1. Trang chủ
  2. » Tất cả

Vdp z8 weekly report no 01 01aug2018 07aug2018

10 2 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) VINA DAI PHUOC CORPORATION ◊ Dai Phuoc Commune, Nhon Trach Dist, Dong Nai Province, Vietnam ◊ Tel: (84) 064 8689167 ◊ Web:www.daiphuoc-lotus.com WEEKLY PROGRESS No.01 (From 01 August, 2018 to 07 August, 2018) Project Team Dong Nai, date 01 August 2018 WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) Table of Contents I Manpower & Machines, Weather II Work done in the week III Construction Sequence IV Progress tracking V Quantity concrete casting record in week……………………………………………………… VI Material Status VII Schedule of Testing VIII Documents Status IX Safety Report X Site pictures WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) I Manpower, Machine and Weather Manpower Weather From 01ST AUG 2018 to 07TH AUG 2018 Weather/ Temperature (oC) Wed Thu Fri Sat Sun Mon Tue 01-Aug 02-Aug 03-Aug 04-Aug 05-Aug 06-Aug 07-Aug 25-35 25-35 25-35 25-35 25-35 25-35 25-35 √ √ √ √ √ Power cut-off Detail: √ √ Accumulated up to now 13 (hours) (days) WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) II Work done in the week Work done up to the week: 01/08/2018 - 07/08/2018 FROM 01/08/2018 TO 07/08/2018 Baseline schedule No Work item Start date CSCEC TEMPORARY WORKS ROAD I ROAD II ROAD III WASHING BAY DRIVING PILES PILING ZONE PILING ZONE PILING ZONE PILING ZONE PILING ZONE GPS TEST PILES PILING ZONE PILING ZONE PILING ZONE PILING ZONE PILING ZONE GPS Finish date Actual Construction Completio n Start date Finish date Delay % Done WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) Cause of delay:  The weather was not good for workers to finish tasks Too much rain in a week  Quality of some workers didn’t match requirement Catch up schedule  To increase site engineers, manpower, machcineries, equipments and working extra hours to catch up project schedule  Contractor to prepare a good construction planning & improve construction management work & efficiency and improve method statements for some works  Pushing co-operation between site and office  Replacing workers who weren’t good enough on site III Safety report Problems and Solutions: - Lack of Protective Clothing happening again - Working on high scaff-folding without safety belt  Apply fines to these workers Safety activities on site: Photo 1- Weekly Safety Meeting WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) IV Site pictures Weekly report No.01 Weekly report No.01 Photo No.01 Photo No.02 Date Date DELIVERY STONE TO SITE DELIVERY STONE TO SITE Weekly report No.01 Weekly report No.01 Photo No.03 Photo No.04 Date Date DELIVERY STONE TO SITE DELIVERY STONE TO SITE WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) Weekly report No.01 Weekly report No.01 Photo No.05 Photo No.06 Date Date DELIVERY LOAD TO SITE DELIVERY LOAD TO SITE Weekly report No.01 Weekly report No.01 Photo No.07 Photo No.08 Date Date DELIVERY LOAD TO SITE DELIVERY LOAD TO SITE WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) Weekly report No.01 Weekly report No.01 Photo No.09 Photo No.10 Date Date EXCAVATION AND COMPACTED SOIL EXCAVATION AND COMPACTED SOIL Weekly report No.01 Weekly report No.01 Photo No.11 Photo No.12 Date Date EXCAVATION AND COMPACTED SOIL EXCAVATION AND COMPACTED SOIL WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) Weekly report No.01 Weekly report No.01 Photo No.13 Photo No.14 Date Date MOVE THE ROBOT TO THE CONSTRUCTION SITE MOVE THE ROBOT TO THE CONSTRUCTION SITE Weekly report No.01 Weekly report No.01 Photo No.15 Photo No.16 Date Date MOVE THE ROBOT TO THE CONSTRUCTION SITE MOVE THE ROBOT TO THE CONSTRUCTION SITE WEEKLY REPORT No.01 (From 01 Aug to 07 Aug, 2018) ... Weekly report No. 01 Weekly report No. 01 Photo No. 03 Photo No. 04 Date Date DELIVERY STONE TO SITE DELIVERY STONE TO SITE WEEKLY REPORT No. 01 (From 01 Aug to 07 Aug, 2018 ) Weekly report No. 01 Weekly. .. activities on site: Photo 1- Weekly Safety Meeting WEEKLY REPORT No. 01 (From 01 Aug to 07 Aug, 2018 ) IV Site pictures Weekly report No. 01 Weekly report No. 01 Photo No. 01 Photo No. 02 Date Date DELIVERY... SITE WEEKLY REPORT No. 01 (From 01 Aug to 07 Aug, 2018 ) Weekly report No. 01 Weekly report No. 01 Photo No. 09 Photo No. 10 Date Date EXCAVATION AND COMPACTED SOIL EXCAVATION AND COMPACTED SOIL Weekly

Ngày đăng: 08/03/2023, 21:10

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w