geothermal heating and cooling system reviews

Parametric analysis of geothermal residential heating and cooling application

Parametric analysis of geothermal residential heating and cooling application

Ngày tải lên : 05/09/2013, 16:10
... attributes and inf H the factor of opening’s position and air force exposure. Annual heating demand of the building is 33.78 kWh/m 2 whereas cooling demand is 27.34 kWh/m 2 . 3. GSHP system ... reads the annual TRNSYS heating and cooling load profile so as to determine the values of the peak heating and cooling loads for each month of the year (see Table 2) and their durations. Moreover, ... temperature estimations (average deviation ±2.5 K) when annual heating and cooling demand values are close and approximately equal to 30 kWh/m 2 and it is assumed heat pump absence. 5. Conclusion...
  • 14
  • 495
  • 0
UNIFIED FACILITIES CRITERIA (UFC): HEATING AND COOLING DISTRIBUTION SYSTEMS ppt

UNIFIED FACILITIES CRITERIA (UFC): HEATING AND COOLING DISTRIBUTION SYSTEMS ppt

Ngày tải lên : 27/06/2014, 05:20
... INFORMATION 1-1. PURPOSE AND SCOPE. This document provides criteria and guidance for the design and construction of heating and cooling distribution systems and supplements information in ... INFORMATION 1-1. PURPOSE AND SCOPE. This document provides criteria and guidance for the design and construction of heating and cooling distribution systems and supplements information in ... Systems in Concrete Trenches, Prefabricated Underground Heating/ Cooling Distribution Systems, and Aboveground Heat Distribution Systems. The designer is also responsible for the expansion and...
  • 143
  • 428
  • 0
UNIFIED FACILITIES CRITERIA (UFC) HEATING AND COOLING DISTRIBUTION pdf

UNIFIED FACILITIES CRITERIA (UFC) HEATING AND COOLING DISTRIBUTION pdf

Ngày tải lên : 27/06/2014, 17:20
... INFORMATION 1-1. PURPOSE AND SCOPE. This document provides criteria and guidance for the design and construction of heating and cooling distribution systems and supplements information in ... distribution systems include Heat Distribution Systems in Concrete Trenches, Pre-engineered Underground Heat Distribution Systems, Prefabricated Underground Heating/ Cooling Distribution Systems, and ... selecting the system type, refer to ASHRAE Handbook, "HVAC Systems and Equipment.” 2-3. SYSTEM TYPES. When selecting a distribution system, the designer must determine which system types...
  • 143
  • 344
  • 0
FACILITIES CRITERIA (UFC) HEATING AND COOLING DISTRIBUTION doc

FACILITIES CRITERIA (UFC) HEATING AND COOLING DISTRIBUTION doc

Ngày tải lên : 27/06/2014, 17:20
... HTHW and steam systems and PVC encased, prefabricated underground heating/ cooling distribution systems to avoid thermal degradation of the PVC. CEMP-E TI 810-32 10 January 2002 i HEATING AND ... INFORMATION 1-1. PURPOSE AND SCOPE. This document provides criteria and guidance for the design and construction of heating and cooling distribution systems and supplements information in ... selecting the system type, refer to ASHRAE Handbook, "HVAC Systems and Equipment.” 2-3. SYSTEM TYPES. When selecting a distribution system, the designer must determine which system types...
  • 143
  • 302
  • 0
REMOTE CONTROL AND MONITORING SYSTEM VIA SMS AND INTERNET

REMOTE CONTROL AND MONITORING SYSTEM VIA SMS AND INTERNET

Ngày tải lên : 25/04/2013, 11:25
... Command from PC to phone, request send an SMS message to 3.2.4 Structure of ACK command from phone to PC Type: type command of command needed to ack IV. Details of the links in the system ... some PC to connect to remote PC and send device control command. To do that, we open a chat window from YM and send a message which contains standard control commands (ex: D01: ON#, Reload# ) ... 1221) and IP for each PC. The program on center PC is designed to send control commands (messages) to remote PC after connecting successfully. The program on remote PC will receive commands and...
  • 35
  • 434
  • 0

Xem thêm