Mekong Delta Transport Infrastructure Development Project (MDTIDP) of the Vietnamese Government was financed by the World Bank. The project consists of four components as follows:+Component A: Investment for national roads.+Component B: Investment for national waterway corridors . +Component C: Investment for local waterway corridors and provincial roads.+Component D: To provide technical support to the Ministry of Transport and Mekong Delta provinces .In component B: Investment for national waterway corridors in Mekong Delta areas including: inland waterway corridor 2 (corridor 2 ) and inland waterway corridor 3 (corridor 3), among them: +Phase 1 of component B: the inland waterway corridor 2 (corridor 2) is being rehabilitateddredged from chainage km 80+00 to chainage km 253+00 corresponding to the contract packages NW1; NW2; NW3 and NW4. Phase 2 of component B: To carry out rehabilitationdredging of the rest of corridor 2 and last section of corridor 3 from chainage km 207+00 to chainage km 310+00 corresponding to packages NW11A; NW12A, etc
Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 1 CONTENT CHAPTER 1: INTRODUCTION 2 1.1. PROJECT BACKGROUND 2 1.2. LEGAL FOUNDATION FOR DESIGN WORKS (LEGAL DOCUMENTS) 3 1.3. SUMMARY OF APPROVED FS – PHASE 2 (COMPONENT B) FOR THE INVESTMENT OF WATERWAYS 4 1.4. SCOPE OF DESIGN WORKS 7 1.5. WORKS LEVEL 8 1.6. THE MANAGEMENT AND PROJECT IMPLEMENTATION UNIT FOR PHASE 2 – COMPONENT B 8 CHAPTER 2. DESIGN BACKGROUND 9 2.1. DOCUMENTS AND DATA SOURCES USED FOR DESIGN 9 2.2. STANDARDS AND REFERENCE DOCUMENTS 9 2.3. ADJUSTMENT OF DESIGN 10 CHAPTER 3: NATURAL CONDITIONS, PRESENT STATUS AND CONSTRUCTION PLANNING WITHIN THE PROJECT AREA 11 3.1. ADMINISTRATIVE GEOGRAPHICAL NAMES ALONG THE WATERWAYS CORRIDORS 11 3.2. HYDROMETEOROLOGY 11 3.3. TOPOGRAPHY OF WATERWAYS CORRIDOR 19 3.4. THE CONSTRUCTIONS ON THE BANKS AND RIVER – CROSSING 23 3.5. THE CONSTRUCTION PLANNING PROJECTS CONCERNED 23 3.6. GEOLOGICAL AND SOIL CONDITIONS 26 3.7. ENVIRONMENTAL CONDITIONS 28 CHAPTER 4. DESIGN OF CHANNEL 32 4.1. BRIEF DESCRIPTION OF CHANNEL AND CALCULATED SHIPS 32 4.2. PROPOSAL OF CALCULATED SHIPS AND STANDARD PRINCIPLE OF CHANNEL 33 4.3. OPTIONS FOR CHANNEL PLAN 41 4.4. DESIGN OF DREDGING AND EXCAVATING WORKS FOR CHANNEL 48 4.5. PROPOSAL FOR SELECTION OF CONSTRUCTION OPTION FOR CHANNEL 55 4.6. PROPOSAL FOR SEPARATION OF BIDDING PACKAGES 56 CHAPTER 5. CONSTRUCTION PROCEDURE AND METHOD 58 5.1. CONSTRUCTION PROCEDURE 58 5.2. CONSTRUCTION METHOD 59 5.3. CONSTRUCTION SAFETY 64 5.4. NATURAL ENVIRONMENT PROTECTION 67 CHAPTER 6. CONSTRUCTION QUANTITY AND PROGRESS 70 6.1 SITE CLEARANCE QUANTITY OF PACKAGES 70 6.2 CONSTRUCTION QUANTITY OF SOIL DUMPING AREA 71 6.3 DREDGING AND EXCAVATING QUANTITY FOR CHANNEL 71 6.4 TABLE OF AREA SUBJECT TO INVESTIGATION FOR CONSTRUCTION PURPOSES 71 6.5 PROPOSAL OF PLANNING FOR EXECUTION OF DREDGING AND EXCAVATING AND EXPECTED CONSTRUCTION PROGRESS 71 CHAPTER 7. CONCLUSION AND PROPOSAL 74 7.1 CONCLUSION 74 7.2 PROPOSAL 76 APPENDIX NO. 1 77 APPENDIX NO. 2 78 APPENDIX NO. 3 79 APPENDIX NO. 4 80 APPENDIX NO. 5 81 Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 2 CHAPTER 1: INTRODUCTION 1.1. PROJECT BACKGROUND Mekong Delta Transport Infrastructure Development Project (MDTIDP) of the Vietnamese Government was financed by the World Bank. The project consists of four components as follows: + Component A: Investment for national roads. + Component B: Investment for national waterway corridors . + Component C: Investment for local waterway corridors and provincial roads. + Component D: To provide technical support to the Ministry of Transport and Mekong Delta provinces . In component B: Investment for national waterway corridors in Mekong Delta areas including: inland waterway corridor 2 (corridor 2 ) and inland waterway corridor 3 (corridor 3), among them: + Phase 1 of component B: the inland waterway corridor 2 (corridor 2) is being rehabilitated/dredged from chainage km 80+00 to chainage km 253+00 corresponding to the contract packages NW1; NW2; NW3 and NW4. + Phase 2 of component B: To carry out rehabilitation/dredging of the rest of corridor 2 and last section of corridor 3 from chainage km 207+00 to chainage km 310+00 corresponding to packages NW11A; NW12A, etc. 1.1.1. The national inland waterway corridor 2 (corridor 2): Start point: from Ho Chi Minh City (HCMC) at Km 00+000 End point: at km 253+000 – Vam Ray (confluence of Rach Gia Ha Tien canal and Tam Ngan canal). The length of corridor is 253 km. Construction locations are located in Chi Minh City and related provinces: Long An, Tien Giang, Đong Thap, An Giang and Kien Giang. Picture 1.1. Map of corridor 2 The corridor 2 runs through main canals such as: Kenh Te, Kenh Đoi, Cho Đem Ben Luc river, Vam Co Đong river, Thu Thua canal, Vam Co Tay river, Rach Chanh canal, Nguyen Van Tiep canal (canal Thap muoi # 2), Tien river, Vam Nao river, Hau river, Tri Ton canal Hau Giang, Tam Ngan canal connecting Rach Gia Ha Tien canal. The total length of corridor 2 is 253 km. Corridor 2 comprises of the following sections: + Section connecting Saigon river with Vam Co dong river KM 0+000 to KM 32+000 with the length of 32 km through Te canal, Doi Canal, Cho Dem Ben Luc river. + Section connecting Vam Co dong river with Vam Co Tay river from KM 32+000 to KM 51+120 with the length of 19.12 km through Vam Co dong river, Thu Thua canal, Vam Co Tay river. Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 3 + Ending section connecting Vam Co dong river with Tien River from KM 51+120 to KM 143+800 with the length of 92.68 km through Chanh creek, Nguyen Van Tiep canal to Tien River. + Section connecting Tien River and Hau River from KM 143+800 to KM 190+000 with the length of 46.20 km through Cu Lao Tay –Vam Nao River – Hau River. + Section connecting Hau River to Rach Gia Ha Tien canal from KM 190+000 to KM 252+700 with the length of 62.70 km through Tri Tin Hau Giang canal, Tam Ngan canal. 1.1.2. The national inland waterways corridor 3 (corridor 3) The waterways corridor 3 is 450 km long, beginning from Hochiminh city through areas such as My Tho - Tra Vinh - Ca Mau – Soi creek and ending at Thailand Gulf . The corridor 3 runs parallel with the coastal line down to the South through Ca Mau and next up to the north of Rach Gia. Phase 2: Execution of section connecting from Hau River to Ca Mau through Đai Ngai creek , Phu Huu Bai Xau canal, Du Tho river, Co Co river, Vam Leo Bac Lieu river, Bac Lieu Ca Mau canal to Ca Mau connecting Ganh Hao river. Among them, section of Lieu Ca Mau canal from Lang Tram Bridge to Ganh Hao river is about 7 km long which has already been dredged under Vietnam Inland Waterway Rehabilitation Project and Can Tho Port. The total designed length of corridor 3 (phase 2) is 103 km. Picture 1.2. Map of corridor 3 – phase 2 1.2. LEGAL FOUNDATION FOR DESIGN WORKS (LEGAL DOCUMENTS) In accordance with Construction Laws No. 16/2003/QH11 dated on 26/11/2003 promulgated by the National Assembly; In accordance with the Decree No.12/2009/NĐ-CP dated on 10/02/2009 issued by the Vietnamese Government stipulating works construction investment management; In accordance with the Decree No.209/2004/NĐ-CP dated on 16/12/2004 issued by the Vietnamese Government regarding the management of quality of construction works; In accordance with the Decision No. 741/QĐ-BGTVT dated on 06/4/2007 issued by the Ministry of Transport approving of the Delta Transport Infrastructure Development Project (MDTIDP); In accordance with the Contract “Phase 2 Design and Survey Consultancy Service” under the Delta Transport Infrastructure Development Project (MDTIDP) dated on 9/5/2007 signed between the Waterways Projects management Unit (PMUW) and DHV B.V. (The Netherlands); Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 4 In accordance with the Subcontract “ The Phase 2 Design and Survey Consultancy Service” under the Delta Transport Infrastructure Development Project (MDTIDP) No 002/2010/HĐTV-MDTIDP dated on 20/01/2010 between DHV B.V. (The Netherlands) and Hong Hung Land and Waterways Construction and Consultancy Ltd. Company; In accordance with the Report of Feasibility Study issued by Louis Berger Group, Inc. in partnership with ROYAL HASKONING for the Delta Transport Infrastructure Development Project (MDTIDP) dated on 6/2006. 1.3. SUMMARY OF APPROVED FS – PHASE 2 (COMPONENT B) FOR THE INVESTMENT OF WATERWAYS 1.3.1. Corridor 2 Corridor 2 (phase 2) is executed with the length of 80 km From Km0+00 to Km80+00; the start point is defined at Km00 i.e. the confluence of Te Canal and Saigon river; The ending route is at Km80+00 on Nguyen Van Tiep canal (Thap Muoi # 2 canal) with the Northern bank (right bank) located at My Phu Hamlet – My Hanh Dong Commune and the Southern bank (left bank) located at Lang Bien Hamlet - My Hanh Dong Commune, Cai Lay District, Tien Giang Province. The upgrading of corridor 2 to class nr. 3 of inland waterway system that allow to effectively cater of barges up to 2x400Ton and self-propelled barges with the capacity of 300 Ton. This corridor will be used for the long-distance transport and inter-province transport through the north of Mekong Delta including Kien Giang province, An Giang province, Đong Thap province, Long An province and Ho Chi Minh city. The major commodities are being transported thru this corridor are construction materials, woods, rice, gasoline, petrol and fertilizer. The works executed are shown in table 1.1 as follows: Table 1.1 Scope of works to be invested and executed on Corridor 2 – Phase 2 Description Names of rivers and canals length (Km) Construction scale Unit Quantity Dredging Kenh Te-Cho Dem- Ben Luc-Thu Thua 00 - 47.90 47.9 km m3 1,452,658 Rach Chanh - Nguyen Van Tiep 52.60 – 74.00 21.40 km m3 2,145,055 Nguyen Van Tiep 74 – 80 6 km m3 576,392 Slope protection Kenh Thu Thua (43.2) – 44.43) 1.30 km m(meter) 1,300 Dock Rach Chanh 52.60 1 each Aids to navigation 80km beginning corridor 2 80 set Bridge 80km beginning corridor 2 5 each new Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 5 Cost for upgrading 80 km waterways in the first section of corridor 2 is shown in the following table Description Quantity Cost (US$) (estimated in 2005) 1. Signing buoys 80 km 402.226 2. Bridge 05 1,706,568 3. Slope protection 1,300 m 1,144,463 4. Dredging 4,174,105 m3 9,463,835 5. Ship lock (on Rach Chanh) 1 7,617,000 Site clearance and resettlement 80 km beginning corridor 2 6,200,000 Total 26.534.092 US $ 1.3.2. Corridor 3 Corridor 3 (phase 2) is executed with the length 103 Km. The start point is defined at Dai Ngai, Tran De district, Soc Trang province with the waterways milestone at Km207+00; The ending section is defined at Km310 near Gia Rai town, Bac Lieu province. The corridor will be used for long transport and inter-province transport through the north of Mekong Delta including Kien Giang province, An Giang province, Đong Thap province, Long An province and Hochiminh city. The major commodities are being transported thru this corridor are construction materials, woods, rice, gasoline, petrol and fertilizer. The works executed are shown in Table 1.2 as follows: Table 1.2 Scope of works to be invested and executed on Corridor 3 – Phase 2 Description Names of rivers and canals Length (Km) Construction scale Unit Quantity Dredging Rach Đai Ngai, Kenh Phu Huu Bai Xau, Song Du Tho, Song Co Cò, Song Vam leo Bac Lieu 207 – 285.5 78.40 km m3 2,540,603 Kenh Bac Lieu Ca Mau 285.5 - 310 24.50 km m3 1,461,965 Aid to navigation - buoys 103km corridor 3 207 - 310 103 set Cost for upgrading waterways in the first section of corridor 3 from Km 207-Km 310 is 10.588.207, US $ (as estimated in 2005). within: + Cost of dredging works: 9.047.913 US $, + Cost of aids to navigation: 313.294 US $, + Cost for site clearance and resettlement: 1.200.000 US $, 1.3.3. Designed class of waterways and barges defined in appproved basic design Designed class of waterways and barges which defined by FS are shown in table 1.3 And 1.4 Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 6 Table 1.3 Dimensions of barges as defined by FS Class Capacity (Ton) Length [m] Width [m] Water line [m] 50% / 90% 50% / 90% 50% / 90% Class nr 3 (South) Self-propelled barges 101 - 300 25 / 36 6.50 / 7.50 2.15 / 2.55 Barges 2*200/250/400 80 / 87 8.5 / 9.4 2.30 / 2.80 Table 1.4 Dimensions of waterways as defined by FS Length [km] Bed Width [m] LAD (95%) [m] Slope m = [V:H] Corridor 2 0 - 170 30 3,0 1 : 3 Corridor 3 80 - 450 26 3,0 1 : 3 1.3.4. Water level defined in appproved basic design Refer to Feasibility Study report, water level was investigated, calculated by the network model The result of designed water level for both corridors are shown in the following table : Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 7 1.4. SCOPE OF DESIGN WORKS This report presents the content of the technical design of dredging and upgrading channel of Corridor 2(Km0+00 – Km80+00) and corridor 3(Km207+00 – Km310+00) which will be used to cater for making shop drawings for construction later. The data has been updated from the reports of project as approved including dimensions of the engineering works, size of channel, barges lower case designed and calculated, system of signing buoys and slope protection. The technical design has also been updated and based on the barges as calculated and specified in the local waterways standard TCVN 5664-2009. The proposals regarding the barges calculated and channel regulations compliant with natural conditions and exploitation on the sections of river and canal that are invested and upgraded. The specific content of design: + Calculation of water level of transportation; + Calculation of size and channel elevation; + Statistics of land clearance area, estimation of cost for both site clearance ; + Proposed construction method, the construction schedule of dredging waterway; + Proposal for the method of transporting waste soil, location and scale of dump area and waste water drainage; + Proposal for the method of safety of waterway transport during the execution; + Construction of bridges and roads at rural area at site clearance for the purpose of enlarging the channels. The following work items are not shown in the design of dredging channel (which is to be shown in another separate document): + Removed obstacles from the way-leave of the designed channels; + Navigation signs for local waterways; + Report of site clearance for the purpose of executing widening of channels + Detecting and disarming unexploded mines and bombs (UXO); Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 8 + Assessing the environmental impact, managing the environment during and after dredging and excavation works 1.5. WORKS LEVEL In accordance with the scope of civil works involoved, this project component belongs to the Classification IV…or belongs to the category IV as per the Appendix 1 – Chapter 5: Classifications and Grading of Construction Works – the Decree 209/2004/NĐ-CP issued by the Vietnamese Government. In accordance with the design of the civil works, the dredging channel works to level Category 3 , Table C1 – Appendix, Specification of National Engineering regarding Vietnam Building Code on Classifications and Grading of Civil and Industrial Buildings and Urban Infrastructures ) QCVN 03: 2009/BXD issued with the instruction Circular 33/2009/TT-BXD dated September 30 th , 2009; Works on dredging of waterway channels may be increased in quantities due to the slow process of deposition of fine sediments along the channels. In accordance with the regulations of Vietnam TCXDVN285:2002 concerning irrigation works, the main specifications of design of the works put out of exploitation for more than 10 years are likely to de downgraded with 1 level in the categorisation system. In conclusion, the class of waterway will be designed as class IV. 1.6. THE MANAGEMENT AND PROJECT IMPLEMENTATION UNIT FOR PHASE 2 – COMPONENT B Employer : Vietnam Inland Waterway Administration Projects Management Unit of Southern Inland Waterways (PMU - SIW) Main Consultant : DHV.BV (Netherlands). Representative offices: 2A Pham Su Manh, Hoan Kiem, Ha Noi Project offices: 1041/80 Tran Xuan Soan, Tan Hung ward, Q 7, HCM city; Tel : +84 8 377 4165; Fax : +84 8 377 4166. Sub-Consultant: Hong Hung Land and Waterways Construction and Consultancy Ltd. Company Address: Số 292 Dien Bien Phu – ward 22 – Binh Thanh district – HCM city Tel : 0862.745.290 - fax: 0838.992.620 Email: honghung161006@gmail.com Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 9 CHAPTER 2. DESIGN BACKGROUND 2.1. DOCUMENTS AND DATA SOURCES USED FOR DESIGN The Report of feasibility study issued by Louis Berger Group, Inc. in partnership with ROYAL HASKONING for the Delta Transport Infrastructure Development Project (MDTIDP) dated 6/2006. Documents of Topographical Surveys of the corridor 2 from (km00 − Km80+750); the corridor 3 from (Km207+00 – Km314+00). To be established by the drawing scale of 1/500 – 1/1000 under the national system, co-ordinate system VN2000, central meridian 105, radiating segment 3 degree and corridor 2 with the co-ordinate system VN2000, central meridian 105º45’, the radiating segment 3 degree was set up by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with DHV B.V. (Netherlands) in 7/2010. Documents of geological surveys of the works of the corridor 2 from (Km00) to (Km80+750); the corridor 3 form (Km207+00 – Km314+00) was set up by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with DHV.BV (Netherlands) in 7/2010. Documents of water level surveys and water level calculation over a period of 10 years (2000-2009) on the Corridor 2 from Km00 to Km80+750; the corridor 3 from (Km207+00 – Km314+00) was set up by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with DHV.BV (Netherlands) and the Southern Hydro meteorological Center in 7/2010. The Reports of soil environment, water environment, air and water plants environment on the corridor 2 from (Km00 to Km80+750); the corridor 3 from (Km207+00 – Km314+00) was made by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with Southern Irrigation Science Institute and DHV.BV (Netherlands) in 11/2010. The reports of proposals regarding the calculated vessels, the the calculated water levels and dimensions of the channels carried out by DHV.BV (Netherlands) in 7/2010 Documents of investigation of all channels, the aids to navigation system of corridor 2 from (Km00) to (Km80+750) and the corridor 3 from Km207+00 to Km314+00) was set up by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with Southern Waterways Management Department, Ports Service of Vietnam Domestic Waterways Bureau in 7/2010. 2.2. STANDARDS AND REFERENCE DOCUMENTS Apply the standards system approved by the Ministry of Transport under the Decision 2406/QĐ- BGTVT dated 9/11/2006 regarding the approval of “ the standard frame applied for projects design surveys WB5) in which the standards applied for dredging design shall include: Standard TCVN 5664 - 1992 concerning classification Vietnam Domestic Waterways Engineering issued under the Decision 347/QĐ of the State Science Committee on 23 May, 1992; Standard TCVN 5664 - 2009 concerning grading Vietnam Domestic Waterways Engineering issued under the Decision 3082/QĐ-BKHCN of the State Science Committee on 31 December, 2009; Standard TCVN 4447 : 1987 concerning Soil Works – Specification of Execution and Acceptance; Section standard 22 TCN 269-2000 concerning the Rules of Vietnam domestic waterways signalling system issued under the Decision 4099/2000 QĐ-BGTVT of the Ministry of Transport dated 12/01/1978; Design process of seaway canals issued under the Decision 115-QĐ/KT4 the Ministry of Transport dated 12/01/1978; Standard of works design for adjustment of channels 22 TCN-241-98;. Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1+2 General Report of Dredging Waterway of Corridor No 2&3 Page 10 Rules of Execution and Acceptance dredging works and embankment for waterways transport implemented by hydraulic mechanical issued under the Decision 924/QĐ-KT4 of the Ministry of Transport dated 21/04/1975; Standard TCVN 4253:1986: Foundation of waterways works – design standards; Standard 22 TCN 222-95: loading capacity and impact by wave and vessels on waterways works; River dynamics by Luong Phuong Hau, Hanoi 1992. Also reference the Navigation Chanel Design Standard 2.3. ADJUSTMENT OF DESIGN Document of technical design was to be adjusted on this edition based on the following documents: The report of investigation of RENARDET S.A.CONSULTING ENGINEERS, investigating the design documents dredging channels for the corridor 2 and 3 on first publication in 9/2010 by Hong Hung Land and Waterways Construction and Consultancy Ltd. Company in collaboration with DHV.BV (Netherlands). The basic content is shown as follows: The adjustment is to be done in compliance with the practical situation of transport facilities, topographical condition and residents, land occupations for residence, factories, industries, economic activities, shops, offices, social infrastructures and other amenities and encroachments made by local residents along the channels, specifically: + The width of channel bed is to be adjusted in the dimensions: B = 26m – 30m; in certain special condition along certain waterways sections, it is optional to downsize the bottom width of the design channel to B=22m (such as 2 Southern Channels Project); + The depth of channel H = 3m; + Bend radius of the channels is to be compliant with the local topographical conditions, site clearance, proverbially the minimum radius R = 150m along with the full sign system for the purpose of transport safety; + Assign PMU and Supervision Consultancy to decide the site clearance in certain areas B=22m and R = 150m; + Assign PMU and Supervision Consultancy to decide the given dredging channels to ensure the schedule, quantity and cost of the works; + Re-inspect the probability of extending silt deposits in order to maintain the works; + Inspect the probability of shore falling down calculating the density of transport facilities, especially express vessels). With reference to scale of revetment construction investment projects of canals such as Thu Thua Revetment Project on left bank in Thu Thua Town – the employer is Long An Agriculture and Rural Development Department. [...]... 44 80 41 84 90 -7 0 -6 5 -4 5 -6 0 -5 5 -3 0 -4 8 -2 1 -4 8 - 23 -4 0 -4 -2 9 3 - 43 -8 45 -8 41 72 39 75 35 78 95 -1 00 - 93 -9 5 -8 8 -7 8 - 53 -6 8 -4 5 -6 8 -4 6 -6 0 -2 5 -4 5 -1 7 -6 1 -3 0 40 -3 0 35 66 33 70 28 71 98 - 130 - 120 - 120 -1 13 -9 9 -8 0 -8 8 -7 0 -8 7 -7 0 -7 9 -5 0 - 62 -3 5 -8 0 - 52 33 -6 5 32 62 26 64 20 64 100 -2 0 0 -1 90 -1 80 -1 50 -1 40 -1 40 - 130 -1 40 - 130 - 120 -1 00 -1 10 -9 0 - 120 -1 10 00 -1 10 0 40 -1 0 40 -2 0 40 Km Km0+00... 37 33 29 23 23 24 26 25 32 30 28 Max 171 158 161 118 129 131 1 23 1 23 124 128 171 Min - 121 - 125 - 135 - 120 - 136 - 122 - 128 -1 17 -1 07 -1 10 - 136 Amplitude 29 2 28 3 29 6 23 8 26 5 25 3 25 1 24 0 23 1 23 8 25 9 Average Nha Be 20 01 65 63 56 45 45 48 49 48 55 51 53 Max 199 1 93 194 129 150 154 140 139 136 138 199 Min -9 4 - 82 -8 5 -8 0 -8 8 -9 8 -8 1 - 83 -7 9 -1 03 -1 03 Amplitude 29 3 27 5 27 9 20 9 23 8 25 2 22 1 22 2 21 5 24 1 24 5 Ben... Report of Dredging Waterway of Corridor No 2& 3 Items frequency (%) Đai Ngai TV11 TV 12 TV 13 TV14 TV15 TV16 TV17 TV18 TV19 TV20 18 85 - 83 - 63 -4 0 -3 7 -4 1 -4 5 -2 9 -2 1 7 0 -5 0 19 90 -1 05 -8 4 -5 7 -5 4 -6 0 -6 5 -4 4 -3 5 -5 - 13 -7 0 20 95 - 130 -1 08 -7 5 -7 4 - 82 -8 8 - 63 - 53 -1 8 -2 9 - 93 21 98 -1 50 - 130 - 92 -9 0 -1 00 -1 07 -7 8 -6 8 -2 9 -4 1 -1 12 22 100 -2 0 0 -1 80 - 130 - 130 -1 40 -1 40 - 120 - 120 -6 0 -7 0 -1 60 Milestone (Km) Km207... 44 68 38 63 63 63 57 98 58 106 58 1 13 65 27 38 30 40 25 50 29 50 26 49 32 62 34 60 27 55 61 55 55 94 56 1 02 55 107 70 12 22 15 25 12 35 15 37 14 36 20 53 23 50 14 44 58 44 53 90 58 97 52 1 02 75 -6 3 -2 5 -3 20 1 24 0 22 5 40 11 40 1 32 56 32 51 85 51 93 48 96 80 -2 4 -1 7 -2 0 - 13 -2 0 6 -1 4 10 -1 5 8 -9 27 -2 30 -1 4 21 53 21 48 81 48 87 45 90 85 -4 6 -4 0 -4 0 -3 5 -3 6 -1 0 -2 9 -5 -3 0 -7 -2 4 13 -1 5 17 -2 8 7... Average 30 26 21 16 15 15 19 18 24 22 21 Max 166 1 63 171 140 144 145 144 1 43 141 1 43 171 Min -1 56 -1 74 -1 62 -1 78 -1 76 -1 83 -1 72 -1 67 -1 58 -1 62 -1 83 Amplitude 32 2 33 7 33 3 31 8 32 0 32 8 31 6 31 0 29 9 30 5 31 9 Average 97 87 79 58 59 65 62 59 68 65 70 Max 26 6 24 7 24 9 138 175 188 157 150 145 141 26 6 Min -2 5 -2 1 -3 4 -2 4 -2 1 -3 9 -2 1 -2 5 - 13 -3 3 -3 9 Amplitude 29 1 26 8 28 3 1 62 196 22 7 178 175 158 174 21 1 Average 37 33 29 ... 12 55 16 35 37 37 43 43 43 45 57 62 38 13 60 2 21 26 27 32 30 34 37 50 53 26 14 65 - 13 6 14 15 17 18 23 27 42 44 12 15 70 -3 0 -9 2 3 5 2 10 16 34 34 -1 16 75 -4 7 -2 8 - 12 -9 -1 0 -1 4 -2 4 25 24 -1 9 17 80 -6 5 -4 5 -2 6 - 23 -2 6 -2 8 -1 5 -8 16 12 -3 5 Page 17 Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway Corridors Improvementphase 2 Plus Supervision Of Phase 1 +2 General Report. .. 198 20 5 Min in cm -1 75 -1 88 Amplitude in cm 35 5 Average in cm 20 04 20 05 20 06 20 07 20 08 20 09 in cm 14 13 17 15 22 21 17 194 195 20 0 20 0 20 1 196 1 93 20 5 -1 78 -1 97 -1 96 -1 95 -1 92 -1 95 -1 86 -1 78 -1 97 38 6 38 3 39 1 39 1 39 5 3 92 39 6 3 82 37 1 38 4 1 1 -1 0 -1 1 6 7 Max in cm 186 198 20 1 1 93 186 20 5 20 5 20 0 20 5 Min in cm -2 0 6 -2 2 0 -2 1 1 -2 0 5 -2 1 5 -2 1 3 -2 1 5 -2 0 4 -2 2 0 Amplitude in cm 3 92 418 4 12 39 8 401 418 420 404... 20 09 in cm Average 6 3 1 5 0 -1 4 4 8 7 4 Max 1 42 137 150 158 141 139 147 148 1 52 157 158 Min - 23 7 -2 4 4 - 23 7 - 23 9 -2 6 7 -2 7 0 -2 6 5 -2 5 8 -2 6 0 -2 5 8 -2 7 0 Amplitude 37 9 38 1 38 7 39 7 408 409 4 12 406 4 12 415 401 Average 22 19 16 14 12 9 14 14 21 18 16 Max 138 140 145 136 135 140 137 140 144 137 145 Min -1 45 -1 64 -1 57 -1 58 -1 68 -1 69 -1 73 -1 70 -1 60 -1 58 -1 73 Amplitude 28 3 304 3 02 294 30 3 30 9 31 0 31 0 30 4 29 5 30 1... Thanh 2 Average in cm 30 30 30 Max in cm 22 0 21 8 22 0 Min in cm -1 98 -1 97 -1 98 Amplitude in cm 418 415 417 Tran Đe Average in cm 30 29 25 29 25 24 30 32 35 33 29 Max in cm 85 72 67 69 68 72 71 78 75 73 85 Min in cm - 42 -3 0 -2 5 -2 5 -2 5 -3 0 -2 9 -2 0 - 23 - 23 - 42 Amplitude in cm 127 1 02 92 94 93 1 02 100 98 98 96 100 Ca Mau Page 14 Mekong Delta Transport Infrastructure Development Project (MDTIDP) Main Waterway. .. 77 165 82 185 85 20 3 15 118 133 120 133 117 140 114 135 110 1 32 1 13 135 1 03 124 1 03 124 73 124 74 150 78 169 80 1 83 20 1 12 124 1 12 125 110 131 107 127 104 124 107 128 98 118 97 118 77 118 71 138 75 154 77 167 25 105 117 105 118 1 03 122 100 120 97 117 101 122 93 1 12 90 1 12 75 1 12 69 130 72 146 74 158 30 97 109 98 109 96 115 94 1 12 91 109 94 115 88 105 85 105 73 105 67 125 70 140 71 151 35 89 100 91 101 . coconuts, rice fields and gardens along channel sides. The bottom width of channel varies is 37 m to 60 m. The average bed elevation varies is -3.50 m ND to -6.0 m ND. The shape of the channel is bend. Delta Transport Infrastructure Development Project (MDTIDP); In accordance with the Contract “Phase 2 Design and Survey Consultancy Service” under the Delta Transport Infrastructure Development. 1.3.4. Water level defined in appproved basic design Refer to Feasibility Study report, water level was investigated, calculated by the network model The result of designed water level for both