... 5 386* 0 0 5 187 0 0 50 2498 0 0 * Best scores for use in calculation of best of best Figure 5. 3 Equipment history record for OEE calculation 66 TPM- A Route to World- Class ... cycle from 64 TPM- A Route to World- Class Performance Total Productive Maintenance (TPM) combines the conventional practice of preventive maintenance with the conc...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 302
  • 0
TPM Route to World Class Performance Part 9 potx

TPM Route to World Class Performance Part 9 potx

... Will save annual rate of A 45 tonnes B 20 tonnes C 10 tonnes 75 tonnes Figure 7.20 Scrap analysis 156 TPM- A Route to World- Class Performance A further key part of the scoping study (see ... Route to World- Class Performance 6.1 5 Conclusions To achieve world- class performance, the company must move forward to: 0 achieve a total quality proce...
Ngày tải lên : 11/08/2014, 18:21
  • 20
  • 247
  • 0
TPM Route to World Class Performance Part 2 pps

TPM Route to World Class Performance Part 2 pps

... 12 TPM- A Route to World- Class Performance Experience shows that for every breakdown there are many contributory factors. These factors are common to more than one breakdown. ... The TPM Infrastructure 18 TPM- A Route to World- Class Performance KPl plant Book covers Breakdowns 18 per months 5 Productivity 100 3 2 1 25 Clothing 707 2l/2 2l/2 1...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 360
  • 0
TPM Route to World Class Performance Part 3 pptx

TPM Route to World Class Performance Part 3 pptx

... will continuously strive to improve that world- class performance. pillar and cornerstone to achieve the above goals, beliefs and values since: 38 TPM- A Route to World- Class Peformance Inject ... deployment route is provided via the pillar champions (Figures 3.3 [inor stops ributory factors A Figure 3.1 The structure of breakdown losses 36 TPM- A Route to...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 352
  • 0
TPM Route to World Class Performance Part 4 docx

TPM Route to World Class Performance Part 4 docx

... easily said, but is potentially difficult to implement unless TPM is tailored to the specific 54 TPM- A Route to World- Class Performance best part about it is that it involves no rocket ... 3.1 6 TPM Pevformance measure 44 TPM- A Route to World- Class Performance Table 3.2 TPM vision of the future Feature Result Machines run close to name- plat...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 352
  • 0
TPM Route to World Class Performance Part 6 pps

TPM Route to World Class Performance Part 6 pps

... control referred to under each of the six losses in Figures 5. 7 -5. 12. However, in order to give an early indication a definition is as follows: 94 TPM- A Route to World- Class Performance ... 43 - 20 = 51 hours Allowed press running time = 52 - 15 = 37 hours 37 51 Product input (units) = 15 50 0 + 80 + 150 = 15 730 Performance rate...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 331
  • 0
TPM Route to World Class Performance Part 7 ppsx

TPM Route to World Class Performance Part 7 ppsx

... 3 680 9.40 45. 5 59 340 Revenue forecast Part Total Operational cost/piece margin (%) (E) 50 20 14.41 25 50 31 20.34 50 50 42 26.28 100 Machine time (h) 10 246 .50 4 9 75. 67 2 790.67 ... 104. 15 77.26 33. 35 Other overheads Total costs Profit Cost apportionment Part Production Material Cycle forecast cost/piece time (min) 50 20 455 40 9.40 13 .5 50 31...
Ngày tải lên : 11/08/2014, 18:20
  • 20
  • 259
  • 0
TPM Route to World Class Performance Part 8 pps

TPM Route to World Class Performance Part 8 pps

... 15 M 53 0 910 T 53 0 910 W 53 0 910 Th 53 0 910 Fr 53 0 910 16 M 53 0 910 T 53 0 910 W 53 0 910 Th 53 0 910 F 53 0 910 17 M 53 0 910 T 53 0 910 W 53 0 910 Th 380 1060 F 53 0 ... 153 96 132 129 90 42 42 99 50 27 1 15 34 356 46 20 20 13 9 9 20 32 12 24 5 17 790 737 814 759 769 820 859 859 79 1 860 851 783 852 70...
Ngày tải lên : 11/08/2014, 18:21
  • 20
  • 186
  • 0
TPM Route to World Class Performance Part 10 doc

TPM Route to World Class Performance Part 10 doc

... checklist 172 TPM- A Route to World- Class Performance 45% ‘VALUE CHAIN’ OEE (80%) 55 % DOOR -TO- DOOR OEE ( 85% ) 4 b Line of factory Suppliers - 65% M/C OEE (90%) Classic 6 x ... Maintenance The alternative: Tomorrow? Probably. . . Maybe. . . Figure 8. 15 What TPM means to us 170 TPM- A Route to World- Class Performance are sampl...
Ngày tải lên : 11/08/2014, 18:21
  • 20
  • 230