... WESTINHOTEL Sydney, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system by Sielox Security Systems to connect the room
Ngày tải lên: 20/12/2013, 22:15
Tài liệu Case Study - Action Supermarkets pdf
... critical,” said Mr Royes. “We had just 10 weeks to complete the project.” New state-of-the-art HP and NCR front-end Point of Sale registers were installed at each store, connecting to a Back Office ... Manager, Information Tech- nology, at FAL’s head office at Canning Vale, WA. “The former Franklins’ stores were running proprietary software and free- standing older-style registers, which were...
Ngày tải lên: 20/12/2013, 22:15
Tài liệu Case Study - Century Bank pdf
... of unplanned expense. PROJECT HITS A SNAG Century Bank and Trust is a state-chartered full-service commercial bank operating 22 full-service branches in the greater Boston area. The construction project ... larger conduit—an expensive and time-consuming operation that would put the project behind schedule. Luckily for Century Bank, the solution was already in hand. CASE STUDY CENTURY BANK...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Century Zinc pdf
... CENTURYZINC North West Queensland, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system for wiring control equipment for the Pasminco ... degree of control cabling for low voltage applications. The criteria for selecting a connecting sys- tem were reliability in harsh conditions, low installation cost, reduced installation time and ... that the terminations were carrie...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Data Center pdf
... the goal of creating highly efficient, reliable and cost-effective data centers. Specifically, network planners, following an across-the- company mandate to reduce operating costs and make smarter ... CASE STUDY Data Centers Lowering the Cost of Ownership CHALLENGE A wireless service provider sought ... service disruption • Better use of floor space, and • Highest quality and reliabilit...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Deakin University pdf
... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... KRONE's TrueNet Deakin University has selected KRONE's TrueNet solutions and Patch-by-Exception (PBE) methodology for the major upgrade of its five campuses in Victoria. Twice voted ... remainder of the campus will still be active. " We are installing KRONE's Cat...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - KPR Omnicom pdf
... LAN In renovating a Dallas, Tx. high-rise, the renowned global advertising and media services firm sought a future-proof cabling infrastructure to support its ten-floor Gigabit Ethernet LAN. O Omnicom ... Tx. “The goal for OMS’s cabling infrastructure was to install a high-performance, end- to-end communications system that would fully-support all foreseeable applications,” Chauza noted....
Ngày tải lên: 24/01/2014, 03:20
Tài liệu Case Study - PBE - Utah State University pdf
... be re-wired at any time. To return it to its original status, the patch cord is simply removed — instantly returning the circuit to its original setting. This system is ideal for end-of-semester ... Telecommunications and Telephone Services moved forward with infra- structure upgrades to support new technologies and applications. This unit of telecomm- unications is part of the USU Office of...
Ngày tải lên: 09/12/2013, 16:15