Trang 21 OUTLINE OF THE SAIGON RIVER CROSSING TUNNEL
1 OUTLINE OF THE SAIGON RIVER CROSSING TUNNEL
2.CONSTRUCTION OF IMMERSED TUNNEL
2-1Casting Basin
2-2Construction of Immersed Tunnel Units
2-3Dredging, Towing and Immersion
Trang 31 OUTLINE OF THE SAIGON RIVER CROSSING TUNNEL
Trang 4PLAN & PROFILE OF THU THIEM TUNNEL
Trang 5SOIL STRATA ALONG THE TUNNEL ALIGNMENT
Trang 6CROSS SECTION OF IMMERSED TUNNELcauduongonl
ine (c
om.vn,c
om,ne
t,org)
Trang 7Cross section of Cut & Cover tunnel and Approachescauduongonl
ine (c
om.vn,c
om,ne
t,org)
Trang 82 CONSTRUCTION OF IMMERSED TUNNEL
Trang 9Construction Procedure
Towing Outfitting Fabrication of Units
CASTING BASIN
Casting Basin Construction
Inner work Back filling Immersion
Trench Dredging CONSTRUCTION SITE
Trang 10LOCATION OF CONSTRUCTION SITE
Trang 12General View of the Casting Basin
Trang 13Cross Section of the Casting Basin
Trang 14The Typical Case of Casting Basin
Trang 152-2Construction of Immersed Tunnel Units
Trang 16Image of the Tunnel
Units Fabrication in
the Casting Basin
OR SHIP YARD CASTING BASIN
IMMERSED TUNNEL UNIT
Trang 17Unit Fabrication Construction Sequence
End Steel Shell
Casting Basin Foundation
End Steel Shell
Trang 18Typical Case of Fabrication Tunnel Units
Fabrication Steel Shell
Trang 21Fabrication Tunnel Units
Trang 232-3 Dredging, Towing and Immersion
Trang 24Trench Dredging and Foundation
Trang 28Image of Immersion
Towing the submerging unit up to around 10m distance
from previous submerged unit.
Barge for Immersion
Submerging Unit Submerged
Unit
10m
Barge for Immersion
Bearing Jack Temporary support Alignment Tower
Keeping10m distance from previous submerged unit, Unit
is submerged vertically.
Submerging Unit Submerged
Temporary support
Alignment Tower Barge for Immersion
Stop Submerging when depth of bottom of Unit is almost
same as depth of top of previous submerged unit
Submerging Unit Submerged
Temporary support
Alignment Tower Barge for Immersion
Submerging unit is pulled toward to previous submerged unit cauduongonl
ine (c
om.vn,c
om,ne
t,org)
Trang 29Image of Unit Connection
Trang 30Pulling the unit by jacks on the top slab Rubber gasket starts to be compressed Both side water presser are balanced.
Trang 31Draining water between bulkheads
Rubber gasket is compressed more by the water pressure Unit is pushed by difference of both side water pressure.
Trang 32Completion of draining water
Rubber gasket is fully compressed and be watertightcauduongonl
ine (c
om.vn,c
om,ne
t,org)
Trang 33Image of Sand Flow Work
TEMPORARY SUPPORT PAD
Trang 34Image of
Backfilling
Work
(GRADED GRAVEL 100-200KG/PIECE)
LOCKING BACK FILL SAND JETTED FOUNDATION
GENERAL BACK FILL PROTECTIVE CONCRETE
-14.50
1 : 2
APPROX EXISTING RIVER BED LEVEL
Trang 35COMPLETION OF IMMERSED TUNNEL
Trang 36TRAFFIC INSIDE THE IMMERSED TUNNEL