1. Trang chủ
  2. » Kinh Doanh - Tiếp Thị

public utilities management challenges for the 21st century phần 3 doc

12 321 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 12
Dung lượng 258,4 KB

Nội dung

Water System Adaptation l Approach: u Invest in actions that mitigate uncertainty and enhance flexibility and resiliency so that system managers can continue to meet their responsibilities. l Identify potential impacts through downscaling and characterizing system specific strengths and vulnerabilities l Adjust operations to test system flexibility l Develop portfolio of adaptation options l Engage in ongoing research & collaborate Portfolio of Adaptation Options l SPU identified a series of intra-system modifications and new supply options – and grouped them into Tiers. l Applied the effects on supply using Tier 1 intra-system modifications. l Where Tier 1 modifications did not restore supply fully, identified the need for subsequent Tiers. Tier 1 Solutions/Optimize Existing Supply l Modify storage level of Cedar Reservoir and replace overflow dike l Change rule curve/operating procedures for the Tolt Reservoir l Make modifications to Lake Young Reservoir Next Tiers Available to SPU l Tier 2 – Next Tier of Intra-System Modifications u Include additional use of Lake Youngs Storage (402-497) u Modified/optimized conjunctive use operations u Additional conservation programs after 2030 l Tier 3 – Greater Use of Storage u Higher refill levels at Chester Morse Lake (1566') u Higher flood pool level at CML (assumes max level increased to 1575) l Tier 4 – New Supply Alternatives u Deeper drawdown of South Fork Tolt reservoir (1660’) u Deeper drawdown of Lake Youngs (28’), Cedar Filtration u Use of Dead Storage for normal supply, after pumping plant replacement u Develop North Fork Tolt Diversion u Develop Snoqualmie Aquifer Project u Northshore and Woodinville develop Weyerhaeuser/Everett supply u Reclaimed water projects in Retail Service Area u Additional conservation programs l Tier 5 – New Supply Concepts u Reclaimed water projects in Wholesale Service Area u Desalination plant u Higher refill levels at Tolt reservoir (raising ring gate) u Etc. [...]... Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line $ Environmental/ social costs Claims costs Labor and equip costs 100+ 90 100% Reactive 80 70 60 50 40 30 20 10 5 100% Proactive Estimated Number of Sewer Backups per Year A Sample “Bathtub Curve” for the Sewer Maintenance Program Curve” An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom... 50 40 30 20 Estimated Number of Sewer Backups per Year 10 5 100% Proactive A Sample “Bathtub Curve” for the Sewer Maintenance Program Curve” An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line $ Regulatory non-compliance costs Environmental/ social costs Claims costs Chemical root treatment costs Labor and equip costs 100+ 90 100% Reactive 80 70 60 50 40 30 20 10... Backups per Year A Sample “Bathtub Curve” for the Sewer Maintenance Program Curve” An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line $ Regulatory non-compliance costs Environmental/ social costs Grease abatement costs Claims costs Chemical root treatment costs Labor and equip costs 100+ 100% Reactive 90 80 70 60 50 40 30 20 Estimated Number of Sewer Backups per... costs Claims costs Chemical root treatment costs Labor and equip costs 100+ 100% Reactive 90 80 70 60 50 40 30 20 Estimated Number of Sewer Backups per Year 10 5 100% Proactive A Sample “Bathtub Curve” for the Sewer Maintenance Program Curve” . Curve ” ” for the Sewer Maintenance Program for the Sewer Maintenance Program An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line 100+90807060504 030 2010 5 Estimated. Curve ” ” for the Sewer Maintenance Program for the Sewer Maintenance Program An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line 100+90807060504 030 2010 5 Estimated. Curve ” ” for the Sewer Maintenance Program for the Sewer Maintenance Program An Example: Tying Together Service Levels, Lifecycle Costing, and the Triple Bottom Line 100+90807060504 030 2010 5 Estimated

Ngày đăng: 09/08/2014, 19:22