III Chi phí sản xuất (đ)
PAG E1 THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU
THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU
THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU
- MEANS FOR EFFECT NL
---
NL NOS CAO CAY 1 4 100.500 1 4 100.500 2 4 100.550 3 4 103.030 SE(N= 4) 1.44964 5%LSD 6DF 5.01455 ---
- MEANS FOR EFFECT CT$
---
CT$ NOS CAO CAY NHI UU838 3 100.200 NHI UU838 3 100.200 NHI UU70 3 100.500 HYT92 3 103.400 HYT100 3 101.340 SE(N= 3) 1.67390 5%LSD 6DF 5.79030 --- ANALYSIS OF VARIANCE SUMMARY TABLE FILE C1LUALAI 19/ 7/** 23: 9
--- PAGE 3 THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU THIET KE THI NGHIEM THEO KHOI NGAU NHIEN DAY DU
F-PROBABLIITY VALUES FOR EACH EFFECT IN THE MODEL. SECTION - 1
VARIATE GRAND MEAN STANDARD DEVIATION C OF V |NL |CT$ | (N= 12) --- SD/MEAN | | | (N= 12) --- SD/MEAN | | | NO. BASED ON BASED ON % | | | OBS. TOTAL SS RESID SS | | | CAO CAY 12 101.36 2.7947 2.8993 2.9 0.4251 0.5659