MIKAZUKI GENERAL METHOD STATEMENT 180517

52 67 0
MIKAZUKI GENERAL METHOD STATEMENT 180517

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

TENDER DOCUMENT TODA MAY 2018 PROJECT : PACKAGE : LOCATION : COFICO Copyright © 2018 MIKAZUKI PROJECT MAIN CONTRACT WORKS WARD HOA HIEP NAM, DISTRICT LIEN CHIEU, DA NANG CITY, VIET NAM MIKAZUKI PROJECT CONTENT PROJECT INFORMATION CONSTRUCTION SITE PLAN HEAVY EQUIPMENT PLAN CONSTRUCTION METHOD STATEMENT HÌNH CONSTUCTION HSE MANAGEMENT MODELPLAN COFICO Copyright © 2018 MIKAZUKI PROJECT INFORMATION PROJECT BUILDING A BETTER FUTURE INFORMATION PROJECT:  LOCATION : WARD HOA HIEP NAM, DISTRICT LIEN CHIEU, DA NANG CITY  SITE AREA : 106,250 m²  TYPE OF PROJECT : AMUSEMENT PARK COFICO Copyright © 2018 MIKAZUKI PROJECT CONSTRUCTION SITE PLAN 2.1 SITE ARRANGEMENT COFICO Copyright © 2018 BUILDING A BETTER FUTURE MIKAZUKI PROJECT CONSTRUCTION SITE PLAN 2.1 BUILDING A BETTER FUTURE SITE ARRANGEMENT SAFETY WAY SITE OFFICE REBAR FABRICATION COFICO Copyright © 2018 TOOLBOX MEETING AREA FORMWORK FABRICATION AREA TOILET FOR WORKER MIKAZUKI PROJECT CONSTRUCTION SITE PLAN 2.2 BUILDING A BETTER FUTURE TRAFFIC MANAGEMENT PLAN TEMPORARY ROAD TEMPORARY ROAD COFICO Copyright © 2018 MIKAZUKI HEAVY EQUIPMENT PLAN 3.1 PROJECT BUILDING A BETTER FUTURE TOWER CRANE LAYOUT PLAN TOWER CRANE (T/C) SPECIFICATION COFICO Copyright © 2018 T/C NAME TYPE CAPACITY T/C #1 PORTAIN MC 175B, R=60m Q = 2.7~8 TON T/C #2 PORTAIN MC 175B, R=60m Q = 2.7~8 TON MIKAZUKI HEAVY EQUIPMENT PLAN 3.2 PROJECT BUILDING A BETTER FUTURE PLACING BOOM LAYOUT PLAN PLACING BOOM SPECIFICATION` COFICO Copyright © 2018 PLACING BOOM NAME TYPE PLACING BOOM #1 R=60m PLACING BOOM #2 R=60m MIKAZUKI HEAVY EQUIPMENT PLAN 3.3 PROJECT BUILDING A BETTER FUTURE HOIST LAYOUT PLAN DESCRIPTION EQUIPMENT TYPE EQUIPMENT NAME CAPACITY COFICO Copyright © 2018 SPECIFICATION TWIN ANKA SC200/200GZ 2.0 TON 10 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.1 PROPOSED CASTING METHOD COFICO Copyright © 2018 BUILDING A BETTER FUTURE CASTING ZONING PLAN FOR FOUNDATION OF HOTEL 38 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.3 BUILDING A BETTER FUTURE FORMWORK METHOD FORMWORK FOR COLUMN, WALL TYPICAL FLOOR COLUMN SQUARE, WALL : ALU FORMWORK CORE WALL : ALU FORMWORK COFICO Copyright © 2018 39 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.3 BUILDING A BETTER FUTURE FORMWORK METHOD STAIRCASE COFICO Copyright © 2018 FORMWORK FOR STAIRCASE TYPICAL FLOOR : ALU FORMWORK 40 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.3 FORMWORK METHOD ROUND COLUMN : STEEL FORMWORK COFICO Copyright © 2018 BUILDING A BETTER FUTURE FORMWORK FOR ROUND COLUMN 41 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.4 SAFETY PROTECTION SYSTEM COFICO Copyright © 2018 BUILDING A BETTER FUTURE 42 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.4 SAFETY PROTECTION SYSTEM COFICO Copyright © 2018 BUILDING A BETTER FUTURE CAPLOCK SCAFFOLDING SYSTEM 43 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.4 SAFETY PROTECTION SYSTEM COFICO Copyright © 2018 BUILDING A BETTER FUTURE FRAME SCAFFOLDING SYSTEM 44 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01   Setting out Site clearance Setting out carried out for brick wall OPENING PROTECTION Copyright COFICO COFICO Copyright © 2018© 2018 02   BRICK WORK Laying 1st brick course Concrete curb to be casted Straight line to be used as control measurement SAFETY RAILING 03    Completion To finish the brick wall To check quality during progress To clean mortar debris or wall PERIMETER SAFETY RAILING 45 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01    Setting out Spacer to be installed base or setting out To chase brick wall following MEP shop drawing To fill mortar install mesh before OPENINGand PROTECTION render COFICO Copyright COFICO Copyright © 2018 © 2018 02   RENDER WORK 03 Rendering To spray water to archive proper humidity To render from top downwards SAFETY RAILING    Inspection To inspect render work following ITP To cure the rendered wall To clean working space after completion PERIMETER SAFETY RAILING 46 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01   Ceiling frame installation To check ceiling level To install ceiling frame according to shop drawing OPENING PROTECTION COFICO Copyright COFICO Copyright © 2018 © 2018 02    CEILING WORK Panel installation To install ceiling panels To check the flat of installed panels To install mesh at panels’ joint SAFETY RAILING 03   Completion To apply skim coat at soffit ceiling along panels’ joint To clean working space after completion PERIMETER SAFETY RAILING 47 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01   Preparation To make rough surface and clean before water proofing application To fill MEP openings, floor drains OPENING PROTECTION COFICO Copyright COFICO Copyright © 2018 © 2018 02   Water proofing application To apply 1st layer of water proofing To apply 2nd layer of water proofing The water proofing layers should be applied for 300mm height ofRAILING brick wall from the SAFETY surface WATER PROOFING WORK 03   Completion Water test in 24 hours To screed as protection layer PERIMETER SAFETY RAILING 48 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01  Preparation To check the required humidity before skim coat application 02   OPENING PROTECTION COFICO Copyright COFICO Copyright © 2018 © 2018 EMULSION PAINT WORK 03 Application To apply 1st and 2nd layer of skim coat appropriately To inspect by lighting SAFETY RAILING   Painting To check the required humidity before painting application To apply primary and final layer of painting PERIMETER SAFETY RAILING 49 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01   Preparation Marking screed level with reference line FFL +1m Provide and check floor level pegs OPENING PROTECTION COFICO Copyright COFICO Copyright © 2018 © 2018 02     Floor screed execution Clean and spray water on surfaces Spread spatter dash coat Spread mix of cement mortar Floor screed using ruler and plaster SAFETYsteel RAILING trowel FLOOR SCREED WORK 03    Curing work Floor screed should be cured for 5-7 days Check hollowness/ eveness Recover gridline for other works PERIMETER SAFETY RAILING 50 MIKAZUKI PROJECT CONSTRUCTION METHOD STATEMENT 4.5 BUILDING A BETTER FUTURE CONSTRUCTION METHOD FOR FINISHING WORKS 01   Preparation To clean the surface before application To identify the starting point of tiling shop drawing OPENING PROTECTION COFICO Copyright COFICO Copyright © 2018 © 2018 02  FLOOR & WALL TILING WORK 03 Starting To start tilling at start point  SAFETY RAILING   Tilling To continue tilling following the started tile To use spacer during tilling process To seal the PERIMETER tiling joints and clean after SAFETY RAILING completion 51 MIKAZUKI HSE MANAGEMENT PLAN 5.1 PROJECT BUILDING A BETTER FUTURE HSE MANAGEMENT PLAN NON TYPICAL ELECTRICAL BOX COFICO Copyright © 2018 HOIST DOOR EXIT WAY 52 MIKAZUKI HSE MANAGEMENT PLAN 5.2 PROJECT BUILDING A BETTER FUTURE SAFETY PROTECTION SYSTEM SAFETY RAILING OPENING PROTECTION COFICO Copyright © 2018 EQUIPMENT, PLAN INSPECTION BROAD SAFETY RAILING SAFETY ROAD PERIMETER SAFETY RAILING

Ngày đăng: 03/11/2019, 08:29

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan