... financial brands shows that inadequate support for the brand and, confusion and lack of understanding of branding are two important factors that constrain the success of these brands (Chernatony and ... knowledge, there is no model of brand equity that particularly focuses on banking service It might be worthwhile and necessary to build a brand equity model in...
Ngày tải lên: 06/11/2012, 15:52
... Application of Gibson and Coyle’s model for pile load tests in Bed (B1 /1/ CRP-0. 01 and B1/4/STN -15 ) Figure 6 .11 Application of Randolph and Deeks’ model for pile load tests in Bed (B1 /1/ CRP-0. 01 and B1/4/STN -15 ) ... of 0.01mm/s and the maintained pile load test (B2 /12 /CRP-0. 01 and B2 /13 /MLT) Figure 6 .10 9 Load-settlement curves for the maintained pile load tests (...
Ngày tải lên: 07/11/2012, 10:44
Statnamic testing of piles in clay 2
... 10.6 26 9.4 0 .28 3h -23 /8/04 22 B3 /22 /MLT MLT 28 0 4. 82 72. 61 9.5 27 0.5 0 .27 25 ,26 /8/04 23 B3 /23 /MLT MLT 28 0 4. 82 72. 61 9 .2 270.8 0 .27 27 / 12/ 8/04 Bed B4/1/CRP-0.01 CRP 28 0 0.01 3. 72- 3.6 56.04 13.3 26 6.7 ... 1.4 2. 5 2. 28 2. 28 10h -2/ 12/ 03 Date of test rate load pulse (kPa) mm/s (kN) (ms) 28 0 0.01 CRP 28 0 100 125 4.5 2. 2 2. 5 2. 53 2. 34 4...
Ngày tải lên: 07/11/2012, 10:44
KRONE - Guide Book - TESTING - Field Performance Testing of Copper & Permanent Link Chanel
... Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels to determine performance compliance to Class D ... configuration of the Permanent Link and Channel is shown below Measurement Permanent Link 90m max CP FD Measurement Channel 100m max Field Performance Testing V10 050111 Page of TO Passive Testing...
Ngày tải lên: 26/10/2013, 19:15
PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL
... Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels to determine performance compliance to Class D (using Cat components) and Class ... to PL testing Channel testing still uses the Vendor’s patch cords, which are to be left in situ after testing The configuration of the Permanent Link and Chann...
Ngày tải lên: 27/10/2013, 17:15
Tài liệu ADC KRONE - Guide - FO - Field Performance Testing of Fiber Link - ISO 11801 ppt
... Method C of TIA/EIA 52 6-1 4-A OF Testing ADC KRONE Requirements V7_1&3T Dr2Page of 12 1-Test Cord Method of Reference Setting = Cl 9.1.2 of ISO/ IEC 1476 3-3 Ed2 Similar to Method of IEC 6128 0-4 -1 Similar ... Planning in ISO/ IEC 1476 3-3 Annex E (Informative) of ISO/ IEC 1476 3-3 sets out the Stages available for OF testing For an ADC KRONE Warran...
Ngày tải lên: 10/12/2013, 02:15
Tài liệu FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class EA pdf
... Performance Testing of Permanent Links and Channels There are distinct areas of cable testing; Certification, Qualification and Verification Certification is the most rigorous of all cable testing ... America) Field Performance Testing V15 060508 Page of 11 Passive Testing With Hand-Held Field Testers There are currently three levels of hand-held field tes...
Ngày tải lên: 12/12/2013, 12:15
Tài liệu ADC KRONE - Guide - Performance Testing of Optical Fiber Link doc
Ngày tải lên: 20/12/2013, 22:15
Tài liệu PERFORMANCE TESTING OF OPTICAL FIBRE LINKS pptx
... OPTICAL FIBRE TESTING FOR COMPLIANCE TO ISO/IEC 11801 All Optical Fibres, including Per-Terminated Optical Fibres shall be CLEANED after installation ... to Method C of TIA/EIA 526-14-A OF Testing ADC KRONE Requirements V7_1&3T Dr2Page of 12 1-Test Cord Method of Reference Setting = Cl 9.1.2 of ISO/IEC 14763-3 Ed2 Similar to Method of IEC 61280-4-1 ... polishing marks...
Ngày tải lên: 22/12/2013, 12:15
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel pdf
... Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels to determine performance compliance to Class D ... configuration of the Permanent Link and Channel is shown below Measurement Permanent Link 90m max CP FD Measurement Channel 100m max Field Performance Testing V10 050111 Page of TO Passive Testing...
Ngày tải lên: 24/01/2014, 03:20
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel (1) ppt
... kronehlp @krone. com.au Web: krone. com.au Copyright © 2004 KRONE (Australia) Holdings Pty Limited Job No.: 6164 02/04 Example of CCTV infrastructure using structured cabling customer problems with other KRONE products ... transmission performance is required for high picture quality, then KRONE s HIGHBAND products are an ideal solution Whilst HIGHBAND might seem to be a premium off...
Ngày tải lên: 24/01/2014, 03:20