1. Trang chủ
  2. » Luận Văn - Báo Cáo

THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT

15 4 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark Carried out by: Port Technology Construction Consulting and Commercial JSC(PTECH) I THE PURPOSE OF SURVEY In order to obtain the data for the Permanent and Temporary Benchmarks in coordinates and elevations for excecute construction, survey work is required PTECH is assigned to carry out the survey of IV order and Grade traverse control network at the project site from 19th November to 03rd December 2014 II BASIC FOR SURVEY - Contract dated 7nd March, 2014 between TOA CORPORATION and Port Technology Construction Consulting & Commercial JSC of “Thai Binh Thermal Power Plant and Transmission Lines Construction Project” - Working statement for Establishment of the Permanent and Temporary Benchmark prepared by PTECH approved III STANDARD FOR SURVEY - QCVN 04:2009/BTNMT - National technical regulation on establishment of Horizontal control network issued by Ministry of Natural Research and Environment in 2009 - QCVN 11: 2008/BTNMT - National technical regulation on eshtablisment of leveling network issued by Ministry of Natural Research and Environment in 2008 - TCVN 9401_2012 - The technical of measuring and processing GPS data in engineering survey - TCVN 9398: 2012 – Surveying in construction – General Requirements PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark IV ORIGINAL DATA USED FOR SURVEY - Horizontal control points: Third order horizontal control points in VN2000 coordinate system established by Vietnam National Land Administration Department are used for developing the IV order GPS horizontal control network - Vertical control points: Third order Benchmark is used for development of IV order vertical control network - The table below list the original control points used as based points to develop the IV order Hor/Vertical control network (Detail see in Appendix 1) Table 1: Table of Original Coordinate, Elevation control points VN2000 coordinate system, Central Meridian 105000’ , zone 60, National Land Survey Datum No Point Name Coordinate X, Y Elevation Remarks X(m) Y(m) III-130420 2266181.401 662538.435 III order coordinate point III-130419 2264175.368 659227.921 - ditto - III(TD-GL) 2.146 III oder Vertical Benchmark III(TD-GL) 1.789 III oder Vertical Benchmark H(m) V QUANTITY OF SURVEY No Description Unit Q,ty carried Remark out IV order horizontal control points Point 06 Connect to National horizontal points Point 02 IV order vertical control network Km 18.269 Point 16 Establishment of Grade traverse horizontal control network BM TBM PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark VI SURVEY EQUIPMENTS The survey work are used Equipment as following: 04 Trimble 4600LS receivers made in USA which can receive the signals from GPS (USA) systems were used to establish the IV order horizontal control network and the Grade traverse points (area outside the fence) The Accuracy in standard condition is as follows: ± (5mm + 0.5ppm x D) (Static and Fast Static Mode) (D is the distance from reference station to mobile station) GPS Trimble 4600LS receiver Total station Nikkon DTM551 made in Japan was used for measuring grade traverse control network (area inside the fence) and setting out The Accuracy in standard condition is as follows: • Angle measurement accuracy 1”; • Distance measurement accuracy 2mm + 2pmm; PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark Total station Nikon DTM 551 Leveling equipment Topcon AT-B4 and staffs was used for establishing the IV order vertical control network Leveling equipment Topcon AT-B4 Equipment and softwares for office data processing • Trimble Business Centre Software was used for baselines processing and adjustment of IV order horizontal control and grade traverse control network (area outside the fence) • Hhmaps Software was used for network adjustment (area inside the fence) • AENET Software was used for vertical network adjustment PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark • Microsoft office and assistance drawing software such as AutoCAD, softdesk was used for editing and making the report VII SURVEY METHODOLOGIES VII.1 Coordinate and Elevation system • Coordinate system: National coordinate system VN2000, with Central Meridian 105030’, zone 30 (Ko=0.9999) was used for whole project The detailed parameters of coordinate system are as follows: Spheroid : WGS 84 Semi major axis : 6378137m 1/ flattening : 298.257223563 Projection : UTM Central Meridian : 1050 30' E False Easting : 500 km False Northing : 0.000 Scale factor at C.M : 0.9999 • Elevation system: National Land Survey Datum VII.2 IV order horizontal control network Horizontal control points: Third order horizontal control two points named III-130420 and III-130419 in VN2000 coordinate system established by Vietnam National Land Administration Department were used for establishment the IV order GPS control network points Field survey PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark Horizontal control network was connected to at 02 National control points (III130420 and III-130419 ) IV order horizontal control network was carried out include 04 sessions Each session, the signal of satellites was recored for at least 120 minutes All survey information of each measured point such as weather condition, Antenna’s height, number of satellite were recorded into daily report… All data collected at each point were recorded into memory card or internal memory with 10 seconds interval separately by names for post-processing Network adjustment Trimble Business Centre software was used for baselines processing and network adjustment Adjustment module was used for control network adjustment In order to reduce an affect of scale factor and according to technical specification, the network was adjusted in VN-2000 coordinate system central meridian 105 30’, zone (Ko=0.9999) Weighting value of all GPS solution is calculated based on “alternative” method After calculating, received result of root means square of weighting unit error is 1.0 and tested result of χ2 with α=95% is PASS All adjustment results are shown in tables of appendix Coordinate in VN2000 grid coordinate system and WGS84 Geographic coordinate system of control points are shown in Appendix VII.3 Grade traverse horizontal control network Grade traverse horizontal control network was connected to IV order GPS control points By position specific of grade traverse control points, with 05 points outside the fence and 11 points inside the fence (see the attached enclosed in Appendix 3) Therefore, the grade traverse control points were establishment according to two methods: The points the inside the fence was established according to the method Total Station (measuring angles and distances), the points outside the fence was established according to the method measurements GPS PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark With 05 points outside the fence: Field survey: Based on 02 IV order GPS points (BM-01 and BM-06), Grade traverse control points was established by GPS receivers Grade traverse horizontal control network was carried out include 03 sessions Each session, the signal of satellites was recorded for at least 90 minutes All survey information of each measured point such as weather condition, Antenna’s height, number of satellite must be recorded into daily report… All data collected at each point was recorded into internal memory with 10 seconds interval separately by names for post-processing Network adjustment Trimble Business Centre software was used for baselines processing and network adjustment Adjustment module was used for control network adjustment In order to reduce an affect of scale factor and according to technical specification, the network was adjusted in VN-2000 coordinate system central meridian 105 030’, zone 30 (Ko=0.9999) Weighting value of all GPS solution is calculated based on “alternative” method After calculating, received result of root means square of weighting unit error is 1.0 and tested result of χ2 with α=95% is PASS All adjustment results are shown in tables of appendix 3.1 Coordinate in VN2000 grid coordinate system and WGS84 Geographic coordinate system of control points are shown in Appendix 3.1 Transformation coordinate PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark The network adjustment results of IV order horizontal control and grade traverse control points (for area outside the fence) are using coordinate system VN2000, Center Meridian 105030' , zone = 30 (UTM projection), at location of project deformed distance is 1/20.000 in this projection It's greater than 1/50.000 (according to TCVN 9398: 2012 Surveying construction-General requirements) therefore need to calculate coordinate transformation after network adjustment Table 2: Coordinate of IV order control and Grade traverse horizontal control points (for area outside the fence) at Coordinate system: VN 2000, central Meridian 105030’, k=0.9999 Coordinate No Point name Remarks N(m) E(m) BM-01 2266050.793 610435.282 IV order GPS point BM-02 2265595.842 610850.759 IV order GPS point BM-03 2265421.983 610731.407 IV order GPS point BM-04 2264746.537 609316.030 IV order GPS point BM-05 2265869.347 610566.422 IV order GPS point BM-06 2265753.352 610320.520 IV order GPS point TBM-17 2265996.417 610180.289 Grade traverse horizontal control point TBMO-01 2266112.908 610284.056 Grade traverse horizontal control point TBMO-03 2265803.876 610158.902 Grade traverse horizontal control point 10 TBMO-04 2265989.181 610054.279 Grade traverse horizontal control point 11 TBMO-05 2265740.280 610222.565 Grade traverse horizontal control point PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark Above coordinate is transformation to the meridian axis in accordance with the geographical location of the project land (central meridian 105 ° 41 '): Table 3: Coordinate of IV order control and Grade traverse horizontal control points (for area outside the fence) at Coordinate system: VN 2000, Central Meridian 105041’, k=0.9999 Coordinate No Point name Remarks N(m) E(m) BM-01 2265937.824 591309.106 IV order GPS point BM-02 2265482.430 591724.054 IV order GPS point BM-03 2265308.713 591604.513 IV order GPS point BM-04 2264634.884 590188.448 IV order GPS point BM-05 2265756.240 591440.037 IV order GPS point BM-06 2265640.526 591194.017 IV order GPS point TBM-17 2265883.736 591054.065 Grade traverse horizontal control point TBMO-01 2266000.105 591157.957 Grade traverse horizontal control point TBMO-03 2265691.228 591032.463 Grade traverse horizontal control point 10 TBMO-04 2265876.642 590928.053 Grade traverse horizontal control point 11 TBMO-05 2265627.564 591096.052 Grade traverse horizontal control point PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark Transfer of coordinate values from CM=105 041’, K=0.9999 to CM=105°30', K=1.000000 To calculate coordinate transformation, was used benchmark named: BM-01 as original point, azimuth side BM-01_BM-02 Result this calculate coordinate transformation is used for construction Table 4: Coordinate of IV order control and Grade traverse horizontal control points (for area outside the fence) at Coordinate system: VN 2000, Central Meridian 105030’, k=1.000000 Coordinate No Point name Remarks N(m) E(m) BM-01 2266050.793 610435.282 IV order GPS point BM-02 2265595.864 610850.739 IV order GPS point BM-03 2265422.013 610731.393 IV order GPS point BM-04 2264746.600 609316.083 IV order GPS point BM-05 2265869.356 610566.416 IV order GPS point BM-06 2265753.367 610320.526 IV order GPS point TBM-17 2265996.420 610180.302 TBMO-01 2266112.905 610284.064 TBMO-03 2265803.888 610158.915 10 TBMO-04 2265989.185 610054.298 11 TBMO-05 2265740.295 610222.576 Grade traverse horizontal control point Grade traverse horizontal control point Grade traverse horizontal control point Grade traverse horizontal control point Grade traverse horizontal control point With 11 points inside the fence: Field survey Based on 05 IV order GPS points (BM-01, BM-02, BM-03, BM-05 and BM-06), Eleven (11) grade traverse points were established by Total station Nikon DTM551 10 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark The accuracy of measurement was within following limits: o The Traverse angles were measured in times with Root Mean Square (RMS) Error of better than 3.1” o The Traverse lines were measured in times with Relative RMS error of better than 1:28.600 Network adjustment Hhmaps software was used for processing and network adjustment This grade traverse control network is used coordinate of 05 IV order GPS points (BM-01, BM-02, BM-03, BM-05 and BM-06) in Table.4 of Item VII.3 (after transformation) for calculate adjustment Result of grade traverse horizontal control network (area insde the fence) is shown in appendix 3.2 VII.4 IV order vertical control network Vertical control points: Third order National Benchmarks established by Vietnam National Land Administration Department were used for Establishment of IV order vertical control network Field survey: In accordance with standard of V.N.L.A.D the IV order vertical control network was established by using closed geometry levelling method The benchmarks location were chosen same as location of IV order horizontal control points and Grade traverse control points National benchmarks were used as basic control points The IV order levelling route run though all IV order control points and Grade traverse control points based on National benchmarks (III(TD-GL)7 and III(TD-GL)6 with miscloser 9.0mm, less than the allowable miscloser of =±85.48mm (where L is the length of levelling route in kilometre = 18.269km) Network adjustment: 11 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark The AENET software provided by Geodetic Department of Mining and Geology University was used for adjustment of IV order vertical control network (Results are shown in appendix 4) VIII RESULTS: Table 5: Coordinate and elevation of IV order and Grade traverse control points at Coordinate system: VN2000, central Meridian 105030’, k=1.000000 Coordinate No Point name Elevation Remarks N(m) E(m) H (m) BM-01 2266050.793 610435.282 4.290 IV order GPS point BM-02 2265595.864 610850.739 4.322 IV order GPS point BM-03 2265422.013 610731.393 4.272 IV order GPS point BM-04 2264746.600 609316.083 4.296 IV order GPS point BM-05 2265869.356 610566.416 4.275 IV order GPS point BM-06 2265753.367 610320.526 4.292 IV order GPS point TBM-01 2265876.768 610335.730 4.280 TBM-03 2265865.385 610470.094 4.464 TBM-04 2265805.988 610406.452 4.040 10 TBM-05 2265953.053 610482.692 4.131 11 TBM-06 2265742.562 610439.560 4.656 12 TBM-08 2265790.863 610532.676 4.800 13 TBM-09 2265708.584 610523.148 4.869 14 TBM-10 2265803.111 610617.710 4.930 15 TBM-12A 2265697.446 610661.641 5.171 16 TBM-14 2265453.961 610536.119 4.674 17 TBM-15 2265609.501 610431.234 4.646 18 TBM-17 2265996.420 610180.302 4.916 Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point 12 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark 19 TBMO-01 2266112.905 610284.064 4.669 20 TBMO-03 2265803.888 610158.915 4.725 21 TBMO-04 2265989.185 610054.298 4.667 22 TBMO-05 2265740.295 610222.576 4.676 23 O 2264905.894 610568.993 Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point Grade traverse horizontal , IV order vertical point This is point the same Plant Coordinate X(East)=0.000, Y (North)=0.000, Table 6: Coordinate and elevation of IV order and Grade traverse control points at Coordinate system: Plant Coordinate No Point name Elevation Remarks X-East(m) Y-North(m) H (m) BM-01 715.018 904.114 4.290 IV order GPS point BM-02 687.107 288.658 4.322 IV order GPS point BM-03 479.785 250.117 4.272 IV order GPS point BM-04 -998.580 773.304 4.296 IV order GPS point BM-05 679.448 683.093 4.275 IV order GPS point BM-06 423.561 774.947 4.292 IV order GPS point TBM-01 521.570 851.453 4.280 TBM-03 608.530 748.395 4.464 TBM-04 521.529 751.396 4.040 10 TBM-05 679.429 801.477 4.131 11 TBM-06 500.091 683.137 4.656 12 TBM-08 600.088 651.448 4.800 13 TBM-09 535.170 600.005 4.869 14 TBM-10 668.876 599.980 4.930 Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point 13 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark 15 TBM-12A 625.224 494.200 5.171 16 TBM-14 364.296 410.787 4.674 17 TBM-15 400.115 594.936 4.646 18 TBM-17 496.272 1045.964 4.916 19 TBMO-01 652.010 1054.961 4.669 20 TBMO-03 345.009 924.947 4.725 21 TBMO-04 402.058 1129.947 4.667 22 TBMO-05 345.057 834.964 4.676 23 O 0.000 0.000 Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point Grade traverse horizontal, IV order vertical point This is point the same Plant Coordinate X(East)=0.000, Y (North)=0.000, Remark: Relative between plant coordinate and VN2000 system: - Vertical axis symbol N(Y), parallel to the west fence of the TB1 thermal power plant - South-West corner point of Project is assigned the value: X=0.000 (m); Y=0.000 (m) the same with VN2000 coordinate system Easting = 610568.993 (m); Northing = 2264905.894 (m) IX CONCLUSION Report on Establishment of the Permanent and Temporary Benchmark for Thai Binh Thermal Power Plant and Transmission Lines Construction Project prepared by PTECH follow Technical Specification and Technical standard Results of Elevation and Coordinate ensure for construction XI REPORT The final report are submitted to the client including 08 sets English The Establishment of the Permanent and Temporary Benchmark report consists of the following: •Technical report 14 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark •Appendix 1: Original data and Equipment’s verification •Appendix 2: Results of IV order horizontal control network •Appendix 3: Results of Grade traverse horizontal control network •Appendix 4: IV order vertical control network •Appendix 5: Photos of site •A CD-ROM diskette holding all presented data is included with the original of the final report 15 PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC ... the Permanent and Temporary Benchmark for Thai Binh Thermal Power Plant and Transmission Lines Construction Project prepared by PTECH follow Technical Specification and Technical standard Results... adjustment PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark... coordinate PORT TECHNOLOGY CONSTRUCTION CONSULTING & COMMERCIAL JSC THAI BINH THERMAL POWER PLANT AND TRANSMISSION LINES CONSTRUCTION PROJECT Report on Establishment of the Permanent and Temporary Benchmark

Ngày đăng: 10/10/2022, 11:57

Xem thêm:

w