plate 6000x1500x20
Jetty 1A
626 324 5501500
C 220x80x12x8.7 L=16.5m
H 800x300 L= 10.4m
+2.20
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1structures of temporary JETTY 1b - option 1
STRUCTURE OF TEMPORARY JETTY 1B - OPTION1
Trang 163000150
H 400x400L=8.0m
L 100x100x10L=3.8m
Cross beam2C 300x90x13x9 , L=6.4m
Steel pileH400x400 , L=48m
B - B SECTION (1:75)
+2.20+2.20
V 100x100x10L=1.3m
C - C SECTION (1:20)
L 100x100x10L=1.3m
C 160x65L=0.28m
DETAIL C (1:30)
Grille XG21t=5mm
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1TYPICAL SECTION OF JETTY 1B - OPTION 1
TYPICAL SECTION OF JETTY 1B - SECTION 1
Trang 172C 200x76x5.2x9L=22.5m
2C 200x76x5.2x9L=13.8m
2C 200x76x5.2x9L=7.85m
Steel sheet pilelarsen IV , L=20m
H 350x350x12x19L=12m
+2.20+1.44
-2.02
B - B SECTION (1:100)
Black sandK95
Hmax = +1.68Htb = +1.16
H 350x350x19x12L=12m
+2.20
2C 200x76x5.2x9L=7.85m
PC Bar D32L=11.2m
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
structures of temporary wharf 2b - option 1
NOTE :
All dimensions are mm , levels are m
STRUCTURE OF TEMPORARY WHARF 2B - OPTION1
Trang 18Detail "B" Detail "A"
A - A SECTION
Steel sheet pilelarsen IV , L=20m
8100+2.475Hmax = +1.68
V 100x100x10L=1.3m
B - B SECTION (1:25)
1500
SPSP
C 220x80x12x8.7L=8.1m
+2.20
20cm Sub base
Steel pileLarsen IV, l=20m
+2.425
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
structures of temporary JETTY 2b - option 1
STRUCTURE OF TEMPORARY JETTY 2B - OPTION1
Trang 19Steel sheet pileLarsen IV, L=20m
Crawler crane
55 tons
STEEP 1: CONSTRUCTION OF WHARF
- Locating the center of wharf
- Driving steel sheet pile Larsen IV
- Filling and compaction black sand
- Filling sub base to disigning level
- Completing of wharf
STEEP 2: DRIVING STEEL PILE H400x400
- To moving of crane
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
STEEP 3: INSTALLING MAIN BEAM AND COVER PLATE
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing guided bar
- Installing corver plate 3000x1000x200
- To moving guided bar
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing corver plate 3000x1000x200
Steel pile
H 400x400
Cover plate 3000x1000x200
Cover plate 3000x1000x200
Steel sheet pile
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
CONSTRUCTION METHOD OF JETTY OF WHARF
CONSTRUCTION METHOD OF JETTY AND WHARF
Trang 20Barge 500 tons
Barge 500 tons
Stone truck
Stone 4cmx6cm
Barge 500 tons Moving Direction
STEEP 1 : EXCAVATION SOIL
- Excavator Soil by crawler Excavator in barge 500tons
- Moving barge to dig inner
STEEP 2 : EXCAVATION OF FOUNDANTION GABIONS
- To dig soil foundation of gabion to designing level
STEEP 3 : INSTALLING GABIONS
- Transpost gabions by other 500tons barge
- Use crawler excavator to installing gabions
STEEP 4 : SPREAD STONE IN GABIONS SCOPE
- Transpost stone 4x6cm in truck by other 500tons barge
- Use crawler excavator to spread in gabions scope
STEEP 5 : EXCAVATION NEXT SEGMENT
- Moving crawler excavation to gabions scope
- Soil Excavator inner scope
STEEP 6 : SPREAD STONE NEXT SEGMENT
- Moving stone truck to next scope
- Use crawler excavator to spread stone next scope
STEEP 7 : PUMP BLACK SAND
- Spread geotextile fabric
- Transport black sand by truck in 500tons barge
- Use pump to pump black sand designing scope
STEEP 8 : COMPLETING TEMPORARY RAMP WAY
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
Hmax = +1.68
Hmin = -1.28Htb=+1.16
CHECKED BY
APPROVED BY
NAME SIGNATURE DATE
CHECKED BY
PREPARED BY
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)PACKAGE J2 - GÓI THẦU J2
THE EMPLOYER
CONSORTIUM OF
REV
SMC4 TITLE
JO-TITLE
Checked Date NGUYEN SONG TOAN
Designed date NGUYEN SY BAO
Approved Date 1 Checked date 1
Approved 1 Checked 1
CONSTRUCTION METHOD OF TEMPORARY RAMP WAY
CONSTRUCTION OF METHOD TEMPORARY RAMP WAY
NOTE:
- All dimension are mm , Levels are m
Trang 21H400x400x13x21 172.00 Kg 4.00 48.00 33,024.00 6.00 198,144.00 H400x400x13x21 172.00 Kg 6.00 9.50 9,804.00 1.00 9,804.00 H800x300x14x26 210.00 Kg 4.00 25.40 21,336.00 1.00 21,336.00 H600x200x11x17 106.00 Kg 1.00 9.00 954.00 1.00 954.00 C-200x76x5.2x9 18.40 Kg 1.00 86.80 1,597.12 1.00 1,597.12 C-200x76x5.2x9, L=0.3m 18.40 Kg 22.00 0.30 121.44 1.00 121.44 Rebar D25 3.85 Kg 1.00 60.30 232.16 1.00 232.16 L50x50 3.77 Kg 1.00 60.30 227.33 1.00 227.33 L100x100x10, L=1.5m 14.90 Kg 22.00 1.50 491.70 1.00 491.70 L100x100x10, L=3.8m 14.90 Kg 6.00 3.80 339.72 6.00 2,038.32 C-300x90x9x13, L=2.9m 38.10 Kg 3.00 2.90 331.47 11.00 3,646.17 C-300x90x9x13, L=9.4m 38.10 Kg 12.00 9.40 4,297.68 1.00 4,297.68 Steel plate 9x1.0x0.25m 196.25 kg/m2 Kg 1.00 9.00 1,766.25
(m2) Particular
summary main quantities for wharf at pier p40 - WHARF 1
PC bar