1. Trang chủ
  2. » Kinh Doanh - Tiếp Thị

SCM Implementation Methodology & Best docx

67 286 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Nội dung

Jul. 14, 2006 Presented by Rachel Hsieh Rachel_hsieh2000@yahoo.com.tw Supply Chain Management (SCM) Implementation Methodology & Best 2006 Trainers` Training Agenda • The Introduction of SCM Systems • The Practice of Multi-sites Production Planning • SCM Planning Cycle • SCM Planning Policies • The Points for Attention When SCM Projects Are Implemented 2006 Trainers` Training The Introduction of SCM Systems 2006 Trainers` Training SCM Workflow Order & Order & Production Production Planning Planning Allocation Allocation Planning Planning Forecasting Forecasting Netting Netting Master Master Planning Planning Demand Demand Forecasting & Forecasting & Collaboration Collaboration Order Entry Order Entry Order Order Promising Promising Demand Planning Demand Demand Planning Planning Supply Planning Supply Supply Planning Planning Demand Fulfillment Demand Demand Fulfillment Fulfillment New Orders, Promise Information Forecast Supply Allocation Central Planning Supply Plan Frozen Plan Supply Plan/ Allocations Latest Available to Promise Schedule Ship Date Netted Forecast Local Planning Order Quoting 2006 Trainers` Training Introduction to Planning Systems • Manufacturing environments vary greatly. • A planning methodology that works in one environment may fail in another. • Inadequate analysis often results in inefficient planning. • We will discuss various approaches to planning. 2006 Trainers` Training Characteristics of Some Approaches • Material Requirements Planning • Manufacturing Resource Planning – (MRP II) / Order Launch Schemes • Constraint Based Management – Theory of Constraints – Synchronous Flow Management 2006 Trainers` Training Material Requirements Planning (MRP) • Improvement over reorder point • Dependent demand concept •BOM explosions •Netting • Fixed lead times • Planned orders/ Purchase req. • Order launch Demand Inventory Item Master BOM Explosion/ Netting Planned Orders Purchase Req. Copyright ©1997 i2 Technologies Open Order 2006 Trainers` Training Manufacturing Resource Planning (MRP II) Order Launch • Builds on data of “little MRP” • Adds business strategy integration • Adds rough cut capacity check • Adds resource capacity check • Adds shop floor feedback • Iterative process Copyright ©1997 i2 Technologies Master Planning Rough Cut Capacity MRP Capacity Requirements Planning Shop Floor Control Business Planning Production Planning 2006 Trainers` Training Manufacturing Resource Planning (MRP II) Order Launch Limitations • Batch processing • Uses planned lead times. • Sequentially decomposes solution with long planning cycles • Lacks sensitivity to constraints . – Capacity constraints are accommodated iteratively with material planning as a separate step. – Requirements such as setups are improperly treated. • Work is pushed through the shop, not pulled. • Local optimization 2006 Trainers` Training MRP II Limitations for Planning Master Planning Rough Cut Capacity MRP Capacity Requirements Planning Shop Floor Control Business Planning Production Planning Copyright ©1997 i2 Technologies • Schedule doesn’t account for material and capacity constraints • Plan doesn’t incorporate material shortages • Schedule doesn’t account for material and capacity constraints • No optimization of bottlenecks 1 2 3 4 1 2 3 4 [...]... Account for material and capacity constraints ̇ Quick response to the variety of supply/demand ̇ The time to calculate is shorter than MRP ̇ Reduce planning cycle time ̇ Get more SCM information ̇ Simulation function ̇ Strength SCM process ̇ Reduce inventory 2006 Trainers` Training Adexa’s Unified Environment Also connection to existing order entry front end ATP Users Web Access GRA Server SC Agents (purchasing,... Customers, Products, Backend resources DF Sales Order Info 2006 Trainers` Training Order Promise Order Inquiry ERP/ Legacy DB FP FP FP FP The Practice of Multi-Sites Production Planning 2006 Trainers` Training SCM Planning Cycle 2006 Trainers` Training Solution Architecture E-Procurement ERP APS FCST Net FCST Net Procure Req PO EDC Quote< >Commit ata gD nin Plan lan nP tio Planning Server duc ro P MO Sc hed... plan using Rhythm tools, updating memoryresident data Summary—Typical Rhythm Planning Cycle Approval Process Execution Systems 13 1 Rhythm What-If Data Files 12 Rhythm Data Files 2 11 3 Run Rhythm Server & Client 4 5 Data Cleanup Material Planning 7 Capacity Planning 6 1 Download data 2 Run Rhythm (cron job) Auto Capacity 10 Detailed Scheduling Save Plan 8 Plan Capacity Automatically 8 Review late orders—... arrival 3 Data Feedback DECISION POINTS 7 Sales -Confirm Schedule Ship date -Confirm Promise Date 2006 Trainers` Training 6 PC - Create MO - Adjust MO part list - Schedule Overtime - Adjust MO Schedule SCM Planning Policies 2006 Trainers` Training The Method to Plan a Master Schedule • Determine profile buckets according to Master Planning buckets • Determine how forecast is distributed into profile . Hsieh Rachel_hsieh2000@yahoo.com.tw Supply Chain Management (SCM) Implementation Methodology & Best 2006 Trainers` Training Agenda • The Introduction of SCM Systems • The Practice. Planning • SCM Planning Cycle • SCM Planning Policies • The Points for Attention When SCM Projects Are Implemented 2006 Trainers` Training The Introduction of SCM

Ngày đăng: 05/03/2014, 20:20