1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Biện pháp thi công lan can kính nhà cao tầng

14 50 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Nội dung

Form FEV-RFI-V1.1 Project Address Package Employer Contractor : : : : : Feliz-En-Vista High-Rise Residential Development At Plot Y1, Thanh My Loi Ward, District 2, HCMC, VN Main Contract CapitaLand- Thien Duc Investment Co., Ltd CSCEC32 RFA Ref No : FEV-CSCEC32-ARCHI-MOS-RFA-054B - Method statement for glass handrail REQUEST FOR APPROVAL (RFA) : VINAQS CO., LTD ; To From: CSCEC32 Main Contractor RSP ARCHITECTS PLANNERS & ENGINEERS (Vietnam) LTD Attention Descipline Dang Thanh Sang, : Le Dinh Luong : Finishing work Subject : Method statement for glass handrail Name: Zhou Wei Date of Request : CC: Date to Reply : 3-Nov-19 CL SCI  Project Manager 24-Oct-19 RSP T&W JRP ATICHA VQS CIDECO  DESCRIPTION: Dear Sirs, We would like to submit Method statement for glass handrail Please review and approve Critical (03 days)  Normal (07 days) Regard, Main Contractor CSCEC32- Project manager Date: Signed: Name: 24-Oct-19 Zhou Wei REPLY: This review is for conformance with the general design concept and for general arrangement expressed in the documents.  Review shall not be construed to mean that the reviewer accepts the detail  calculations and dimensions shown in the shop drawings or any deviation from the requirements of the contract documents.  Contractor is responsible for errors or omissions in the shop drawings; for  meeting all requirements of the contract documents; for confirming and correlating job site dimensions; for information that pertains solely to fabrication process or to techniques of construction, and for  the coordination of the work of all trades. It is understood that the notation on the submittal is not to be construed as an authorization for additional work or additional cost RSP reply Nov 2019 Examined with comments Resubmission is not required - Please refer our comments on the following pages -Wrong waterproofing process.That is not guaranteed so All risks will be borne by the contractor - Please refer comments of Tham & Wong - Pleasr refer setting tiling in SD Signed: RSP The Engineer: TW JRP SCI ATICHA CDC CL Approved Not Approved Date: Approved with comments but works can proceed on site METHOD STATEMENT OF GLASS HANDRAIL WORKS FELIZ EN VISTA PROJECT CONTENTS Introduction General Procedure Construction equipment Principle of Work Procedure Method Statement Quality control Test Plan Introductions This method statement relates to the installation work for handrail glass The project site is located in District 2, HCMC of Vietnam We realize that labor safety, construction quality is an important task placed on the top of all construction work, along with the progress and hygiene work to ensure civilization of construction is also paid attention All necessary specifications, inspection and quality control will be complied with the contract documents, specification If there is any discrepancy in the descriptions below, it will be designated by consultant/Client Construction materials The main scope of works are for Glass Handrail installation All stainless steel products, glass and accessories are produced by large and reputable factories, with modern technology lines that produce high quality products in China such as: Taizhou Century Deli Metal Products Co , Ltd ; Ya Xin Science & Technology Co., Ltd Imported by SanLe Door Co., Ltd Construction tools and materials - Sika Ground - Sika Latex - Silicone - Alcohol - Lazer machine - Concrete drilling machine - concrete chisel machine - Cutting machine Hammer Glass pump - Safety net - Silicone gun - Welding machine Principle of Work Procedure 4.1 Coordination at the Site - Before starting the installation, it is necessary to prepare the site organization, delegating workers, and the required tools and utilities - Communicating with Main contractor about site office preparation and permission for transporting overweighted equipments - Find out the equipments and utilities that will be provided by the Main contractor (CSCEC 3) at the site, such as hoist, tower crane, electricity, water, and etc - Survey and understand the current progress of the main structure and the site regulations on safety, cleaning, fire prevention, and etc - Make entry identification card for all technical officers, supervisors and workers working at site - Communicating with the Main Contractor to find out the storage area at the site, and the storage size and condition for future inventory management at site - Find out the transporting area at the site for product delivery, as well as the preferred delivery time 4.2 Site Work Execution a) Site measurements and marking Since the actual site dimensions might be different from the approved shop drawings, SanLe will perform the site measurement on each item In case of any discrepancy, we shall coordinate with the Employer/Client and the Main Contractor (CSCEC3) to come out with a reasonable solution and must inform to Architect for approval After confirmed with the Main Contractor (CSCEC3) and architect for the actual measurements on site, these figures will form the basis of the production dimensions Equipment : Rolling Ruler – 5m in length, Leveling ruler Preparation : All technical documents of dimensions, measurements, and coordinates on site b) Scaffold Usage: Understand the safety requirements of the site scaffold, such as maximum load, allowed work, conditions, and etc Confirm with the Main Contractor (CSCEC3) with the dates that the scaffold will be installed and taken down Negotiate with the Main Contractor (CSCEC3) to finish all the scope of work that requires scaffolding before it is taken down Installation progress a) Before material delivery to Site After being fabricated at the factory, the Stainless steel products will be transferred to the Q/A department for quality control in areas such as finished dimension against the drawing, workmanship, surface, damage, and etc After that, they will be wrapped with PVC tapes which will prevent surface scratch and minor damage and packed into wooden bales b) Stainless Steel and Glass Installation: Stainless Steel and Glass products and components will first be transferred to the designated areas through site equipments such as tower crane, hoist, winch, and etc Installation process will be from floors to floors, depending on the schedule of the Main Contractor, Stainless Steel and Glass Installation With the proper finish of its surrounding structure and the area handed over c) Q/A of the Stainless Steel and Glass To set up plan and prepare documents for checking the installation of frames After finishing the installation of the frame, quality control department will check the technical requirements Any error will be fixed or replaced on the timely basis 5 Method Statement a Installation Stainless Steel column (50x17; 60x17; 70x17mm) Measuring, locate the foot positions of stainless steel cylinders Use Laser to check the level, the exact position of the stainless steel base leg to be installed, marking the specific position for each stainless steel column Chisel work is carried out with low strength mortar and with level of column as Shopdrawing at previously marked locations - Treat the surface of the chiseled with compound Sika Ground Identify, mark and drill bolt holes Proceeding to place Stainless steel column at the exact location, installing bolts Check the vertical and horizontal accuracy of stainless steel column with laser and ruler Setting to follow CL's standard (sent via RSP's email 27 Aug 2019 - Initialization of waterproofing layer at the foot of stainless steel column Wrong waterproofing process.That is not guaranteed so All risks will be borne by the contractor b Installation Handrails Stainless Steel (30x50x1.2mm) Determine the position of two head of handrails on the wall Identify brick walls or concrete walls Check that brick or concrete walls If it is a brick wall need to be chiseled and reprocess it with Sika Ground compound Accurately locate, drill bolt holes, install linked bass, and install stainless steel handrails Welding stainless steel handrails into bass links, stainless steel column installed earlier Check the accuracy of level and installation location The quality of welding lines should be ensured c Installation laminated tempered glass (6+0.76+6mm) The glass is transported to the location by specialized vehicle - Use glass pump to install the glass, Screw the screw to a moderate force to avoid the glass tank 6 Quality control at the site Ensure that the construction materials are in accordance with the design and structure of the stainless steel to ensure the architectural design and the sample board has been approved by the parties Some references: • The products inspection follow standards at specification of owner • Shop drawing approved by client/consultant • Check the quality follow specification of project       Test plan and checklist for inspection 7.1 Inspection for material come to site /Nghiệm thu vật tư đến cơng trình - Check scratch, breakage, deform, distort /Kiểm tra bể vỡ, mốp méo - Check general quality of materials/ Kiểm tra chất lượng vật tư tổng thể - Check overall quality of products/ Kiểm tra sản phẩm tổng thể 7.2 Inspection on site/ Nghiệm thu cơng trình  Inspection input materials / Nghiệm thu vật liệu đầu vào o Check the quantity base on the list / Kiểm tra sản lượng đầu vào theo hóa đơn o Check products during to materials delivery to site / Kiểm tra sản phẩm suốt thời gian giao hang  Install Stainless steel and glass / Lắp đặt inox kính o Check site openings structural, marking, Setting out / Kiểm tra kích thước lỗ mỡ, test or any checking mực, Pull timout trục the installation has screws, met the Screws and bolts / Kiểm tra vít cấy, vít liên kết, o Check impact plastic design load impact? bu lông liên kết o Check grouting applied of vertical, top, bottom and level of Stainless steel and glass / Kiểm tra grouting, cạnh đứng, cao độ trụ, tay vịn inox kính ... Construction equipment Principle of Work Procedure Method Statement Quality control Test Plan Introductions This method statement relates to the installation work for handrail glass The project site... top, bottom and level of Stainless steel and glass / Kiểm tra grouting, cạnh đứng, cao độ trụ, tay vịn inox kính ... approved by client/consultant • Check the quality follow specification of project       Test plan and checklist for inspection 7.1 Inspection for material come to site /Nghiệm thu vật tư đến

Ngày đăng: 18/08/2021, 18:31

TỪ KHÓA LIÊN QUAN

w