1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Energy transition roadmap presentation

33 3 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 33
Dung lượng 4,37 MB
File đính kèm Energy Transition Roadmap Presentation.rar (4 MB)

Nội dung

• Overview Vietnam’s Clean Energy Transition • Global and National Commitments • Different targets: NDC – PDP8 – JETP • Clean Energy Transition Roadmap • Technological Feasibility • Cost and Affordability • Energy Security • Grid Integration and Stability • Environmental Impact • Policy and Regulatory Framework • Stakeholder Engagement

Nhien Ngo Hanoi, 20 July 2023 • Overview Vietnam’s Clean Energy Transition • Global and National Commitments • Different targets: NDC – PDP8 – JETP • Clean Energy Transition Roadmap • • • • • • • Technological Feasibility Cost and Affordability Energy Security Grid Integration and Stability Environmental Impact Policy and Regulatory Framework Stakeholder Engagement Hanoi, 20 July 2023 Installed capacity 2011 – 2022 Installed capacity 2022 (Total: 78,8 MW) GW 77 80 69 70 17 60 55 50 39 40 34 30 23 20 43 10 25 18 28 45 49 17 19 Biomass 356 1% 17 Solar 16567 21% Import 619 1% Coal 25302 32% 22 20 78.8 GW 21 22 21 Wind 4667 6% 17 16 13 12 Oil 1579 2% 55% 10 2011 2012 2013 Coal 2014 Oil 2015 Gas 2016 Hydro 2017 Wind 2018 Solar 2019 Biomass 2020 Import 2021 2022 includes hydro, wind & solar Hydro 22345 28% Gas 7398 9% Source: VIET’s analyze based on the data published by EVN Jan 2023 TWh Power generation by sources 2011 - 2022 Power generation by sources 2022 (Total 268 TWh) 300 Average annual growth 4%/year Average annual growth 11%/year 250 237 243 11 255 30 Other 4.1 2% RE 34.8 13% 268 35 includes hydro, wind & solar 217 200 195 Gas 29.5 11% 180 161 150 100 48% 142 104 117 126 Hydro 95.0 35% 50 2011 2012 2013 2014 2015 Other 2016 RE 2017 Hydro 2018 Gas 2019 Coal 2020 2021 2022 Coal 105.0 39% Source: VIET’s analysis based on the data published by EVN Jan 2023 Installed capacity (GW) and share (%) by market participation Share of power capacity based on ownership in 2022 Import 0.6 1% Imported power plants, 0.8, 1% Strategic hydro power plants, 8.9, 11% EVN 8.9 11% EVNGENCO 4.6 6% Private 33.1 42% EVNGENCO 8.4 11% Direct trading power plants, 30.9, 38% Indirect trading power plants, 40.4, 50% EVNGENCO 7.6 9% BOT 7.7 10% TKV 1.8 2% PVN 6.1 8% Source: VIET’s analyze based on the data published by EVN Jan 2023 POWER PRODUCTION AND DEMAND BY AREA (BILLION KWH) Demand 800 600 95.89 121.86 123.19 121.39 Production North - Central transmission volume (GWh) 400 200 North to Centre 10 11 10 11 Centre to North 53.78 Centre – South transmission volume (GWh) 4000 24.48 3000 2000 1000 NORTH CENTRE SOUTH Source: VIET’s analyze based on the data published by EVN NLDC Jan 2023 Centre to South Southe to Centre 2022 Transitioning project (VND/kWh) Solar farm: 1.184,9 Floating solar: 1.508,27 Onshore wind: 1.587,12 Offshore wind: 1.815,95 9.21 GW solar (150 plants) 7.66 GW RTS (104k systems) 5.46 GW wind (105 plants) Technology Ceiling price (VND/kWh) Solar farm 1.184,9 Floating solar 1.508,27 Onshore wind 1.587,12 Offshore wind 1.815,95 Source: MOIT, Decision 21/QD-BCT dated Jan 2023 Source: EVN, updated to 14 Jul 2023 https://www.evn.com.vn/c3/nang-luong-tai-tao/Cac-du-an-NLTT-chuyen-tiep 141-2014.aspx Capacity of plants participate in power market by 2022 • By end of 2021, 47.3 GW (61% total system capacity) participated in power market • 2.9 GW expected to join directly in 2022 • Plants 1 regulated > regulated

Ngày đăng: 31/07/2023, 11:07