Tài liệu Case Study - Data Center pdf
... cost-effective data centers. Specifically, network planners, following an across-the- company mandate to reduce operating costs and make smarter use of capital, determined that each data center ... CASE STUDY Data Centers Lowering the Cost of Ownership CHALLENGE A wireless service provider sought to minimize both capital and operating expenses by redesigning its data centers....
Ngày tải lên: 16/01/2014, 21:20
... WESTINHOTEL Sydney, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system by Sielox Security Systems to connect the room
Ngày tải lên: 20/12/2013, 22:15
... critical,” said Mr Royes. “We had just 10 weeks to complete the project.” New state-of-the-art HP and NCR front-end Point of Sale registers were installed at each store, connecting to a Back Office ... Manager, Information Tech- nology, at FAL’s head office at Canning Vale, WA. “The former Franklins’ stores were running proprietary software and free- standing older-style registers, which were...
Ngày tải lên: 20/12/2013, 22:15
Tài liệu Hệ thống Data Center pdf
... Hệ thống Data Center I. Giới thiệu hệ thống Data Center - Nơi tích hợp tất cả các công nghệ hàng đầu về mạng, hệ thống và phần mềm ứng dụng được sử dụng trong hệ hống Data Center. - Mạng được ... của hệ thống Data Center. III. Yêu cầu phần cứng và phần mềm của hệ thống Data Center 1. Network Chúng tôi giới thiệu sử dụng công nghệ mạng của Cisco System cho hệ th...
Ngày tải lên: 22/12/2013, 12:16
Tài liệu Case Study - Century Bank pdf
... of unplanned expense. PROJECT HITS A SNAG Century Bank and Trust is a state-chartered full-service commercial bank operating 22 full-service branches in the greater Boston area. The construction project ... larger conduit—an expensive and time-consuming operation that would put the project behind schedule. Luckily for Century Bank, the solution was already in hand. CASE STUDY CENTURY BANK...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Century Zinc pdf
... CENTURYZINC North West Queensland, Australia Scope: A case study on the use of the KRONE TERMINATOR™ system for wiring control equipment for the Pasminco ... degree of control cabling for low voltage applications. The criteria for selecting a connecting sys- tem were reliability in harsh conditions, low installation cost, reduced installation time and ... that the terminations were carrie...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Deakin University pdf
... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... KRONE's TrueNet Deakin University has selected KRONE's TrueNet solutions and Patch-by-Exception (PBE) methodology for the major upgrade of its five campuses in Victoria. Twice voted ... remainder of the campus will still be active. " We are installing KRONE's Cat...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - KPR Omnicom pdf
... as well as to the main cross-connect (MCC) — also called the Data Center — and telecommunications room (TR) build-outs. The MCC and TRs are connected via high-pair-count copper cables for voice services ... Tx. “The goal for OMS’s cabling infrastructure was to install a high-performance, end- to-end communications system that would fully-support all foreseeable applications,” Chauza no...
Ngày tải lên: 24/01/2014, 03:20
Tài liệu Case Study - PBE - Data Center - Next Links ISP Data Centres pdf
... and Europe. Together with Concentric Network, a whol- ly owned sub- sidiary of NEXTLINK, the company offers end-to-end com- munication ser- vices, including local and long distance voice, digital ... proved to be skillful at managing the data center s infrastruc- ture performance. Five years ago, faced with the data center challenges of increased perfor- mance, higher availability, sy...
Ngày tải lên: 24/01/2014, 03:20