Volume 20 - Materials Selection and Design Part 5 ppsx
... Selection, Granta Design, 1996 3. CMS Software and Handbooks, Granta Design, 19 95 4. American Institute of Physics Handbook, 3rd ed., McGraw-Hill, 1972 5. Metals Handbook, 9th ed., and ASM Handbook, ... Materials and Processing Approach, 2nd ed., McGraw- Hill, 1991, Chapt. 6 3. M.F. Ashby, Materials Selection in Conceptual Design, Mater. Sci. Technol., Vol 5, June 19...
Ngày tải lên: 10/08/2014, 13:20
... 0. 0-0 .5 1 0.4 25 0. 5- 1 .0 5 0 .58 3, 0.6 45, 0.77, 0.8 15, 0.94 1. 0-1 .5 7 1.01, 1.09, 1.11, 1.21, 1.30, 1.41, 1.49 1. 5- 2 .0 4 1.61, 1.70, 1. 85, 1.97 2. 0-2 .5 2 2.19, 2.32 2. 5- 3 .0 2 2. 65, ... 4.96 4.90 4. 95 7 8.07 6 .54 5. 89 5. 52 5. 29 5. 12 4.99 4.90 4.82 4.76 4.67 4 .57 4.47 4.42 4.36 4.31 4. 25 4 .20 4.14 8 7 .57 6.06 5. 42 5. 05 4....
Ngày tải lên: 10/08/2014, 13:20
... the design process and these design tools. Thus, Volume 20 of ASM Handbook is aimed at two important groups: materials professionals and design professionals. As a handbook on materials selection ... 9). If a part is necessary and a standard part can be used, then it is usually more economical to specify the standard part instead of designing and manufacturi...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 4 docx
... in CAE-based design optimization. Computer-aided-engineering- based design optimization does in fact turn CAE analysis tools into CAE design tools by replacing traditional trial -and- error design ... block-structured grids. On the other hand, unstructured-mesh CFD codes generally demand higher computational resources. Additional memory is needed to store cell-to-cell and vertex-...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 6 doc
... Eng. News-Rec., Vol 120 (No. 18), 5 May 1938, p 65 4-6 55 20. O. Bondy, Brittle Steel a Feature of Belgian Bridge Failure, Eng. News-Rec., Vol 121 (No. 7), 18 August 1938, p 204 -2 06 21. ... Nostrand Reinhold, London, 19 85, p 12 6-1 55 5. T.J. Dolan, Preclude Failure: A Philosophy for Materials Selection and Simulated Service Testing, Exp. Mech., Jan 1970, p 1...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 7 potx
... 751 Ni-15Cr-7Fe-1Nb-2Ti 1310 190 976 142 22 352 HB Nickel-chromium-molybdenum alloys Alloy C-276 Ni- 15. 5Cr-16Mo -5 . 5Fe-3.75W-1.25Co + V 7 85 114 372 54 62 209 HB Alloy 6 25 Ni-21.5Cr-9Mo-3.65Nb ... Ni-21.5Cr-9Mo-3.65Nb + Ta-2.5Fe 930 1 35 517 75 42 .5 190 HB Nickel-chromium-iron-molybdenum-copper alloys Hasteloy G Ni-22. 25 Cr-19.5Fe-6.5Mo-2Cu + Co,Nb,Ta 690 100 320 4...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 8 potx
... 2. 0- 2 .5 24 1- 276 3 5- 40 1. 5- 2 .5 13 80 0- 10 65 15 -2 0 8 3-1 10 1 2- 16 13 8- 207 2 0- 30 17. 2- 20. 7 2. 5- 3.0 207 - 241 3 0- 35 1. 0-1 .5 25 1 96 0- 13 35 1 8-2 5 10 3- 138 1 5- 20 17 2- 241 ... (2 3-2 50 °C), 10 -4 in./in./°C <6 < 3 0-6 5 0. 6-1 .2 5 5- 8 3 8-1 2...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 10 pptx
... life-fraction exposure for Cr-Mo- V steel at various stresses and temperatures. (a) At 480 °C (900 °F). (b) At 54 0 °C (1000 °F). (c) At 56 5 °C (1 050 °F). (d) At 59 5 °C (1100 °F). Source: Ref 85 ... Corrosion-Resistant Materials Handbook, 4th ed., Noyes, 19 85 • DECHEMA Corrosion Handbook: Corrosive Agents and Their Interaction with Materials, D. Behrens (Vol 1-9 ) and...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 11 potx
... For example, a (+ 15 /-1 5) S composite is found to meet load and deflection requirements at a minimum weight; the subscript "S" indicates a symmetric (+ 15 /-1 5 /-1 5/ + 15) laminate. However, ... 140 3-1 409 44. J.H. Selverian and S. Kang, Ceramic-to-Metal Joints: Part II-Performance and Strength Prediction, Am. Ceram. Soc. Bull., Vol 71 (No. 10), 1...
Ngày tải lên: 10/08/2014, 13:20
Volume 20 - Materials Selection and Design Part 12 pdf
... Block 6 1 15 2. 25 22 6 .5 8. 75 Piston 5 1 10 1 .50 00 1 .5 3.0 Piston stop 4 1 80 4.10 00 1 .5 5.6 Spring 3 1 28 3.18 09 7 .5 10.7 Cover 2 2 68 8.00 39 8.0 29.0 Screw Total time: 60 .5 Fig. ... Setup, min 21.2-S Setup 15 21. 2-1 Get 5 frame members from skid 1. 05 21. 2-1 Get 5 brackets from bench 0.21 21. 2-2 Press in hardware (20 rivets)...
Ngày tải lên: 10/08/2014, 13:20