TÀI L IU THAM KHO

Một phần của tài liệu Phát triển công cụ hỗ trợ quản lý năng suất lao động trên công trình xây dựng (Trang 94 - 98)

[1] BáoăThanhăNiên,ă“N ngăsu tălaoăđ ng c a Vi t Nam t t h uă60ăn măsoăv i Nh t B n,”ăpp.ăhttps://thanhnien.vn/nang-suat-lao-dong-cua-viet-nam-tut-hau-60-nam-so- voi-nhat-ban-post1051724.html, 2021.

[2] H ngăỂn,ă“5ăxuăh ng c a ngành xây d ngătrongăn mă2022,”ă2022.ă[Tr c tuy n]. Available: https://toancanhbatdongsan.com.vn/5-xu-huong-nganh-xay-dung-nam- 2022-a953.

[3] inhăTu n H iăetăal.,ăN ngăsu tălaoăđ ng trong xây d ng, Hà N i: Nhà xu t b n Xây d ng Hà N i, 2021.

[4] P. J. K. Yates, Productivity Improvement for Construction and Engineering:

Implementing Programs That Save Money and Time, Virginia: American Society of Civil Engineers, 2014.

[5] RyăSopheap,ă“ ánhăgiáăcácăy u t nhăh ngăđ năn ngăsu tălaoăđ ng c a công nhân xây d ngăCampuchia,”ăTh c s , Nghành Qu n lý xây d ng, i h c Bách khoa TPHCM., 2015.

[6] N.ăN.ăC ng,ă“Xơyăd ng mơ hình d báoăn ngăsu tălaoăđ ng các d án xây d ng

trongăgiaiăđo n thi công s d ng công c m ng Neuron nhân t o,”ăTh c s , Nghành qu n lý xây d ng, i h c Bách khoa TPHCM., 2007.

[7] N.ăV.ăPhát,ă“C i ti năn ngăsu tălaoăđ ng trong xây d ng b ngămơăhìnhăAHP,”ăTh c s , Nghành Qu n lý xây d ng, i h c Bách Khoa TPHCM. , 2017.

[8] Tr ngăCôngăThu n,ă“ nhăh ng c a làm thêm gi đ năn ngăsu tălaoăđ ng trong thi công nhà cao t ng t i Thành Ph H ChíăMinh,”ăTh c s , Nghành qu n lý Xây d ng,

Tr ng i h c Bách Khoa TPHCM, s nhăh ng c a làm thêm gi đ năn ngăsu t

laoăđ ng trong thi công nhà cao t ng t i Thành Ph H Chí Minh, 2012.

[9] V.ăT.ăH.ăGiang,ă“Xơyăd ngăquyătrìnhăđánhăgiáăr i ro cho nhà th u thi cơng cơng trình ng m. Tình hu ng áp d ng t i m tăcôngătyăthiăcông,”ăTh c s , Nghành Qu n lý xây d ng, i h c Bách khoa TPHCM., 2017.

[10] T.ăT.ăP.ăAnh,ă“Nghiênăc u xây d ng b công c đánhăgiáăkh n ngăápăd ng Bim cho doanh nghi p xây d ng t i Vi tăNam,”ăTh c s ,Nghành Qu n lý xây d ng, i h c Bách Khoa TPHCM., 2018.

[11] N.ăN.ăDuy,ă“Thi t k b công c đánhăgiáăn ngăl c gi i quy t v năđ và sáng t o cho h c sinh các t nh mi n núi Tây B c,”ăT p chí Giáo d c, s 443, 2018.

CHÍ DI N_1970702 83

[12] Aynur Kazaz, and Serdar Ulubeyli, "Drivers of productivity among construction workers," A study in a developing country, p. Building and Environment 42 (2007) 2132ậ2140, 2007.

[13] Dai et al., "Latent Structures of the Factors Affecting Construction," J. Constr. Eng. Manage. 2009.135:397-406, 2009.

[14] Mahmoud El-Gohary and Remon, and Fayek Aziz Khaled, "Factors Influencing Construction Labor Productivity in Egypt," doi:10.1061/(ASCE)ME.1943- 5479.0000168, 2013.

[15] Abdulaziz M. Jarkas et al., "Factors Affecting Construction Labor Productivity in Kuwait," American Society of Civil Engineers, 2012.

[16] Mohammed Hamza, Shamsuddin Shahid, and Mohd Rosli Bin Hainin, "Construction labour productivity," review of factors identified, 2019.

[17] Ibrahim Mahamid, "Contractors perspective toward factors affecting labor

productivity in building construction," ngineering, Construction and Architectural Management, vol. 20, no. 5, pp. 446-460, 2013.

[18] E C Lim, and Jahidul Alum, "issues encountered by contractors in Singapore," International Journal of Project Management, vol. 13, no. 1, pp. 51-58, 1995.

[19] Kim, Kiyanoosh Golchin Rad, and Soo-Yong,ă“FactorsăAffectingăConstructionăLaboră Productivity:ăIranăCaseăStudy,”ă2018.ă

[20] G. Robles, A. Stifi, José L. Ponz-Tienda, and S. Gentes, "Factors Influencing the Spanish Construction Labor Productivity," Structural and Construction Engineering, vol. 8, no. 10, 2014.

[21] Wiencke, M. D. Roblyer, and W. R, "Design and Use of a Rubric to Assess and Encourage Interactive Qualities in Distance Courses," American Journal of Distance Education, pp. 77-98, 2010.

[22] Moskal, Barbara M. and Leydens, "Scoring Rubric Development: Validity and Reliability," Practical Assessment, Research, and Evaluation, vol. 7, no. 10, 2000. [23] Heidi Andrade et al., "Assessment & Evaluation in Higher Education," A review of

rubric use in higher education, pp. 435-448, 2009.

[24] Andrade, and Heidi Goodrich, "Understanding Rubrics," originally published in Educational Leadership,, 1997.

CHÍ DI N_1970702 84

[25] Sadler, and D. Royce, "Indeterminacy in the use of preset criteria for assessment and grading," Assessment & Evaluation in Higher Education, pp. 159-179, 2009.

[26] Tashakkori, and Teddlie, Mixed Methodology: Combining Qualitative and Quantitative Approaches, 1998.

[27] Mengshoel, and Anne Marit, "Mixed methods research e So far easier said than done," 2012.

[28] Hubert van Griensven et al., "Mixed methods research e The best of both worlds," 2014.

[29] S. Sreejesh, Sanjay Mohapatra, and M. R. Anusree, Business Research Methods, Switzerland: Springer International Publishing Switzerland , 2014.

[30] M.Easter- Smith et al., Management and Business Research, 2012.

[31] L. Alfeld, Construction productivity: on-site measurement and management, 1988. [32] T.ăT.ăQ.ăC ng,ă“Ễpăd ngăđánhăgiáătheoăRubricătrongăd y h c,”ăB môn PP-CNDH,

khoaăS ăph mă HQGHN.ă

[33] Gerriet Janssen, Valerie Meier ,and Jonathan Trace, "Mixed methods rubric revision," Building a better rubric, pp. Assessing Writing (2015),

http://dx.doi.org/10.1016/j.asw.2015.07.002, 2015.

[34] DFăKramer,ăandăHRăThomas,ă“TheăManualăofăConstructionăProductivityă MeasurementăandăPerformanceăEvaluation,”ă1988.ă

[35] Aynur Kazaz, and Serdar Ulubeyli, "A di erent approach to construction labour in Turkey: comparative productivity analysis," p. Building and Environment 39 (2004) 93ậ100, 2004.

[36] Kathie Lasater, EdD, and RN, "Using Simulation to Create an Assessment Rubric," Clinical Judgment Development, vol. 46, no. 11, 2007.

[37] Nariman Ghodrati, Tak Wing Yiu, and Suzanne Wilkinson, "Unintended consequences of management strategies for improving labour productivity in construction industry," Journal of Safety Research, 2018.

[38] Peter A. Facione, Ph.D. and Noreen C. Facione, Ph.D., "A Tool for Developing and Evaluating Critical Thinking," The Holistic Critical Thinking Scoring Rubric, 2009. [39] Sadler, and D. Royce, "Indeterminacy in the use of preset criteria for assessment and

CHÍ DI N_1970702 85

[40] David W. Halligan et al., "ACTION-RESPONSE MODEL AND LOSS OF

PRODUCTIVITY IN CONSTRUCTION," Journal of Construction Engineering and Management, vol. 120, no. 1, 1994.

[41] H. Randolph Thomas et al., "LEARNING CURVE MODELS OF

CONSTRUCTION PRODUCTIVITY," Journal of Construction Engineering and Management, vol. 112, no. 2, 1986.

[42] a. D. K. M. T .G. Shree Raja Gopal, "A Critical Review on Factors Influencing Labour Productivity in," 2015.

[43] B.ăT.ăDung,ă“Tácăđ ng c aăđ i d ch COVID-19ăđ n th tr ngălaoăđ ng Vi t Nam,”ă

2022. [Tr c tuy n]. Available: https://tapchitaichinh.vn/tai-chinh-kinh-doanh/tac- dong-cua-dai-dich-covid19-den-thi-truong-lao-dong-viet-nam-347525.html. [44] Báo chính ph ,ă"Vìăsaoăn ngăsu tălaoăđ ng Vi t Nam th p," 2019. [Online].

Available: https://baochinhphu.vn/vi-sao-nang-suat-lao-dong-viet-nam-chua-bang- chi-bang-em-102259660.htm.

[45] Rabia Al-Mamlook et al., "Factors Affecting Labor Productivity in the Construction Industry," American Journal of Environmental Science and Engineering, vol. 4, no. 2, pp. 24-30, 2020.

[46] PGS.TSăLêăV năH o,ă“H ng d n thi t k s d ng Rubric và b Rubric m u dùng

choăđánhăgiáăho tăđ ng h c t p,”ă2021.ă

[47] S. Thomas Ng, and Ziwei Tang, "Labour-intensive construction sub-contractors: Their critical success factors," International Journal of Project Management, p. 732ậ

740, 2010.

[48] Bekr, and Dr. Ghanim , "Study of Significant Factors Affecting Labor Productivity at Construction Sites in Jordan: Site Survey," vol. 4, no. 1, pp. 92 - 97, 2016.

[49] Seokyon Hwang et al., "Contemporaneous Time Series and Forecasting

Methodologies for Predicting Short-Term Productivity," J. Constr. Eng. Manage, pp. 1047-1055, 2010.

[50] Heidi Andrade, and Ying Du, "Practical Assessment, Research, and Evaluation," vol. 10, no. 3, 2005.

CHÍ DI N_1970702 86

Một phần của tài liệu Phát triển công cụ hỗ trợ quản lý năng suất lao động trên công trình xây dựng (Trang 94 - 98)

Tải bản đầy đủ (PDF)

(186 trang)