1. Trang chủ
  2. » Kinh Tế - Quản Lý

Contract Announcements December 19, 2012 through January 10, 2008 doc

27 678 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 27
Dung lượng 332,38 KB

Nội dung

Contract Announcements December 19, 2012 through January 10, 2008 Foster Wheeler AG (Nasdaq: FWLT) is a leading engineering and construction company and power equipment supplier. 2 Note: EPC/CM = Engineering, Procurement, Construction/Construction Management FEED = Front-End Engineering Design PMC = Project Management Consultancy E&C = Global Engineering & Construction Group Power = Global Power Group N/S = Not stated LNG = Liquefied Natural Gas CFB = Circulating Fluidized-Bed BFB = Bubbling Fluidized-Bed PC = Pulverized Coal ITB = Invitation to Bid Please be advised that the information in these news releases was accurate as of the date the release was issued (the dateline) but does not reflect any later changes or developments. There is no duty on the part of Foster Wheeler to update the information. Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 2012 12-19-12 4Q2012 E&C PMC 2Q2018 Refining MINA AL-AHMADI & MINA ABDULLAH, KUWAIT: The Global Engineering and Construction Group has been awarded a project management consultancy (PMC) services contract by Kuwait National Petroleum Company (KNPC) for its Clean Fuels Project. KNPC’S Clean Fuels Project is a major upgrade and expansion of the Mina Al-Ahmadi and Mina Abdullah Refineries to increase the combined throughput by 264,000 barrels per stream day to 800,000 barrels per stream day. 12-12-12 Bookings will be made as work is released. E&C FEED Oil & Gas NORWAY: A subsidiary of the Global Engineering and Construction Group has signed a three-year frame agreement with Statoil Petroleum AS for the provision of front-end engineering design (FEED) services for future projects at the Karsto and Kollsnes processing plants located north of Stavanger and north-west of Bergen. 11-26-12 3Q2012 E&C EPCM 2015 Chemicals CHANGZHOU, JIANGSU PROVINCE, PEOPLES REPUBLIC OF CHINA: A subsidiary of the Global Engineering and Construction Group has been awarded an engineering, procurement and construction management contract by LANXESS Changzhou Co., Ltd. for a new ethylene propylene diene monomer (EPDM) rubber plant. The new facility will be designed to produce 160,000 tonnes per annum EPDM rubber. 11-15-12 4Q2012 E&C FEED Oil & Gas ALBERTA, CANADA: A subsidiary of the Global Engineering and Construction Group (Foster Wheeler Canada Ltd.) and Three Streams Engineering Ltd. have been awarded the front-end engineering design (FEED) for the proposed Cenovus Energy Inc. Telephone Lake SAGD (steam- assisted gravity drainage) central processing facility phase A development. The project is expected to have an initial production capacity of 90,000 barrels per day (bbls/d) over two phases and an estimated project life of up to 40 years. 11-8-12 E&C Engineering and procurement services Chemicals INDIA: The E&C Group has been awarded a contract by Reliance Industries Limited for the provision of engineering and procurement services for its Paraxylene Project at the Jamnagar, Gujarat State, on the west coast of India. This project is part of Reliance’s multi-billion-dollar expansion project at its 3 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description world-scale Jamnagar refining and petrochemical complex. 11-7-12 3Q2012 Power Design 2015 for first unit 2016 for second unit Power SOUTH KOREA: The Global Power Group has been awarded a contract by BHI Co., Ltd. for design collaboration on two supercritical pulverized coal (PC) fired steam generators for the Buk-Pyeong Power Plant project for STX Electric Power Co., Ltd. BHI, which is Foster Wheeler’s licensee for utility PC technology in the region, will supply two 595 MWe (gross megawatt electric) supercritical PC steam generators and other major equipment for the project, which is located in the province of Gangwon-do, South Korea. 11-6-12 3Q2012 E&C Consulting services 2Q2013 Oil & Gas CHINA: The E&C Group has been awarded a contract by The World Bank Group to provide consulting services in the field of carbon capture and transportation in China. The World Bank has launched an analytical and advisory assistance program in China in order to build the country’s understanding of, and capacity for, application of carbon capture and storage (CCS). The main objective for Foster Wheeler under its contract is to strengthen the CCS and transportation know-how of the China Power Investment Corporation (CPI), one of the largest power producers in China, and of relevant government institutions. 10-15-12 3Q2012 E&C Engineering and procurement 2Q2014 Chemicals JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA: Subsidiaries of its Global Engineering and Construction Group have been awarded an engineering and procurement contract by Sardara Chemical Company (Sadara) for a packaging center at Jubail Industrial City in the Eastern province of the Kingdom of Saudi Arabia. The packaging center will be part of a world-scale, fully integrated chemicals complex that is being built by Sadara, a joint venture between Saudi Arabian Oil Company (Saudi Aramco) and the Dow Chemical Company (Dow). 10-12-12 3Q2012 E&C EPCm 2014 Chemicals JURONG ISLAND, SINGAPORE: A subsidiary of its Global Engineering and Construction Group has been awarded an engineering, procurement and construction management contract by LANXESS Butyl Pte. Ltd. for a new neodymium polybutadiene (ND-PBR) rubber plant. This award follows Foster Wheeler’s successful completion of the front-end engineering design for this project earlier in 2012. The new facility, which LANXESS states is expected to be the largest of its kind in the world, will be designed to produce 140,000 tonnes per annum of Nd-PBR and will include process and finishing buildings, a central control room, a substation and a tank farm. 10-1-12 3Q2012 Power Design 1Q2015 Power YEOSU, KOREA: A subsidiary of the Global Power Group has been awarded a contract by Doosan Heavy Industries & Construction Co., Ltd. for cooperation in the design of a circulating fluidized-bed (CFB) steam generator for the Yeosu Thermal Power Plant 1 Project for Korea South East Power Co., Ltd. (KOSEP). Foster Wheeler will provide the design review of the 350 MWe (gross megawatt electric) CFB steam generator for Doosan Heavy Industries & Construction Co. Ltd., Foster Wheeler’s licensee for Utility CFB technology in the region. 9-24-12 2Q2012 GPG Design and Supply Mid-2013 Power VERACRUZ, NEW MEXICO: A subsidiary of its Global Power Group has been awarded a contract by SCS Proyectos, S.A.P.I. de C.V. for the design and supply of two heat recovery steam generators (HRSGs) to be installed in a cogeneration power plant for TEREFTALATOS MEXICANOS S.A. TOP 1002 Cogeneration Project in Cosoleacaque. Foster Wheeler will design, supply and provide advisory 4 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description services for erection and start-up of the two HRSG’S, which will be coupled to two LM 6000PF combustion turbines. 9-20-12 Bookings will be made as work is released. E&C EPCm CANADA: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Karnalyte Resources Inc. for the Wynyard Carnallite Project. The project involves the construction of a facility which is expected to produce 625,000 tonnes of potash per year. As part of this project, Foster Wheeler will coordinate with ERCOSPLAN Ingenieurgesellschaft Geotechnik und Bergbau mbH (“ERCOSPLAN”) of Erfurt Germany which will provide engineering, cavern development, mine plan, and commissioning for the solution mining of the project (under direct contract to the client). 9-20-12 2Q2012 E&C Detailed engineering design Refining BARINAS, VENEZUELA: A subsidiary of the Global Engineering and Construction Group, in consortium with Hyundai Engineering and Construction Co., Ltd. (HDEC), of South Korea has been awarded a contract by Petroleos de Venezuela, S.A. (PDVSA) for Phase I (Hydroskimming section) of the new Batalla Santa Ines Refinery. Foster Wheeler’s scope of work includes early detailed engineering design and delivery of an open book estimate for the crude distillation unit, storage and blending unit and fuel distribution plant. 9-11-12 2Q2012 E&C Engineering, procurement assistance and construction management 2014 Refining VLISSINGEN, THE NETHERLANDS: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Zeeland Refinery, N.V., a joint venture between Total and LUKOIL, for engineering, procurement assistance and construction management assistance for the upgrade of the distillate hydrocracker at the Zeeland Refinery. The objective of the project is to maximize the throughput of the distillate hydrocracker by debottlenecking the unit’s reaction and fractionation sections of the distillate hydrocracker. 9-6-12 2Q2012 E&C Engineering and material supply 4Q2013 Refining BASHKORTOSTAN, RUSSIA:A subsidiary of the Global Engineering and Construction Group has been awarded a contract by JSC Gazprom Neftekhim Salavat, for the engineering and material supply of a new double-cell Terrace Wall TM steam reformer heater and air preheating system to be built at the Salavat Refinery. 9-5-12 3Q2012 E&C BEP Chemicals RAS LAFFAN, QATAR: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Shell Global Solutions B.V. to develop a basic engineering package (BEP) for a world-scale mono-ethylene glycol (MEG) facility. The MEG facility will be part of a new petrochemicals complex in Ras Laffan Industrial City, being developed by a joint venture of Qatar Petroleum and Shell. 9-4-12 3Q2012 Power Design and Supply 1Q2015 Power YEOSU CITY, SOUTH KOREA: A subsidiary of the Global Power Group has been awarded a contract by Yeosu Cogeneration Corporation, a subsidiary of Hanwha Corporation, for the design and supply of one circulating fluidized-bed (CFB) steam generator located in an industrial complex in Yeosu City, South Korea. Foster Wheeler will design and supply the 60 MWe (gross megawatt electric) CFB steam generator plus auxiliary equipment and provide site advisory services for the project. 5 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 8-29-12 Bookings will be made as work is released. E&C Consultancy Oil & Gas EGYPT: A subsidiary of the Global Engineering and Construction Group has signed a three-year framework agreement with Apache Khalda Corporation for the provision of consultancy services. Apache Kahlda, a subsidiary of Apache Corporation, is one of the leading liquid hydrocarbons and natural gas producers in Egypt. 8-28-12 3Q2012 E&C FEED Q1 2013 Oil & Gas STAINFORTH, YORKSHIRE, UK: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Samsung C&T ECUK Ltd (Samsung), a wholly-owned subsidiary of Samsung C&T Korea, to participate in a comprehensive update of the front-end engineering design (FEED) developed previously by a third party for 2Co Energy Limited’s (2Co) Don Valley Power Project. Foster Wheeler will undertake the majority of the process engineering, process integration and FEED update work for inside the battery limits and will manage the process licensors’ technical scope for the gasification and acid removal units. 8-23-12 3Q2012 E&C FEED, BED, EPC End 2013 Oil & Gas LINHARES, ESPIRITO SANTO STATE, BRAZIL: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Petroleo Brasileiro S.A. (Petrobras) for a world- scale grassroots gas-to-chemicals complex. Foster Wheeler will provide basic engineering (BED), front-end engineering design (FEED), and technical assistance and training during the engineering, procurement and construction (EPC) phase through to successful completion of the plant performances. 8-1-12 2Q2012 E&C Engineering, Design & Supply 3Q2013 Oil & Gas MAP TA PHUT, THAILAND: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Samsung Engineering Co. Ltd. for a waste heat recovery unit for PTT Public Company Limited’s Power Generation and Heavy Recovery Project. Foster Wheeler will design, engineer and supply the waste heat recovery unit, including selective catalytic reduction system and other associated equipment. 7-19-12 3Q2012 E&C EPCm 2016 Refining VENEZUELA: A subsidiary of the Global Engineering and Construction Group has signed a contract with PDVSA Petroleo S.A. for the engineering, procurement services and construction management (EPCm) for the El Palito Refinery Expansion Project. Foster Wheeler will execute the project in consortium with Toyo Engineering Corporation from Japan and Y & V Ingenenieria y Construccion. The expansion is intended to double the refinery’s capacity to 280,000 BPSD, processing heavy and extra-heavy crudes from the Orinoco Belt, and increasing production of clean fuels. 7-16-12 2Q2012 E&C EPCm 1Q2013 Pharma TEESSIDE, UNITED KINGDOM: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by EPAX Pharma UK Limited, the UK subsidiary of Trygg Pharma AS, based in Norway, for the provision of engineering, procurement and construction management (EPCm) services to convert part of the former Lundbeck pharmaceutical plant at Seal Sands, Teesside, UK, to process fish oil to produce an Omega-3 active pharmaceutical ingredient. 5-8-12 Bookings will be made as work orders are received E&C Engineering and project management services Refining and petro- chemical ASIA: A subsidiary of the Global Engineering and Construction Group has signed an Asian Enterprise Framework Agreement (EFA) with Shell Global Solutions International B.V. (“Shell”). Foster Wheeler will provide engineering and project management services for Shell’s downstream projects in Asia. The agreement is for a five-year period, with an option to extend for another five years. 6 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 4-30-12 1Q2012 E&C PMC Chemicals EMIRATE OF ABU DHABI: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by Abu Dhabi National Chemicals Company (ChemaWEyaat) for the provision of a project management consultancy (PMC) services for an aromatics complex (Stage 1 of the Tacaamol Project) and the supporting infrastructure. The aromatics complex is planned to convert almost three millio n tons per year of heavy and medium naphtha, supplied via pipeline from the Takreer Ruwais Refinery, into paraxylene, mixed xylenes and benzene. Foster Wheeler will, for the aromatics complex and infrastructure, provide PMC service for the front-end design (FEED) phase. The contract also includes an option for Foster Wheeler to provide PMC services for the engineering, procurement and construction phase. 4-27-12 4Q2011 E&C Owner’s engineer Oil & Gas HACKBERRY, LOUISIANA: A subsidiary of the Global Engineering and Construction Group has been awarded an owner’s engineer contract for a new LNG liquefaction project by Cameron LNG LLC, an affiliate of Sempra Energy, planned to export up to 12 million tons per annum of LNG. Foster Wheeler’s scope of work includes technical assistance for project development, the execution of front- end engineering to support permit applications to the U.S. Federal Energy Regulatory Commission, development of technical specifications and invitation to bid packages for engineering, procurement and construction activities, and technical reviews. 4-3-12 1Q2012 (EP scope) E&C EPCm July 2013 Refining ANTWERP, BELGIUM: A subsidiary of the Global Engineering and Construction Group has been awarded an engineering, procurement and construction management (EPCm) services contract by TOTAL Raffinage-Chimie for the revamp of a hydrodesulfurization unit at TOTAL’s refinery. The revamp of the hydrodesulfurization unit should enable the refinery to produce jet fuel with sulfur content below 30 parts per million (ppm), and diesel with a sulfur content below 10 ppm, in accordance with European Union requirements. 4-2-12 Bookings will be made as work orders are received E&C Project management, consulting, engineering, procurement, construction management, and construction services Chemicals DOW CHEMICAL COMPANY: The Global Engineering and Construction Group has signed a Strategic Umbrella Agreement with the Dow Chemical Company. The agreement has an initial term of three years and provides s upport by Foster Wheeler to selected Dow global capital projects, which form part of its growth strategy across its diversified portfolio of businesses: specialty chemicals, advanced materials, agrosciences and plastics. 3-27-12 1Q2012 E&C PMC 2014 Refining JAVA, INDONESIA: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by PT Pertamina (Persero) (“Pertamina”), the national oil company of the Republic of Indonesia, to provide project management consultancy services for the Residue Fluid Catalytic Cracker Project at the Cilacap Refinery. Foster Wheeler will manage the engineering, procurement and construction contractor on behalf of Pertamina. 3-12-12 1Q2012 E&C Basic engineering design, FEED Sept. 2012 Oil & Gas SAN PEDRO DE MARCORIS, DOMINICAN REPUBLIC: A subsidiary of the Global Engineering and Construction Group has been awarded the basic design and front-end engineering design contract by Complejo GNL del Este, a Consortium formed by Dominican and Colombian companies that participate in the energy sector of these countries, for a new LNG receiving terminal and jetty. Foster Wheeler previously completed a feasibility study for the selection of the most suitable technology for the new terminal, which will be designed for a send-out capacity of 240 million standard cubic feet per day, with an LNG storage tank of 160,000 cubic meters. 7 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 3-8-12 4Q2011 E&C Engineering and material supply 4Q2012 Refining TYUMEN, TYUMEN REGION, RUSSIA: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by CJSC Antipinsky Refinery for the engineering and material supply of a new fired heater and air preheating system for the Antipinsky Refinery. The fired heater will be part of a new crude distillation unit being built as part of the modernization of the Antipinsky refinery. 2-28-12 4Q2011 E&C Supply 1Q2013 Refining NIZHNY, NOVGOROD, RUSSIA: A subsidiary of the Global Engineering and Construction Group has been awarded a contract by a subsidiary of JSC LUKOIL for the supply of a waste heat boiler. The waste heat boiler will be installed downstream of a fluid catalytic cracking unit, enabling the production of gasoline that is intended to meet European Union Euro-5 standards. A similar unit has been in operation since 2010 to Lukoil’s full satisfaction. 2-21-12 4Q2011 E&C Conceptual & basic design May 2012 Pharma JEDDAH, KINGDOM OF SAUDI ARABIA: A subsidiary of the Global Engineering and Construction Group has been awarded a conceptual and basic design contract by SAJA Pharmaceuticals for the expansion of a manufacturing facility. Foster Wheeler will provide conceptual and basic design services for a new research and development building, which will be designed to manufacture small production lots for launching new products on the market, a new oral solid dosing manufacturing and packing facility, a warehouse, quality control laboratories and an administrative building. 2-14-12 1Q2012 Power Design, supply 2Q2014 Power SWEDEN: A subsidiary of the Global Power Group awarded a contract by Lunds Energi, a municipality-owned energy supplier in the Southern region of Sweden, for the design, supply and erection of a 35 MWe (gross megawatt electric) biomass-fired circulating fluidized-bed (CFB) boiler island. Foster Wheeler will design and supply the steam generator and auxiliary equipment, and will carry out the erection and commissioning of the boiler island. The steam generator will be designed to burn 100% bio fuel with up to 50% demolition wood. Lunds Energi is building the new combined heat and power plant to replace existing old equipment operating on fossil fuels. 2-13-12 4Q2011 E&C EPCm 2015 Chemicals JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA: Subsidiaries of the Global Engineering and Construction Group have been awarded an engineering, procurement and construction management contract by ARAMCO Overseas Company B.V. (AOC), a subsidiary of Saudi Aramco, and by Dow Europe Holding B.V. (Dow) for propylene oxide (PO) unit. The unit will be a part of a world-wide scale, fully integrated chemicals complex, one of the largest of its kind in the world, which will be constructed, owned and operated by Sadara Chemical Company (Sadara), a joint venture between Saudi Aramco and Dow. This contract was awarded as an extension to the front-end engineering design (FEED) contract awarded to Foster Wheeler by AOC and Dow in 2008. 2-9-12 4Q2011 E&C Design, engineering and technical services Oil & Gas SOUTH TIMBALIER 283, GULF OF MEXICO: Foster Wheeler Upstream, part of its Global Engineering and Construction group, has been awarded a contract by Discovery Gas Transmission, LLC to provide design, engineering and technical services for a junction platform, facilities and associated pipelines with the Discovery System at South Timabalier 283. The platform located in approximately 350 feet of water, will be a four-pile structure with a two-level deck. It will be designed as an unmanned structure with a control system design to shut down the facility in the event of an upset condition. 1-31-12 4Q2011 E&C Feasibility Study Mid-2012 Refining BALLSH & FIER, ALBANIA: A subsidiary of the Global Engineering & Construction Group has been awarded a feasibility study by Albanian Refining & Marketing of Oil sh.a. (ARMO) relating to the modernization of two refineries. ARMO intends to modernize the existing refineries to restore production to the original design capacity and produce transportation fuels in line with European Union regulations. 8 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 1-31-12 4Q2011 E&C PMC 2013 Oil & Gas STAINFORTH, YORKSHIRE, UNITED KINGDOM: A subsidiary of the Global Engineering & Construction Group has been awarded a project management consultancy contract by 2Co Power (Yorkshire) Limited (2Co) for the Don Valley Power Project. The project is part of a carbon capture, utilization and storage scheme (CCS) being developed by 2Co, comprising a 900 MW installed capacity (650 MW net export capacity) integrated coal gasification combined cycle (IGCC) power plant, CO 2 transportation, and storage combined with enhanced oil recovery (EOR). The plant will be designed to capture, as CO 2 , some 90 percent of the carbon in the fossil fuel. 1-19-12 4Q2011 E&C Basic design, FEED Oil & Gas TAMIL, NADU, INDIA: A subsidiary of its India subsidiary, Foster Wheeler India Private Limited, part of its Global Engineering and Construction Group, has been awarded a contract for a new LNG receiving terminal. The contract was awarded by India’s national oil company, Indian Oil Corporation Limited (IOCL). 1-18-12 1Q2012 Power Design & Supply 4Q2013 Power YANGZHOU JIANGSU PROVINCE, CHINA: A subsidiary of the Global Power Group has been awarded a contract by Yuen Foong Fu Paper Mfg. (Yangzhou) Co., Ltd. for the design and supply of one circulating fludized-bed (CFB) steam generator for captive use at its industrial paper complex. Foster Wheeler will design and supply the 50 MWe (gross megawatt electric) CFB steam generator plus auxiliary equipment and provide site advisory services for the project. 1-17-12 2Q2011 E&C Engineering & procurement services Refining BATAAN, PHILIPPINES: A subsidiary of the Engineering & Construction Group has been awarded a contract by Petron Corporation for the Petron Refinery Master Plant-2 Project. Foster Wheeler will execute detailed engineering and procurement services for the delayed coker unit (DCU), including the engineering and material supply of two double-fired Terrace Wall TM coker heaters. The DCU will have a design capacity of 37,500 barrels per stream day and is a key part of this significant refinery upgrade. 1-5-12 4Q2011 Power Design & Supply Mid-2013 Power BUDAPEST, HUNGARY: A subsidiary of the Global Power Group has been given a limited notice to proceed (LNTP) by GS Engineering and Construction for the design and supply of two heat recovery steam generators (HRSGs) to Técnicas Reunidas, S.A. (TRSA). The HRSGs will be installed in a combined cycle power plant that TRSA will build near Budapest, Hungary. Foster Wheeler will design, supply and provide advisory services for erection and start-up of two HRSGs, which will be coupled to two Siemens combustion turbines model SGT5-4000F, with a total installed capacity of 860 MWe (gross megawatt electric). 1-3-12 4Q2011 Power Design & Supply 2Q2015 Power MONG DUONG, VIETNAM: A subsidiary of the Global Power Group has been awarded a contract by Hyundai Engineering and Construction for the design and supply of 4 x 250 MWe (net megawatt electric) circulating fluidized-bed (CFB) steam generators for the Mong Duong 1 Thermal Power Plant for Vietnam Electricity (EVN), the owner and developer of the project. The CFB steam generators will be designed to burn Vietnamese anthracite coal while meeting applicable environmental regulatory requirements. 1-3-12 4Q2011 Power Design & Supply 4Q2014 Power DAEGU METROPOLITAN CITY, SOUTH KOREA: A subsidiary of the Global Power Group has been given a limited notice to proceed (LNTP) by GS Engineering and Construction for the design of a circulating fluidized-bed steam generator for the Green Energy Centre BTO (Build, Transfer, Operate) Project of Daegu Metropolitan City, South Korea, the owner and developer of the project. The CFB steam generator will be designed to burn 380/tons day of refuse derived fuel (RDF) while meeting applicable environmental regulatory requirements. 2011 9 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 12-21-11 4Q2011 E&C EPCm 2013 Oil & Gas SCOTLAND: A subsidiary of Foster Wheeler’s Global Engineering and Construction Group has been awarded an engineering, procurement and construction management contract by BP Exploration Operating Company Limited for BP Exploration’s Enhanced Gas Separation Project (EGSP). The project, for which Foster Wheeler has already successfully completed the pre-front-end design (pre- FEED) and FEED, relates to the debottlenecking of the Forties Pipeline Systems crude degasification facilities at BP Exploration’s Kinneil terminal to allow it to handle high gas-to-oil ratio unstabilized crude oils and natural gas liquids. (NGLs). The debottlenecking will involve modifications to the existing plant, including improvements to heater and process control systems, as well as new facilities, including crude coolers and a cooling water system. 11-23-11 3Q2011 E&C Project management 3Q2012 Oil & Gas OPAL HUB, WYOMING: Foster Wheeler U pstream, part of its Global Engineering and Construction Group, has been awarded a contract by Ryckman Creek Resources, LLC, a subsidiary of Peregrine Midstream Partners, LLC, for project management support for the 35 billion-cubic-foot Ryckman Creek natural gas capacity storage facility. The new gas storage unit will serve the natural gas markets at the Opal Hub in Wyoming. 11-15-11 Bookings will be made as work orders are received E&C EPCm, pre-FEED, FEED Oil & Gas RAS LAFFAN INDUSTRIAL CITY, QATAR: A subsidiary of Foster Wheeler’s Global Engineering & Construction Group and the subsidiary’s joint venture partner, Qatar Kentz WLL, have signed an engineering, procurement and construction framework agreement with Qatargas Operating Company Limited. The framework agreement covers projects associated with the existing Qatargas LNG facility at Ras Laffan Industrial City and will include both onshore and offshore work. 11-1-11 2Q2011 Power 20-Year License Agreement Power INDIA: A subsidiary of Foster Wheeler AG has entered into a 20-year agreement with Essar Projects India Ltd. (EPIL), a subsidiary of Essar Group, to provide a technology license for utility sized circulating fluidized-bed (CFB) steam generators to be sold in India. 10-26-11 E&C Memorandum of Understanding Mining & Metals CHILE: A subsidiary of Foster Wheeler’s Chilean Global Engineering & Construction Group has signed a memorandum of understanding with a unit of GE Energy to explore the pursuit of selected mining and metals projects in South America. Together, GE and Foster Wheeler Chile S.A. would be able to offer innovative solutions to the mining sector, combining equipment and technology from GE Energy, together with technical expertise in mining and metals and the projection execution capability of Foster Wheeler Chile S.A. 10-26-11 3Q2011 E&C EPCm 3Q2012 Other SASOLBURG, SOUTH AFRICA: Foster Wheeler has received an engineering, procurement and construction management (EPCm) services contract from Sasol New Energy Holdings (Proprietary) Limited for the outside battery limit (OBL) portion of a new gas-fired power generation plant. Sasol stated that this project is expected to raise its electricity self-sufficiency to 840 megawatt electric (MWe) or 60% of its overall power draw. Foster Wheeler’s scope will include the earthworks for the entire outside battery limit site, an access road; utility connections; 15/88kV step-up transformers and an 88kV substation with associated electrical infrastructure and network system. 10-14-11 2Q2011 Power Design & Supply Power SALAYA, INDIA: Foster Wheeler has been awarded a contract by Essar Projects Limited, a United Arab Emirates (UAE) Company, for the design and supply of four circulating fluidized-bed (CFB) steam generators for the Essar Power Salaya Limited in India, which is the owner and developer of the project. Foster Wheeler will design and supply four 150 MWe CFB steam generators and provide site advisory and commissioning services for the project. 10 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served Description 10-4-11 3Q2011 E&C PMC 4Q2011 Oil & Gas CAIRO, EGYPT: Foster Wheeler has received a contract from Apache Khalda Corporation for the provision of project management consultancy services to oversee the front-end engineering design (FEED) for the Qasr compression project. The Qasr Compression Project will provide additional compression to the existing facilities at the Qasr gas condensate field and Foster Wheeler will provide expertise and personnel to assist Apache Khalda in the management and administration of the FEED phase of this project. 9-15-11 2Q2011 E&C EPCm 2Q2012 Chemicals SASOLBURG, SOUTH AFRICA: Foster Wheeler has been awarded a contract by Sasol Chemical Industries Ltd to provide engineering, procurement and construction management services for the Sasolburg Utilities Expansion Project. The project involves the expansion of the utility systems at the Sasol complex at Sasolburg to support a program of expansion projects. This EPCm award follows Foster Wheeler’s successful completion of the front-end engineering design (FEED) phase for this project. 9-13-11 2Q2011 E&C Basic engineering design 2015 Refining SOHAR, OMAN: Foster Wheeler, through a collaborative agreement with Honeywell’s UOP, was recently awarded a contract by Oman Refineries and Petrochemical Co. (Orpic). UOP/Foster Wheeler will provide a basic engineering design package for a solvent deasphalting (SDA) unit. The unit is a major part of the Sohar Refinery Expansion Project which will significantly increase the refinery’s production of petroleum products such as LPG, naphtha, Jet A-1 fuel, gasoline, diesel and propylene. The SDA will be designed to process 2.5 million metric tonnes per annum of vacuum reside of Oman Export Blend crude to produce Deasphalted Oil (DAO) and asphalt for road bitumen production. 9-1-11 1Q2011 E&C Basic engineering design 3Q2011 Refining ATYRAU, KAZAKHSTAN: Foster Wheeler awarded a contract for the basic engineering design of a new hydrogen production unit, based on Foster Wheeler Terrace-Wall TM steam reforming technology. Atyrau Refinery is a member of the JS National Company “KazMunayGas” group that is the leading national oil and gas company of Kazakhstan. The main purpose of the project is to increase the oil conversion rate and production of all types of motor fuels to meet Euro IV and Euro V standards. 8-30-11 3Q2011 E&C Detailed design engineering Oil & Gas KARSTO, NORWAY: Foster Wheeler awarded a contract by Aibel AS for the provision of detailed design engineering services to support Aibel, which has been appointed by Statoil as the main engineering, procurement and construction contract for Karsto Development Project (KDP) 2013 for the Karsto and Kollsnes oil and gas processing plants in Norway. The scope of work includes detailed design engineering services for modification to the Karsto plant to enable it to process light oil from the Gudrun offshore oil field and condensate from the Sleipner field and also covers the upgrading of eight compressors, three at Karsto and five at Kollsnes. 8-24-11 1Q2011 Power Supply 2Q2012 Power CORDOBA & BADAJOZ, SPAIN: Foster Wheeler awarded contracts to supply solar steam generator systems to two separate solar projects. The first is with UTE Africa Solar, the EPC contractor for the La Africana Solar Thermal Power Plant located in Fuenta Palmera (Cordoba, Spain) to supply steam generating components (feedwater heaters, preheaters, evaporators, superheaters and reheaters) for a single 50 MWe train thermal plant. The second is with UTE Termosolar Olivenza (a joint venture created by Acciona and Seridom), the EPC contractor for the Olivenza Solar Thermal Power Plant, located in Olivenza (Badajoz, Spain) to supply a similar scope as that of the La Africana project. This 50 MWe plant consists of 2 x 25 MWe trains and also utilizes concentrated parabolic trough technology with thermal oil as the heat transfer fluid. [...]... its gas throughput, which is planned to reach 530 million standard cubic feet per day by 2020 4/8/08 4Q 2007 E&C EPCm Chemicals FELUY, BELGIUM: Contract awarded by INEOS Feluy SPRL for the engineering, procurement and 2009 25 Date Announced Quarter Booked Business Group Contract Type 4/1/08 1Q 2008 E&C Pre-feasibility study 3/31/08 1Q 2008 GPG Design and Supply 3/19/08 1Q 2008 E&C 3/14/08 1Q 2008 Projected... of 2008 5/28/08 1Q 2008 E&C Engineering and materials supply 5/6/08 2Q 2008 Power Design, supply and erect 5/6/08 1Q 2008 E&C Engineering and materials supply Oil & Gas THAILAND: Contract awarded by Samsung Engineering Co Ltd for design and supply of two gas turbine exhaust waste heat recovery units for PTT Public Co., Ltd.’s ethane separation plant at Map Ta Phut Industrial Complex 4/16/08 2Q 2008. .. expansion of LNG production, as well as energy optimization investigations Foster Wheeler’s involvement through this contract will continue through 2011 12 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry Served 3Q2011 Oil & Gas BAHRAIN: Foster Wheeler received a contract from Bahrain National Gas Company (BANAGAS) to undertake a feasibility study for the modifications... WESTERN AUSTRALIA: Contract awarded by Woodside for two gas turbine exhaust waste heat recovery units for the processing train at its Pluto liquefied natural gas (LNG) project Power VARKAUS, FINLAND: Contract awarded by NSE Biofuels Oy Ltd for a CFB biomass gasifier for a biomass-to-liquids (BTL) pilot plant 6/24/08 2Q 2008 E&C Services 6/23/08 2Q 2008 E&C Design and estimating services 2008 st (1 phase)... engineering, procurement and construction management contracts for a new chemicals facility near Map Ta Phut, Thailand Power PASCAGOULA, MISSISSIPPI: Contract awarded by Chevron Products Company for the design and supply of two 20 MW shop-assembled steam generators to be located at its Pascagoula refinery 2008 2011 22 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date Industry... management for a refinery upgrading project at one of the company’s refineries at Thessaloniki in northern Greece 24 6/27/08 Quarter Booked 1Q & 2Q 2008 Business Group Power Contract Type Projected Completion Date Design and supply 2008 Power SETUBAL, PORTUGAL: Contract awarded by MECI-Somague for the design and supply of two heat recovery steam generators (HRSGs) to be coupled with General Electric’s LM-2500... processing plant The first FEED call-off contract, awarded in the second quarter of 2 010, is for the Gudrun Onshore Modifications project, the objective of which is to enable the Karsto plant to process light oil/condensate production coming on stream in the Norwegian North Sea 7/14/10 2Q2010 E&C PMC 2012 Oil & Gas UNITED ARAB EMIRATES: Foster Wheeler awarded a contract by Abu Dhabi Company for Onshore... and supply 2011 Power TURKEY: METKA, S.A., EPC contractor for the project, awarded a contract for the design and supply of two axial deaerating surface condensers for the Samsun Power Plant in Turkey FW has previously supplied condensers to METKA for five separate projects 4/7/10 1Q10 Power Design, supply and erection 2012 Power POLAND: GDF SUEZ awarded a contract for the design, supply and erection... engineering design contract for Train 2 and Train 3 of the Pluto liquefied natural gas (LNG) project The contract also includes an option for early EPCm services 10/13/09 3Q09 E&C Process design 2011 Other SAUDI ARABIA: SETE Energy Saudia for Industrial Projects Ltd awarded a contract for the expansion of an industrial wastewater treatment plant 9/8/09 3Q09 Power Design, supply and erection 2012 Power KONIN,... RUSSIA: Project management consultancy contract awarded by OJSC “Khabarovsk Oil Processing Refinery” for a new hydroprocessing complex at its Khabarovsk refinery 2012 A separate contract was previously awarded for the design and supply of the coker fired heaters which are an integral part of the coker unit 2011 26 Date Announced Quarter Booked Business Group Contract Type Projected Completion Date . Contract Announcements December 19, 2012 through January 10, 2008 Foster Wheeler AG (Nasdaq:. involvement through this contract will continue through 2011. 13 Date Announced Quarter Booked Business Group Contract

Ngày đăng: 16/03/2014, 01:20

TỪ KHÓA LIÊN QUAN

w