1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Chapter V. Technical requirements Package No.19 Supply slag discharge pipes and fittings

6 3 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

Chapter V Technical requirements 1 General introduction of project and bidding package Supplying materials and equipment for major repair in 2019; Name of package Package No 19 Supply slag discharge. 1. General introduction of project and bidding package Supplying materials and equipment for major repair in 2019; Name of package: Package No.19 Supply slag discharge pipes and fittings; Place of delivery: At the warehouse of Hai Phong Thermal Power Plant Tam Hung commune, Thuy Nguyen district, Hai Phong city; Contract performance time: 90 days from the date the contract takes effect.

Chapter V Technical requirements General introduction of project and bidding package - Supplying materials and equipment for major repair in 2019; - Name of package: Package No.19 "Supply slag discharge pipes and fittings"; - Place of delivery: At the warehouse of Hai Phong Thermal Power Plant - Tam Hung commune, Thuy Nguyen district, Hai Phong city; - Contract performance time: 90 days from the date the contract takes effect Technical requirements 2.1 Requirement of specifications, standards and demonstrated documents a Specifications and standards: Name of goods and related Item Specifications and standards services Iron elbow 90 Ф 273 x 10 Iron elbow 90 Ф 273 x 10, steel C45 (equivalent or better) (Iron elbow has layers of paint, including 01 anti-rust coating layer and white coating outside layer.) Iron elbow 90 Ф 325 x 12mm; DN300; R = 1350mm, outer CT3 (equivalent or better), inner coated by anti-abrasion alloy Cerametal layer 4,5 mm thickness Iron elbow 90 Ф 325 x 12mm; Technical specifications of Cerametal alloy R = 1350mm, high anti- C: 4,0÷ 5,5%; Cr: 24,0÷ 30,0%; Mn: abrasion 0,5÷ 2,5%; Si: 0,5÷ 1,5%; Others: 1%; Hardness: 60- 62 HRc; (Iron elbow has layers of paint, including 01 anti-rust coating layer and white coating outside layer.) Iron elbow 120; Ф 325 x 12, DN300; outer layer is steel (equivalent or better), inner coated by anti-abrasion alloy Cerametal layer 4,5 mm thickness Technical specifications of Cerametal alloy Iron elbow đúc 120 ; Ф 325 x C: 4,0÷ 5,5%; Cr: 24,0÷ 30,0%; Mn: 12; anti-abrasion 0,5÷ 2,5%; Si: 0,5÷ 1,5%; Others: 1%; Hardness: 60- 62 HRc; (Iron elbow has layers of paint, including 01 anti-rust coating layer and white coating outside layer.) 75 Item Name of goods and related Specifications and standards services Hose clamp consists of two halves, Hose clamp DN300 and fittings connected by bolts and sealed with rubber gaskets (reference to drawing OTX-02) Cast steel pipe Ф 273 x 10, steel C45 (equivalent or better) Cast steel pipe Ф 273 x 10 Steel pipe has layers of paint, including 01 anti-rust coating layer and white coating outside layer - - Dimension DN300 (outer diameter φ325x12,5); - - The length of each section of pipe is 12 meters; - - The pipe sections are designed to be connected by hose clamp DN300 - - Outside steel pipes are cast steel pipes CT3 thickness of 8mm - Inner coated by anti-abrasion alloy Cast steel pipe Ф 325 x 12,5, Cerametal layer 4,5 mm thickness anti-abrasion Technical specifications of Cerametal alloy C: 4,0÷ 5,5%; Cr: 24,0÷ 30,0%; Mn: 0,5÷ 2,5%; Si: 0,5÷ 1,5%; Others: 1%; Hardness: 60- 62 HRc; (equivalent or better) - Steel pipe has layers of paint, including 01 anti-rust coating layer and white coating outside layer (reference to drawing OTX-01) Cast steel pipe Ф 426 x 15 Cast steel pipe Ф 426 x 15, steel C45 (equivalent or better) Steel pipe has layers of paint, including 01 anti-rust coating layer and white coating outside layer b Demonstrated documents E-BID is evaluated as qualified documents proving the code marks and specifications of the goods offered for sale when meeting the following requirements: - The Contractor must provide documents proving that the code marks and specifications of the goods meet or are equivalent or better than the requirements of EPROPOSAL in E-BID Documents are available in Vietnamese or English language Technical documents, technical data, slag discharge pipe specifications and fittings must be verified by the manufacturer 76 - The Contractor must have specific instructions in the document for each item of goods, marking the model on the specifications of the goods in the document (Documents without specific instructions will not be considered for evaluation.) - In case of offering the same or better goods, in addition to the documents for the offered goods, the Contractor must make a comparison table to prove the similarity or the better of the goods Comparative table to prove the equivalence or better of goods is considered as a document part of goods The proofs are presented in Vietnamese or English language If the Contractor fails to provide the proof of equivalence, it is deemed that the item does not meet E-PROPOSAL 2.2 Warranty, maintenance and commitments - Requirement of warranty and maintenance: Name of goods and related Item Requirement of warranty services Iron elbow 90 Ф 273 x 10 12 months from the date of handing over Product requirements are put into use within 12 months after being put into operation with an abrasion not exceeding 0.45 mm The Contractor must have a product warranty commitment required by E-PROPOSAL After 12 months from the date of putting the Iron elbow 90 Ф 325 x 12mm; slag discharge pipe into operation, the R = 1350mm, high anti- Investor and the Contractor shall together abrasion inspect and measure the remaining thickness of the slag discharge pipe, thereby determining the abrasion of the pipeline If the abrasion of the pipe exceeds 0.45mm, the Contractor is responsible for compensating the entire amount of slag discharged pipes as required by the contract Product requirements are put into use within 12 months after being put into operation with an abrasion not exceeding 0.45 mm The Contractor must have a product warranty commitment required by E-PROPOSAL After 12 months from the date of putting the slag discharge pipe into operation, the Iron elbow 120; Ф 325 x 12; Investor and the Contractor shall together anti-abrasion inspect and measure the remaining thickness of the slag discharge pipe, thereby determining the abrasion of the pipeline If the abrasion of the pipe exceeds 0.45mm, the Contractor is responsible for compensating the entire amount of slag discharged pipes as required by the contract 77 Item Name of goods and related Requirement of warranty services Hose clamp DN300 and fittings 12 months from the date of handing over Cast steel pipe Ф 273 x 10 Product requirements are put into use within 12 months after being put into operation with an abrasion not exceeding 0.45 mm The Contractor must have a product warranty commitment required by E-PROPOSAL After 12 months from the date of putting the slag discharge pipe into operation, the Cast steel pipe Ф 325 x 12,5, Investor and the Contractor shall together anti-abrasion inspect and measure the remaining thickness of the slag discharge pipe, thereby determining the abrasion of the pipeline If the abrasion of the pipe exceeds 0.45mm, the Contractor is responsible for compensating the entire amount of slag discharged pipes as required by the contract Cast steel pipe Ф 426 x 15 12 months from the date of handing over 12 months from the date of handing over - Commitments: Requesting the Contractor to commit: + Commit to supply 100% brand new and the goods are preserved according to the manufacturer's recommendations before handing over at Hai Phong Thermal Power Joint Stock Company + Commit the progress as stated in E-PROPOSAL + Commit to provide manual and storage instructions of the manufacturer on delivery Documents provided in Vietnamese or English language + Commit to product warranty under E-PROPOSAL + Commit to supply the original (or certified copy) of the quality certificate, the certificate of origin for the imported materials or the certificate of goods to ensure the manufacturer's quality standards (QC) for domestic supplies, specifically as follows: + No No Requirement of CO, CQ or QC Item Item Item Item Item Item CO,CQ or QC CO,CQ or customs declaration CO,CQ or customs declaration CO,CQ or QC CO,CQ or QC CO,CQ or customs declaration 78 Item CO,CQ or QC + The contractor must have a commitment to accept sampling and analysis when requested by the investor 2.3 Progress of supply and origin of goods - Progress: Meet the progress requirements mentioned in Part V, chapter 2, section Origin of goods: Request the Contractor to state the origin of goods in E-BID "Origin" means the country or territory where all goods are produced or where the final stage of basic processing is carried out for the goods in case that more than one country or territory participates in manufacturing process Other requirements - Product requirements must ensure consistency, technology compatibility and installation dimensions with the equipment system installed and operating at Hai Phong Thermal Power Joint Stock Company - Lists of goods in E-PROPOSAL are not available or have but not meet the technical specifications that require the Contractor to conduct field survey in the case of survey, the Contractor must send a written request to the bid solicitor, the bid solicitor shall send a written notice to bidders and organize a conference to exchange and provide relevant documents or send a guide to contractors to conduct field surveys about the contents of bidding dossier (the contractor and its stakeholders will be responsible for their own risks such as accidents, losses, damages) After the contractor and the investor conduct a field survey, the parties will set a minutes to determine the specifications of the goods; This minutes is an integral part of E-PROPOSAL and is the basis for the Investor to evaluate E-BID - Organizing goods quality inspection and acceptance: + Checking and accepting goods at the place of delivery + The Contractor must provide all technical documents of the goods that he provided to the Purchaser before organizing the acceptance + The buyer shall check the specifications, marks and codes of goods based on E-PROPOSAL technical standards for goods provided by the contractor The Contractor has all vehicles to transport the goods to the shipper’s warehouse Drawings: E-PROPOSAL accompany with a number of drawings for reference by the Contractor, suggesting the Contractor's actual survey to complete the necessary specifications before supplying / manufacturing List of drawings No of Name of drawing Remark drawing OTX-01 Detail of slag discharge pipe DN300 Item OTX-02 Detail of hose clamp and fittings Item Inspection and testing 79 The Investor has the right to inspect and test the goods provided to confirm that the goods have the technical characteristics in accordance with the requirements of EPROPOSAL If the test results meet the technical requirements, the bid solicitor shall cover all testing costs, otherwise if the test results fail to meet technical requirements, the contractor shall cover all the testing costs and expenses and other arising Any goods that have been tested inconsistent with the contractual specifications, the Investor has the right to refuse and the Contractor is responsible for replacing them with other goods or making necessary adjustments to properly meet technical requirements In case the Contractor is not able to replace or adjust the inappropriate goods, the Investor has the right to organize such replacement or adjustment if necessary, all risks and related costs due to the Contractor’s obligation 80 ... amount of slag discharged pipes as required by the contract 77 Item Name of goods and related Requirement of warranty services Hose clamp DN300 and fittings 12 months from the date of handing over... Documents are available in Vietnamese or English language Technical documents, technical data, slag discharge pipe specifications and fittings must be verified by the manufacturer 76 - The Contractor... 325 x 12mm; slag discharge pipe into operation, the R = 1350mm, high anti- Investor and the Contractor shall together abrasion inspect and measure the remaining thickness of the slag discharge

Ngày đăng: 20/10/2022, 19:59

w