1. Trang chủ
  2. » Kinh Doanh - Tiếp Thị

Tài liệu Filling of tanks pdf

2 234 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 2
Dung lượng 60,92 KB

Nội dung

PB-Nr: M06.01.03 Filling of tanks Issued by Date Version Page Hr. Heinl Juli 2001 0 1/2 Process owner: Hr. Heinl Prozessprupose and target: Abschlauchen of Tank car car flow/process documentation/competence 1. Preparation The driver of the tank car has to make the connection between tank cars and recipient tank on statement of the responsible magazine coworker 2. Monitoring Here is to be monitored: • possible one max. quantity recipient tank • admissible printing in the tank • safe, fixed link of the lines • grounding link • tightness of the flanges and lines 3. Emergency measures Should it come to a liquid withdrawal, the withdrawn liquid must be detained immediately with suitable means to an entrance into soil or duct system (oil bonding agents). If the danger exists that the liquid gets in the duct system, the access is to be locked immediately in the public duct system means slide gate valve. Additionally the production management is to be informed immediately, who initiates further measures. PB-Nr: M06.01.03 Filling of tanks Issued by Date Version Page Hr. Heinl Juli 2001 0 2/2 . PB-Nr: M06.01.03 Filling of tanks Issued by Date Version Page Hr. Heinl Juli 2001 0 1/2 . immediately, who initiates further measures. PB-Nr: M06.01.03 Filling of tanks Issued by Date Version Page Hr. Heinl Juli 2001 0 2/2

Ngày đăng: 18/01/2014, 15:20

TỪ KHÓA LIÊN QUAN

w