1. Trang chủ
  2. » Công Nghệ Thông Tin

Tài liệu Etherchannel Misconfiguration Troubleshooting docx

4 177 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 4
Dung lượng 29,13 KB

Nội dung

1-4 Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Lab 5.3.7 Etherchannel Misconfiguration Troubleshooting 2/3 Fast0/1 Fa 0/12 Trunk 802.1q Crossover Connection ALSwitch 10.1.1.3 2900XL-Ent DLSwitch 10.1.1.2 4006 L3 Client 10.1.10.2/24 DLRouter 10.1.1.1 VLAN 1 Network : 10.1.1.0/24 VLAN 1 Gateway : 10.1.1.1 VLAN 10 Network : 10.1.10.0/24 VLAN 10 Gateway : 10.1.10.1 Objective Switch management includes the ability to communicate to all switches through a routed environment. This requires that all switches be properly configured with the necessary TCP/IP settings. Some networks want no VLAN 1 access from non-VLAN 1 hosts and some networks require management access to VLAN 1 from any other VLAN using access-lists to control who may have ac- cess to VLAN 1 from other VLAN’s. Scenario As the Enterprise Network Administrator, you have a medium switched net- work. The network is functioning well. Network administrator workstations are located on VLAN 1. This VLAN is used to manage network switches and routers. Administrators would like to administrate the network devices from VLAN 10 so you change their access switch ports to VLAN10 and their work- station IP addresses. They report they are unable to communicate to any devices on VLAN 1 from VLAN 10 except the DLRouter at 10.1.1.1. Lab Tasks Cable the lab as shown in the diagram. Clear the DLRouter configuration using the following commands: Router#erase start Erasing the nvram filesystem will remove all files! Continue? [confirm]y[OK] Erase of nvram: complete Router#reload Proceed with reload? [confirm]y Clear the DLSwitch configuration using the following commands: Console> (enable) clear config all This command will clear all configurations in NVRAM. This command will cause ifIndex to be reassigned on the next system startup. 2-4 Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Do you want to continue (y/n) [n]? y 2001 Jun 16 12:29:45 %PAGP-5-PORTFROMSTP:Port 2/1 left bridge port 2/1 .2001 Jun 16 12:29:45 %PAGP-5-PORTFROMSTP:Port 2/2 left bridge port 2/2 2001 Jun 16 12:29:45 %PAGP-5-PORTFROMSTP:Port 2/3 left bridge port 2/3 Console> (enable) reset This command will reset the system. Do you want to continue (y/n) [n]? y Clear the ALSwitch configuration and VLAN database using the following com- mands: ALSwitch#clear start Erasing the nvram filesystem will remove all files! Continue? [confirm]y[OK] Erase of nvram: complete ALSwitch#delete vlan.dat Delete filename [vlan.dat]? Delete flash:vlan.dat? [confirm]y ALSwitch#reload Proceed with reload? [confirm]y Load the configuration file called Lab5-3-7-DLRouterBrokenConfig.txt into the DLRouter router. Load the file called Lab5-3-7-DLSwitchBrokenConfig.txt into the DLSwitch switch. Load the file called Lab5-3-7-ALSwitchBrokenConfig.txt into the ALSwitch switch. Configure the client with the ip address, default gateway, and subnet mask listed in the diagram. Step 1 Define your problem. From the management workstation ping all interfaces on VLAN 1 and VLAN 10. Step 2 Gather the Facts. Based on the current information you have, issue the following commands to narrow down your possibilities. Console into each device and ping the interfaces on VLAN1 and VLAN10. Ping from the ALSwitch. ALSwitch#ping 10.1.10.1 3-4 Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.10.1, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 1/202/1001 ms ALSwitch#ping 10.1.1.1 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.1.1, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 1/6/26 ms ALSwitch#ping 10.1.1.2 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.1.2, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 5/9/11 ms ALSwitch#ping 10.1.10.2 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.10.2, timeout is 2 seconds: Success rate is 0 percent (0/5) Ping from the DLSwitch. DLSwitch> (enable) ping 10.1.10.2 10.1.10.2 PING Statistics 5 packets transmitted, 0 packets received, 100% packet loss DLSwitch> (enable) ping 10.1.1.2 !!!!! 10.1.1.2 PING Statistics 5 packets transmitted, 5 packets received, 0% packet loss round-trip (ms) min/avg/max = 1/2/7 DLSwitch> (enable) ping 10.1.1.1 !!!!! 10.1.1.1 PING Statistics 5 packets transmitted, 5 packets received, 0% packet loss round-trip (ms) min/avg/max = 6/7/8 DLSwitch> (enable) ping 10.1.10.1 !!!!! 10.1.10.1 PING Statistics 5 packets transmitted, 5 packets received, 0% packet loss round-trip (ms) min/avg/max = 7/8/12 Ping from the DLRouter. DLRouter#ping 10.1.1.3 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.1.3, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 1/3/8 ms DLRouter#ping 10.1.1.2 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.1.2, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 8/8/12 ms DLRouter#ping 10.1.10.2 Type escape sequence to abort. Sending 5, 100-byte ICMP Echos to 10.1.10.2, timeout is 2 seconds: !!!!! Success rate is 100 percent (5/5), round-trip min/avg/max = 1/1/4 ms 4-4 Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Step 3 Based on your observations there appears to be a problem with communica- tions to/from the management workstation. So the problem appears to be at the router. Step 4 List the possible causes of this problem. Use the information you have and your knowledge of switches and routers to isolate the problem. Step 5 Create an Action Plan. Step 6 Implement the Action Plan. Step 7 Observe the Results of the Action Plan. Step 8 Document your work. . Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Lab 5.3.7 Etherchannel Misconfiguration Troubleshooting 2/3. to be reassigned on the next system startup. 2-4 Semester 8 Internetwork Troubleshooting v1.0 - Lab 5.3.7 Copyright  2001, Cisco Systems, Inc. Do you

Ngày đăng: 24/01/2014, 19:20

TỪ KHÓA LIÊN QUAN

w