In Situ Treatment Technology - Chapter 6 ppt
... $183 20-Aug-98 $64 .65 $138 29-Aug-98 $51 .60 $110 05-Sep-98 $52.33 $98 11-Sep-98 $61 .75 $1 06 19-Sep-98 $59.58 $100 2 6- Sep-98 $60 .30 $98 01-Oct-98 $78.42 $120 21-Oct-98 $105.09 $342 27-Oct-98 $90 .60 $2 36 21-Nov-98 ... $2 36 21-Nov-98 $72.91 $134 19-Dec-98 $85.52 $202 22-Jan-99 $55.81 $93 2 6- Feb-99 $107.27 $108 04-Apr-99 $ 86. 68 $298 29-Apr-99 $83.50 $93 11-Jun-99 $111 .62 $88 1...
Ngày tải lên: 11/08/2014, 06:23
... Primary Standards Inorganic Primary Standards Contaminant MCL (ppb) Contaminant MCL (ppb) Contam- inant MCL Con- tam- inant MCL Contam- inant MCL Contam- inant MCL (ppb) (continued) ©2001 ... Standards Inorganic Primary Standards Contaminant MCL (ppb) Contaminant MCL (ppb) Contam- inant MCL Con- tam- inant MCL Contam- inant MCL Contam- inant MCL (ppb) Alachor 2 Benzene 5 Tota...
Ngày tải lên: 11/08/2014, 06:23
... phase treatment options will be discussed in Chapter 6. CONTAMINANT PARTITIONING IN THE SUBSURFACE Contaminants that are released to the environment will be distributed in the subsurface in ... Extraction and Bioventing" In Situ Treatment Technology Boca Raton: CRC Press LLC,2001 ©2001 CRC Press LLC driven (5/8 inch soil vapor probes can be used). Driving points...
Ngày tải lên: 11/08/2014, 06:23
In Situ Treatment Technology - Chapter 10 pptx
... both existing monitoring wells, as available, and specially installed monitoring points are included within the test area. Testing pro- cedures are briefly summarized below. Baseline Permeability/Mass ... installed during the remedial investigation phase of the project to characterize minor changes in lithology. Cores collected during continuous and depth-specific sampling should also be ex...
Ngày tải lên: 11/08/2014, 06:23
In Situ Treatment Technology - Chapter 11 pptx
... A hanging gate system for remediating shallow plumes. In Situ In Situ In Situ Palmer, Peter L. "Permeable Treatment Barriers" In Situ Treatment Technology Boca Raton: CRC Press LLC,2001 ... contaminated with pesti- cides including BHC, beta-BHC, DDD, DDT, lindane, and methyl parathion. A modified funnel and gate system was constructed by installing a 400-foot...
Ngày tải lên: 11/08/2014, 06:23
Fate of Pharmaceuticals in the Environment and in Water Treatment Systems - Chapter 6 pptx
... 153 skeletonwithacarboxylicacidatposition3,ketogroupatposition4,andabasic N-moiety at position 7. 36 38 Gu and Karthikeyan 39 examined the binding of cipro- oxacin (CIP) (pK a1 =6. 16, pK a2 =8 .62 )toAl-andFe-hydrousoxides.CIPisan important third-generation uoroquinolone ... Sassman,S.A.,Sarmah,A.K.,andLee,L.S.,SorptionoftylosinA,tylosinDandtylo- sin A-aldol in soils, Environ. Toxicol....
Ngày tải lên: 18/06/2014, 16:20
In Situ Treatment Technology - Chapter 1 pdf
... Pollutants”, EPA Contract Nos. 6 8-0 1-3 867 and 6 8-0 3-2 981 by SRI International, for Monitoring and Data Support Division, Office of Water Regulations and Standards, Washington, D.C. (1982). c. Dawson ... & Miller, Inc. and is responsible for maintaining and expanding the company’s technical expertise in geology/hydrogeology, engineering, modeling, risk assessment, and b...
Ngày tải lên: 11/08/2014, 06:23
In Situ Treatment Technology - Chapter 5 potx
... air-cooled Piston water-cooled Diaphragm 1/2 - 500 10 - 500 10 - 200 10 - 250 10 - 250 10 - 250 Efficient, light-weight Efficient, heavy-duty No seal, contamination-free Rotary Sliding vane 10 - ... 500 10 - 150 Compact, high-speed Screw (helix) 10 - 500 10 - 150 Pulseless delivery Lobe, low-pressure 15 - 200 5 - 40 Compact, oil-free Lobe, high-pr...
Ngày tải lên: 11/08/2014, 06:23
In Situ Treatment Technology - Chapter 7 ppsx
... activity by interfering with protein function. Mercury ions combine with SH groups in proteins, silver ions will precipitate protein molecules, and iodine will iodinate proteins containing tyrosine residues ... (denitrification): 6NO 3 - + 6H + C 6 H 6 → 6CO 2 + 6 H 2 O +N 2 mass ratio of NO 3 - to C 6 H 6 = 4.8:1 0.21 mg/l benzene degraded per 1 mg/l of NO 3 - cons...
Ngày tải lên: 11/08/2014, 06:23
In Situ Treatment Technology - Chapter 8 pps
... Avenue MW- 16 Hexavalent Chromium & HVOC Plumes Hexavalent Chromium Plume Former Chromium Waste-Storage Area Former TCE Degreasing Area MW-10 MW-13 MW-14 MW-5 MW-9 MW-13 MW-3B MW-1 Former Drivepoint Injection Well MW-17 MW-4 MW- 16 MW-17 ©2001 ... LLC Full-Scale Implementation and Results Ninety-one injection points were installed (Figure 26) to 24 feet bls at the site. Ea...
Ngày tải lên: 11/08/2014, 06:23