Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 59 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
59
Dung lượng
596 KB
Nội dung
Bài giảng 15c: Bảngcâuhỏi CVM
Trương Đăng Thụy
Typical Workplan for SP Study
Initial Research
Choice of survey method & valuation technique
Choice of population & sample
Questionnaire Design
Test the questionnaire & conduct main survey
Econometric Analysis
Validity & Reliability testing
Aggregation and reporting
What question is being answered?
What is the object being valued?
What is the survey method?
Contingent valuation or choice
modeling?
Database coded & transferred to
econometrics experts
Focus group
Re-design questionnaire
Pre-test survey
Re-design questionnaire
Conduct main survey
What form of question?
What elicitation format?
What payment vehicle?
What is the target population?
What kind of sample should be
selected?
Do the results meet validity & reliability
tests?
Aggregation to the target population &
reporting
Questionnaire Design
“. . .respondents give answers that
are inconsistent with the tenets
of rational choice, that these
respondents do not understand
what is it they are being asked
to value (and, thus, that stated
values reflect more than that
which they are being asked to
value), that respondents fail to
take CV questions seriously
because the result of the
surveys are not binding, and
raise other objections as well.”
!
An outstanding feature of the lower Mekong
region is the dynamic energy of its natural
systems.
The natural dynamics of the region is one of
its most important development assets to be
safeguarded and maintained. The essential
role of ecosystems in their natural state for
maintaining the stability and productivity of
local economies and social systems is
becoming increasingly evident in the Mekong
region. Around 80 per cent of its population
is directly dependent on the productive
capacity of healthy natural systems. The
relationship between water resources and
protected areas in particular is of growing
significance to the regional economy.
!
Governments of the region appear to have
recognized that the protection and
maintenance of its remaining natural
systems is essential to national welfare. The
natural systems which are the foundation for
regional development cross national
borders. Some of the most important
protected areas are adjacent to others in
neighboring countries.
Suppose a Regional Protected Area
Conservation Program would mean that you
and other households in Cambodia, Lao,
Thailand and Vietnam would pay a fixed
monthly fee of US$2 per month. The money
raised would go to the Lower Mekong
Region Protection Trust Fund.
!
Would you be willing to pay US$2/month for the
Regional Protected Area Conservation Program
for Lower Mekong protection?
___Yes ___No
If yes, why are you willing to pay?
If no, why are you not willing to pay?
(Pls. specify your one major reason)
Possible Problems
•
Individuals answer willingness-to-pay
questions inaccurately due:
–
To failure in understanding because the
questionnaire is poorly designed (vague or
insufficient vital information)
–
To problems with survey administration (e.g.
poorly trained enumerators)
"#$
%&#'(
)
Key element in SP: properly
designed questionnaire
)
Should make respondent
*
!+
*
,+
*
#,+
,
)
Principal Challenge: make scenario
understandable, plausible, &
meaningful
Stages of SP Questionnaire Design
Stages of SP Questionnaire Design
First stage: Formulating the valuation problem
-
Policy change being valued
-
Valuation scenario (Method of provision, Payment vehicle,
Decision rule, Time frame of payment)
-
Response Format
Second stage: Additional questions
- Debriefing & follow-up questions (screen protest & misleading
responses)
-
Attitudes, opinion, knowledge & uses
-
Demographics
-
Questionnaire structure
Third stage: Pre-testing the questionnaire
- Focus groups, re-design questionnaire, pre-test, re-design again
[...]... picture for each of these measures) - Reforest a bigger area in the watershed per year; - Employ sustainable upland farming technology and refrain from any cutting of trees; – – Invest in agro-forestry activities; Install soil erosion control structures (vegetative and engineering) In the short term, these will help reduce or eliminate illegal logging, kaingin (slash-and-burn cultivation), forest fires,... cards & dichotomous choice formats • Advantages – Payment Card: informative and may be cheaper to implement – Dichotomous choice: (1) Individuals used to making choices on take-it-or-leave it basis; (2) easier to answer “yes - no” than give a $ value; (3) is incentivecompatible—respondents best strategy is to give truthful answer Budget Reminder Please don’t agree to pay an amount if you think you... Individual or household payment Note: Reference income to be elicited in the survey should be consistent with the unit of analysis d Timing of payment - One lump (1-time K expenditure); yearly, monthly, daily, per visit (goods continually provided) - Frequency has effect on WTP Valuation Scenario: 3 Method of Payment: Benefit Measures WTP to secure a gain Would you be willing to pay 5000 kip/mo for... change Change to be valued Damages caused in a river from increased water abstraction Problems - Scientific uncertainty regarding physical changes caused by abstractions - Difficulty in describing wide range of changes in flora, fauna, etc - Damages may be different in different stretches of the river What then is usually valued Physical descriptions of changes • in resource conditions frequently are... physical changes affect well-being; • It may be difficult to get those in charge of a policy or project that will lead to the change to be valued to commit to what the project will actually do; • Difficult to convey the effects of policy change; Example of Problems in defining policy change Change to be valued Damages caused in a river from increased water abstraction Problems - Scientific uncertainty... questionnaire However, you may consult with other members of your household when answering the questionnaire if you wish “ Formulating the Valuation Problem Elicitation Method Elicitation Format • Open-ended – asks directly the maximum amount the respondent is willing to pay • Payment card – shows a card that indicates a sequence of prices and allows the respondents to choose one • Bidding Game – proposes .
Bài giảng 15c: Bảng câu hỏi CVM
Trương Đăng Thụy
. structure
Third stage: Pre-testing the questionnaire
- Focus groups, re-design questionnaire, pre-test, re-design again
-
.
+.,