SCAR 8d report template 填寫說明

10 224 2

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 10
Dung lượng 595,53 KB

Nội dung

D1 : Describe the ProblemParts Description Issue Type χ Reject by IQC Production Line Down Failure Rate > Agreed Target Mixed or Wrong Parts Customer Complain Crack, Damaged ,

Trang 1

D1 : Describe the Problem

Parts Description Issue Type (χ) Reject by IQC ( ) Production Line Down ( ) Failure Rate > Agreed Target

( ) Mixed or Wrong Parts ( ) Customer Complain ( ) Crack, Damaged , Burned ( ) RoHS Issue ( ) Reliability Failure ( ) Others

Trang 2

-D2 : Team Building

1 Maxx Nhuong Do Thanh TTi Viet Nam IQC/ SQE Engineer (84)982900847 tn.do@tti.com.hk

2

3

4

5

6

7

請請請請請 8D 請請請請請請請請請 請請 請請請 請請請請請請請

請請 TTI SQE 請請請請請請請請請請

請請請請請請請 8D 請請請請請請請 請請請請請請請請請 請請

Trang 3

D3 : Containment Action

請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請

D3 請請請請請請請請請請請請 , 請請請 , 請請請 請請請請請請請請請 , 請請請請請請

, 請請請請請 請請請請請請請請請請請請請請

請請請請請請請請請請請 (1) 請請 (2) 請請請請請請 (3) 請請 (4) 請請請請 … Etc.

請請請請請

Finish Date

Trang 4

D4 : Identify Root Cause or Potential Cause

Q1: Why the failure escape from Quality Control Gate?

Answer:

Explanation:

Q2: Why the failure not caught by production inspector ?

Answer:

Explanation:

Answer First 請請請請請請請 請請請請請請請請請請請請 請請請請請請請請請

請請請請請請請請請請請請請請請請請請請

Q1 : 請請請請請請請請請請請請請請請請請請請請請

Q2 : 請請請請請請請請請請請請請請請 ( 請 請請請請請請請請 , 100% 請請請請請請請 )

Q3 : 請請請請請請請請請請請請請請

請請請請請請請 16 請請請請

Trang 5

D4 : Identify Root Cause or Potential Cause

Q3: What cause the failure

Answer:

Explanation:

Trang 6

D5 : Permanent Corrective Action Plan

Q1

Q2

Q3

請 D4 請請請請請請請請請

請請請請請請請請請 D4 請請請請請請請請請請請 請請請請請請

Start Date

Finish Date

Trang 7

11/13/19 7

D6 : Prevent Recurrence

Q1

Q2

Q3

D6 請請請請請請請請請請 請請請請請請請請請請請請請請請請請請請請請請請請請請

請請請請請請請請請請請 請 D5 請請請請請請請 ISO 請請請請 DFX , FMEA , PCP , SOP 請請

請請請請請請請請請請 請請請請請請請請請

Trang 8

11/13/19 8

D7 : Verification of Effectiveness

D7 請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請請請請請請請請

請請 請請請請請請請 請請請請請請請 > 2 請請請 100% 請請

請請請請請請請 請請請請請請請請 A4 請請 請請 “ 請請請請請請請 請請請請請 "

Trang 9

D8 : Case Close

Material Cost

Labor Cost

Transportation Cost

Other Cost

Total Poor Quality Lost Amount (RMB): Report By :

This 8D Report is prepared by XXX , approved by Quality Director XXX

It has been sent to Customer SQE XXX on (Date) and wait for customer final approval

8D 請請請請請請請請請請請請請請請請請請請請請請請 請請請請請 請請請請請請請

請請請請請請 請請請請 IE 請請請請 ( 請請 / 請請 / 請請 / 請請請請請請請請請請 )

請 TTI SQE 請請請請請請請請請請請 8D 請請 請請 請請請請

請 8D 請請請請 請 SQE 請請 SQE 請請請請請請請請請請請請請請請請請請

請 TTI SQE 請請請請請請請請請請請請請請 請請 TTI 請請請請請 請請請請

請請請請請請請請請請請請 請請請請請請請請請請請 請請請請請