Tài liệu Case Study - SRA Security Project pdf
... Authority Safe Stations, Passenger and Security Project A case study on the use of the KRONE TERMINATOR™ System by Tyco Integrated Systems (formerly Philips Projects Australasia) to connect the ... interchanges is a major concern for the SRA. In the 1990s, a Master Plan was drawn up by SRA and tenders were called for a security surveillance system. Philips Projects Australasia w...
Ngày tải lên: 10/12/2013, 02:15
... Authority Safe Stations, Passenger and Security Project A case study on the use of the KRONE TERMINATOR™ System by Tyco Integrated Systems (formerly Philips Projects Australasia) to connect the ... interchanges is a major concern for the SRA. In the 1990s, a Master Plan was drawn up by SRA and tenders were called for a security surveillance system. Philips Projects Australasia w...
Ngày tải lên: 10/12/2013, 03:15
Tài liệu Case Study - St Andrew Hospital pdf
... for our communications network. " The project team looked at higher technologies such as Cat 6 and options such as pair managed, RJ45 and Patch-by-Exception solutions from KRONE and other ... recently been completed and consists of a nine-storey building containing four ward floors and five levels of car parking. The Information Technology Project Team for stage one comprised Steve E...
Ngày tải lên: 10/12/2013, 02:15
Tài liệu Case study - PBE - Utah University pdf
... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY MEETING ... we finished the evaluation it was the best end-to-end cabling solution for all of our criteria. The new Engineering Building was our very first all-TrueNet...
Ngày tải lên: 16/01/2014, 21:20
Tài liệu Case Study - Motorola MOS17 - Project Briefing pptx
Ngày tải lên: 24/01/2014, 03:20
Tài liệu Case Study - PBE - Utah State University pdf
... be re-wired at any time. To return it to its original status, the patch cord is simply removed — instantly returning the circuit to its original setting. This system is ideal for end-of-semester ... distance-learning program that makes up 28% of enrollment. To keep such advanced programs and facilities moving, USU required the most advanced communications equipment available for high-speed .....
Ngày tải lên: 09/12/2013, 16:15
Tài liệu Case Study - Tidel park - Built on strong fiber pdf
... floor on a wall-mount fiber distribution box. From the wall-mount fiber distribution box, each occupant is connected by a two-core zip-cord-type duplex LSZH multi-mode and single-mode horizontal fiber ... operators and customers. KRONE has laid a 24-core composite fiber-optic cable, comprising 12-core single-mode (9/125 microns) fibers and 12-core multi-mode (62.5/125 microns) from the Tidel...
Ngày tải lên: 10/12/2013, 03:15
Tài liệu Case Study - Telco - Managing Ethernet Service pdf
... Web Site: www.adc.com From North America, Call Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 For a listing of ADC’s global sales office locations, ... frame remains organized and easy-to-manage even after many changes have occurred. Built-in bend radius protection and generous cable storage ensure that the high-...
Ngày tải lên: 10/12/2013, 03:15