TI 801-02
November 01, 2002
US Army Corps
of Engineers
Technical Instructions
Family Housing
Volume 1A: ProjectManagementManualOne-Step“Turn-Key”Method
Headquarters
U.S. Army Corps of Engineers
Directorate of Military Programs
Engineering and Construction Division
Washington, DC 20314-1000
[...]... HOUSING 2-1 VOLUME 1, USING THE PROJECTMANAGEMENTMANUAL 2-1.1 The Project Management Manual provides a step by step discussion of the process of procuring Army Family Housing utilizing the one-step turnkey process Each chapter describes a phase of the work, and chapters are placed in project sequence Checklists of typical activities are included at the end of most chapters Project design teams are encouraged... checklists with respect to the specific work assignments and methodologies of their specific Districts, the Activity Lead identification is only an example of a possible process The appendices which follow this Project Management Manual are provided to facilitate the source selection process This chapter discusses the ways of using the Project Management Manual, its appendices, and the Model Request for Proposals... completeness and lack of internal conflicts 4-1.6 Project Delivery Team The project delivery team is lead by the PM The team members include the technical disciplines and interested parties needed to successfully execute the project Composition of the team will change as the project progresses through the solicitation process At this initial stage of the project, the project delivery team should include at least... Scope and Project Definition Conferences The general scope and composition, in terms of numbers of dwelling units, unit types, and number of bedrooms for each unit type will be specified in the design directive and the project DD Form 1391 The initial directive also generally requires a pre-design or pre-RFP preparation conference to be held at the installation 4-1.3 Project Management The USACE Project. .. consultation with the PDT, should establish an overall project schedule as soon as possible after receipt of the Code 1 Directive Normally, this should be completed within the first 30 days and entered into Project Reporting and Management Information System (PROMIS) Financial management data should be entered in the Corps of Engineers Financial Management System (CEFMS) The PM is responsible for complying...CEMP-M/CECW-E TI 801-02 01 Nov 2002 GENERAL ABBREVIATIONS DB Design-Build PM Project Manager PA/PE Project Architect /Project Engineer (Technical Point) CS Contract Specialist TM Army Technical Manual ER Army Engineer Regulation PDT Project Delivery Team SSEB Source Selection Evaluation Board RFP Request for Proposal SSA Source Selection Authority 1-5 CEMP-M/CECW-E... cost of the houses to the 1500-mm [5-ft] line k Establish the initial project delivery team l Develop the project schedule and enter in PROMIS m Schedule Project Definition Conference Notify participants in writing of the meeting date, time, and place n Prepare and Staff Acquisition Plan REFERENCES 4-1 ER 5-1-11, "Programs and Project Management" , 27 Feb 1998 4-4 PM PA /PE X X X CS X X X X X X X X X X... provide This attachment will only be used for projects which include demolition requirements 2-7 CEMP-M/CECW-E TI 801-02 01 Nov 2002 CHAPTER 3 PROJECT DEVELOPMENT AND SITE SELECTION 3-1 PROJECT DEVELOPMENT 3-1.1 Programming is the responsibility of the military installation, Major Army Command (MACOM), and the Assistant Chief of Staff for Installation Management (ACSIM) The U.S Army Corps of Engineers... effects will be considered in the planning of projects and proposals including those for family housing A preliminary environmental assessment should be made, by the installation, at the earliest stages of project development A written environmental assessment will be proposed for all family housing projects and made a part of the planning record For those projects having a significant impact on the... the entire project team The conference is also the PM's opportunity to ask questions and to satisfy him/herself that the project scope and constraints are accurately reflected in the project DD Form 1391 4-3.2 The PM is responsible for explaining to the user the Design-Build process and his or her role as the leader of the PDT Unless the user has recently participated in a design build project, he/she . Instructions
Family Housing
Volume 1A: Project Management Manual
One-Step “Turn-Key” Method
Headquarters
U.S. Army Corps of Engineers. acquisition. Detailed instructions for using the Project Management Manual, for
editing the Project Management Manual appendices, and for editing the sections