Tài liệu Case Study - Initiative Media pdf

Tài liệu Case Study - Westin-Hotel pdf

Tài liệu Case Study - Westin-Hotel pdf

... WESTINHOTEL Sydney, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system by Sielox Security Systems to connect the room

Ngày tải lên: 20/12/2013, 22:15

2 228 1
Tài liệu Case Study - Action Supermarkets pdf

Tài liệu Case Study - Action Supermarkets pdf

... critical,” said Mr Royes. “We had just 10 weeks to complete the project.” New state-of-the-art HP and NCR front-end Point of Sale registers were installed at each store, connecting to a Back Office ... Manager, Information Tech- nology, at FAL’s head office at Canning Vale, WA. “The former Franklins’ stores were running proprietary software and free- standing older-style registers, which were...

Ngày tải lên: 20/12/2013, 22:15

2 286 0
Tài liệu Case Study - Century Bank pdf

Tài liệu Case Study - Century Bank pdf

... of unplanned expense. PROJECT HITS A SNAG Century Bank and Trust is a state-chartered full-service commercial bank operating 22 full-service branches in the greater Boston area. The construction project ... larger conduit—an expensive and time-consuming operation that would put the project behind schedule. Luckily for Century Bank, the solution was already in hand. CASE STUDY CENTURY BANK...

Ngày tải lên: 16/01/2014, 21:20

2 274 0
Tài liệu Case Study - Century Zinc pdf

Tài liệu Case Study - Century Zinc pdf

... CENTURYZINC North West Queensland, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system for wiring control equipment for the Pasminco ... degree of control cabling for low voltage applications. The criteria for selecting a connecting sys- tem were reliability in harsh conditions, low installation cost, reduced installation time and ... that the terminations were carrie...

Ngày tải lên: 16/01/2014, 21:20

4 365 0
Tài liệu Case Study - Data Center pdf

Tài liệu Case Study - Data Center pdf

... the goal of creating highly efficient, reliable and cost-effective data centers. Specifically, network planners, following an across-the- company mandate to reduce operating costs and make smarter ... CASE STUDY Data Centers Lowering the Cost of Ownership CHALLENGE A wireless service provider sought ... service disruption • Better use of floor space, and • Highest quality and reliabilit...

Ngày tải lên: 16/01/2014, 21:20

4 242 0
Tài liệu Case Study - Deakin University pdf

Tài liệu Case Study - Deakin University pdf

... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... KRONE's TrueNet  Deakin University has selected KRONE's TrueNet  solutions and Patch-by-Exception (PBE) methodology for the major upgrade of its five campuses in Victoria. Twice voted ... remainder of the campus will still be active. " We are installing KRONE's Cat...

Ngày tải lên: 16/01/2014, 21:20

2 265 0
Tài liệu Case Study - KPR Omnicom pdf

Tài liệu Case Study - KPR Omnicom pdf

... LAN In renovating a Dallas, Tx. high-rise, the renowned global advertising and media services firm sought a future-proof cabling infrastructure to support its ten-floor Gigabit Ethernet LAN. O Omnicom ... Tx. “The goal for OMS’s cabling infrastructure was to install a high-performance, end- to-end communications system that would fully-support all foreseeable applications,” Chauza noted....

Ngày tải lên: 24/01/2014, 03:20

4 206 0
Tài liệu Case Study - PBE - Utah State University pdf

Tài liệu Case Study - PBE - Utah State University pdf

... be re-wired at any time. To return it to its original status, the patch cord is simply removed — instantly returning the circuit to its original setting. This system is ideal for end-of-semester ... Telecommunications and Telephone Services moved forward with infra- structure upgrades to support new technologies and applications. This unit of telecomm- unications is part of the USU Office of...

Ngày tải lên: 09/12/2013, 16:15

4 328 0
w