0

planning the software project ppt

Tài liệu PROJECT MANAGEMENT INSTITUTE CASE STUDIES IN PROJECT MANAGEMENT: THE CHUNNEL PROJECT ppt

Tài liệu PROJECT MANAGEMENT INSTITUTE CASE STUDIES IN PROJECT MANAGEMENT: THE CHUNNEL PROJECT ppt

Quản lý dự án

... through the life of the project. The two governments moved further away from the teamwork concept when they refused to guarantee the project financially. That put an additional burden on the privatized ... interest in the success of the project. The negotiations of key components of the contract for the project did not yield the most favorable terms for effective delivery, but, rather, the most ... play during the course of the project that had significant effects on the overall course of the project. In the end, the Chunnel project was completed, but it was late and over budget. The causes...
  • 37
  • 903
  • 1
Producing Open Source Software - How to Run a Successful Free Software Project pptx

Producing Open Source Software - How to Run a Successful Free Software Project pptx

Cao đẳng - Đại học

... exceeded the developer base? What if the developers of one project abandonit because they realized they were duplicating the work of another—and what if they join that other project, then expand ... directly from the experiences of the institution andits partners, and therefore if the project fails to relieve them, they will know. This arrangement producesgood software because the feedback ... from the list into a project- specific folder, separate from theirother mail. Their mail reading software can do this automatically by examining the mail's headers. The headers are the fields...
  • 202
  • 2,429
  • 0
Quản lý dự án phần mềm Software Project Planning

Quản lý dự án phần mềm Software Project Planning

Kỹ thuật lập trình

... các kĩ thuật khởi đầu đưa ra các biện pháp cần thiết 1Chương 4:Quản lý dự án phần mềm Software Project Planning 12Tham khảo•Nhung bai hoc tu mot DAPM11Cấu trúc kế hoạch thực hiện dự án•Tổ ... đi lặp lại các công việc sau: –Lập lịch thực hiện dự án –Thực hiện các hoạt động theo lịch trình –Theo dõi sự tiến triển của dự án, so sánh với lịch trình –Đánh giá lại các tham số của...
  • 12
  • 1,565
  • 32
Tài liệu Knowledge Networks: The Social Software Perspective pptx

Tài liệu Knowledge Networks: The Social Software Perspective pptx

Quản trị mạng

... by the following factors: (a) degree, which determines the root by identifying the object with the most direct connections to other objects within the network. This nds the object with the ... inuence over the network, (b) closeness, which determines the root as the object with the lowest number of links to all other objects within the network. This nds the object with the quickest ... from social software is the ability to cross boundaries. People might be able to join communities that they would not otherwise join. They have the opportunity to move beyond their geographic...
  • 423
  • 506
  • 1
Tài liệu Introduction to Requirements – The Critical Details That Make or Break a Project pptx

Tài liệu Introduction to Requirements – The Critical Details That Make or Break a Project pptx

Quản trị mạng

... trademarks of the Project Management Institute, Inc.Page 9Requirements documents are subject to the same software configuration management practices as the otherdeliverables of the software life ... concerned with the process of examining the requirements document to ensurethat it defines the right software (that is, the software that the users expect).Requirements Process The Approach:Identify ... are found, the less expensive they are to fix. The best time to fixthem is when you are involved in gathering, understanding, and documenting them with your stakeholders(who should be the source...
  • 9
  • 417
  • 0
Tài liệu Planning the Installation ppt

Tài liệu Planning the Installation ppt

Chứng chỉ quốc tế

... Linux, the BIOS has to recognize the active primarypartition on the hard drive. This partition should include the Linux boot files. The BIOS can then set up and initialize that hard drive, and then ... essential to the operation of a PC and just can’t be changed. Theseare reserved by the motherboard to control devices such as the hard disk controllerand the real-time clock. Do not use these interrupts ... if you then created another primary partition from some freespace, the IDE drive would renumber the partitions in your BIOS. The numberswouldn’t match the Linux names such as hda2. The boot...
  • 42
  • 433
  • 0
Tài liệu Being Geek: The Software Developer''''s Career Handbook pptx

Tài liệu Being Geek: The Software Developer''''s Career Handbook pptx

Hệ điều hành

... because HR de-partments traditionally have neither the budgets nor the expertise to build the system they’d actually use. They shouldn’t; it’s not the core competency.With half-baked solutions ... through the keyboard is forever, and since their jobs hinge on conversations that we might not want to be forever, they use the phone.Recruiters, on the other hand, are just cold calling. They’ve ... have and the quicker you make them the next time they show up.Still, these are the small bits of unpredictability, and you also need to know what to do when the massive unpredictability appears.A...
  • 337
  • 1,106
  • 0
Tài liệu Making the Business Case for Software Assurance pptx

Tài liệu Making the Business Case for Software Assurance pptx

Tài chính doanh nghiệp

... critical or of the highest value for mission success. Software asset owners are also identified; these are typically software project managers or software line of business/product managers. Software ... assess the value of their profile of systems side by side, which should then let them allocate resources where they can do the most good [HBenson 1992H, HParker 1989H]. IE is based around the ... vulnerabilities, either intentionally designed into the software or accidentally inserted at any time during its life cycle, and that the software functions in the intended manner” [HCNSS 2006H]. If the...
  • 119
  • 1,690
  • 1
Tài liệu A junk-free childhood 2012 - The 2012 report of the StanMark project on standards for marketing food and beverages to children in Europe pptx

Tài liệu A junk-free childhood 2012 - The 2012 report of the StanMark project on standards for marketing food and beverages to children in Europe pptx

Tiếp thị - Bán hàng

... evaluation of the impact of the pledges hard to assess. Furthermore there appear to be lapses in the adherence to these pledges within Europe, and evidence that they are not applied in other regions ... model based on the one developed in the UK by the Food Standards Agency for use by the media and communications regulator, Ofcom.” Danone Will apply the nutritional criteria from the TheFoodProfiler25 ... street graffiti promoting the marketing theme (shown here). Further concerns There are further concerns regarding the self-regulations, which we intend to analyse in the next Stanmark briefing...
  • 32
  • 896
  • 0
Mainstreaming Adolescent Reproductive Health in Senegal: Enhancing Utilization of the Findings from the Youth Reproductive Health Project pptx

Mainstreaming Adolescent Reproductive Health in Senegal: Enhancing Utilization of the Findings from the Youth Reproductive Health Project pptx

Sức khỏe phụ nữ

... submitted to the African Development Bank, which expressed a commitment to fund these activities. This commitment followed the dissemination about the findings from the pilot project and the launch ... to the MOH’s Division of STI/HIV/AIDS for funding by the World Bank. 2. Mainstreaming within the Ministries of Education, Sports, and Youth Based on the findings from the pilot study, the ... FRONTIERS worked with the Ministries of Health and Youth to launch a follow-on project, Enhancing Utilization of the Findings from the Youth Reproductive Health Project. This ongoing project (2004–2007)...
  • 8
  • 596
  • 0
Báo cáo khoa học:

Báo cáo khoa học: "The OpenGrm open-source finite-state grammar software libraries" ppt

Báo cáo khoa học

... history: the leftmoststate is the initial state, representing the <s> his-tory; the central state is the unigram state, represent-ing the  history; the topmost state represents the his-tory ... the the last transition is to a finalstate. Weights combine along the path according to the semiring of the WFST.If every transition in the transducer has the sameinput and output symbol, then ... applications like speech recogni-tion. In the rest of the paper, we will present each of the two libraries, starting with the Thrax grammarcompiler and then the NGram library. First, though,we will...
  • 6
  • 411
  • 0
The WK Kellogg Foundation''''s Orphans and Vulnerable Children Project pptx

The WK Kellogg Foundation''''s Orphans and Vulnerable Children Project pptx

Sức khỏe giới tính

... Community TheatreTraining in community theatreHow the project is monitored The project staff conduct regular monitoring visits and speak to the OVC to find out about their progress. They then write ... different sites. At the camp, they are taught lifeskills to reduce their vulnerability and enable them to manage their lives. They share experiences among themselves, as well as with the project coordinators ... for the OVCHow the project is monitored The project is monitored through cluster monitoring visits that are conducted once a month. These monitor the progress of specific components of the project...
  • 96
  • 393
  • 0
Air Pollution Prevention Through Urban Heat Island Mitigation: An Update on the Urban Heat Island Pilot Project ppt

Air Pollution Prevention Through Urban Heat Island Mitigation: An Update on the Urban Heat Island Pilot Project ppt

Điện - Điện tử

... both the results of the NASA/LBNL analysis aswell as additional information gathered by the Pilot City Teams during the first year of the project. Although specific to each pilot city, the Action ... because the local environmentmodifies the conditions in the thin air stratum above the ground, generally referred to as the atmosphericboundary layer. As humans alter the character of the natural ... illustrate the potential benefits to energy use and air quality through the widespread use ofmitigation strategies. During the second year of the project, EPA will work with the pilot cities to use the analysis...
  • 10
  • 652
  • 1
PROJECT APOLLO The Tough Decisions ppt

PROJECT APOLLO The Tough Decisions ppt

Quản lý dự án

... But then, in the section on Man-in-Space, the report stated that by placing a high pri-ority on the Mercury Project, we had strengthened the popular view of its importance as comparedwith the ... the meeting summarized the objectives of theseprojects and indicated in each case the effectof the funding rate on the schedule. The multi-manned orbital laboratory is contingent upon the Saturn C-1 ... of the Apollo program, there was the need to integrate the activities of the Centers and bring strong in-houseNASA people together into the newly established Office of Manned Space Flight. The...
  • 174
  • 210
  • 0

Xem thêm