Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 32 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
32
Dung lượng
46,11 MB
Nội dung
Understanding The secret to 150 years of customer benefit The Formwork Experts Understanding What truly matters It is subject matter that counts A tradition of _ Understanding _ Understanding markets _ Understanding construction sites _ Understanding projects _ Understanding the future _ Understanding sustainability _ Understanding construction sectors 10 12 14 16 18 The roots of the business that grew into today’s Doka Group go back 150 years Ever since, there has been one concept we value more than any other: _ Understanding It drives us, it is our passion and our DNA We build on our _ Understanding to create the added value that drives us and our customers to the next level every day A tradition of _ Understanding We are able to look back on a long history of understanding Listening intently, understanding the world as seen through the eyes of our customers, learning to understand all aspects and thinking ahead We are passionate about not being satisfied with the first solution that might get the job done Rather, we continue fine-tuning it until we come up with a true benefit for our customers This is the only way a small woodworking shop could grow into a globally operating formwork company known by the brand name Doka since 1956 Thinking in terms of generations Based on its aim of making everything easier, better and more efficient, the company has continued throughout its history to set new standards in quality, functionality and efficiency around the world Without losing sight of its clear focus on its values in the process For generations the company has been living the values of respectful and apprecia- tive treatment of employees, fair and transparent customer relationships and a particularly well-developed sense of responsibility when it comes to society and the environment We build on a longterm vision, not short-term profits As a family business, we have a strong sense of being connected with our home and the people in the regions Power plant Ybbs-Persenbeug, first use of the name: DOKA "Donaukraftwerk” (Danube Power Plant) Milestones along a history spanning 150 years 1868 1873 "Permit for oper- Bronze medal at ating a carpentry the Vienna World Exhibition business" approved for Stefan Hopferwieser, great-grandfather of the present-day owners 1902 1937 Manufacturing of first "assembly scaffolds for bridge construction" Ing Josef Umdasch marries Mathilde Hopferwieser 1945 Air attacks destroy the new plant that is rebuilt into a factory by family and employees 1956 The first Doka formwork sheets for power plant construction are produced 1958 Doka Austria is founded 1961 "St & A Hopferwieser owned by: J & M Umdasch” is renamed Umdasch KG Owners Hilde Umdasch and Alfred Umdasch Opening of the Umdasch Group’s research and development centre 1961 1968 Foundation of Doka Germany, the first subsidiary outside Austria Set-up of inhouse metalworking operations – a revolutionary step 1990 2002 Acquisition of Foundation of a new research and Conesco in the development cen- US tre in Amstetten 2004 2007 2016 2018 Using Doka formwork technology, the Burj Khalifa, the world’s tallest structure is erected in Dubai EUR 25 million investment into InfoCenter at the Amstetten site By acquiring the Dutch technology specialists B|A|S, Doka makes digitisation part of its business model The Umdasch Group is celebrating its 150-year anniversary Understanding markets Truly understanding a project’s individual challenges requires an understanding of the regional particularities, needs and building methods of our customers’ countries For this reason, we have established over 160 sales and logistics sites in more than 70 countries This way our customers can always be certain of receiving quick and full support for their projects For anything from a simple residential building, a football stadium, a bridge to the world‘s tallest tower This is our global strength on which Doka customers can rely locally Passionate about solutions Few connect the Doka brand with a nearly 150-year family history However, our customers worldwide benefit from the values that have grown from it: reliability, experience and trustworthiness Especially in terms of global competition, our values provide us with a solid foundation for developing and selling high quality formwork solutions From the initial planning through to reliable implementation on site: we help our customers to build even more efficiently, better and safer Take us at our word Ludwig Pekarek Member of Executive Board Doka Group | Production, Engineering, Innovation Harald Ziebula Chairman of Executive Board Doka Group | Sales, Marketing Gerd Pechura Member of Executive Board Doka Group | Finance Continents 70 Countries 160 Locations Perfect formwork solutions Made in Austria Whether for sale or rent, Doka Group products for modular use across generations are exclusively manufactured in Europe Production takes place primarily in the central plant in Amstetten An additional plant is located in St Martin (AT) Production sites are equipped with cutting-edge and highly automated systems, utilising processes in compliance with the most stringent quality and environmental standards Understanding The construction site as a whole We focus not only on products, we focus on construction processes How can our customers achieve more with fewer expenditures? Which detail can be optimised, which formwork service provides cost savings? These are thoughts running through our heads over and over again each day until in cooperation with our customers we developed another innovative solution Understanding construction sites Three things are crucial in tough everyday construction site situations: efficiency, safety and handling – only someone who understands exactly what happens on the construction site knows how to produce better products compatible with one another and to continue their further development This is something we based on our construction site experts and a team of 1,000 engineers Smart products are the foundation for efficiency 10 Understanding construction sectors 18 Competence does not just happen; at Doka, it is created as a result of daily experiences and concrete insights we gain from our customer’s projects and then bundle in our Global Expertise Centers This is how we get the most out of each and every formwork unit In particular, when it comes to highrises, bridges, tunnels, power plants and fairfaced concrete projects Bridge-building expertise Understanding how to bridge obstacles Cycle times shortened by 20% while at the same time saving resources and costs: our bridge experts did a thorough job when developing high-performing Cantilever forming travellers for a project in Bosnia and Herzegovina Project efficiency was significantly increased as a result of the ability to expand construction sections Other references in bridge construction • Shanghai-Nantong Yangtze River Bridge, China • Korabelny cable-stayed bridge, Russia • Schiphol Amsterdam cantilevered bridge, Netherlands • D3 motorway - Svrcinovec-Skalite steel composite bridge, Slovakia • Gerald Desmond Bridge, USA • Tamina Bridge, Switzerland Bouregreg Bridge Rabat, Morocco Type of structure: Pylons and piers Construction work performed by: MBEC-COVEC Architecturally the cable-stayed bridge impresses with the artistic shape of two pylons Structure data • Height: 197 m and 185 m • Length: 952 m • Casting sections: 48 and 45 Products used • Automatic climbing formwork SKE100 • Large-area formwork Top 50 • Climbing formwork MF240 Services • Formwork planning, Formwork instructor Lahntal Bridge Limburg, Germany Type of structure: Girder bridge Construction work by: Max Bögl Stiftung & Co KG Structure data • Height: 62 m • Length: 450 m • Casting sections: 61 • Span: maximum 90 m Products used • Framed formwork Framax Xlife • Automatic climbing formwork Xclimb 60 • Large-area formwork Top 50 Services • Formwork planning, Formwork pre-assembly 20 Corridor Vc, bridges crossing the valleys at Studenčica and Trebižat Čapljina, Bosnia-Herzegovina Type of structure: Bridges, cantilevered construction Construction work by: Hering (OHL sub-contractor) Doka’s high-performing Cantilever forming travellers allow for pouring 5 m segments, thus yielding savings of eight casting sections In the case of a weekly cycle, this means the project is completed eight weeks ahead of time Structure data • Height: 81 m and 59.5 m • Length: 555 m and 365 m Products used • Cantilever forming traveller (CFT) • Large-area formwork Top 50 Transport project German Unity no 8, new railway line between Ebensfeld and Erfurt (VDE 8.1), Viaduct Froschgrundsee, Client DB Netz AG, project management DB ProjektBau GmbH Services • Formwork planning, Formwork instructor Froschgrundsee Viaduct Coburg, Germany Type of structure: Concrete arched bridge Construction work by: Adam Hưrnig Baugesellschaft MS-3 bridge, Ostróda Ostróda, Poland Type of structure: Extradosed bridge Construction work by: Budimex Third bridge over the Orinoco River Caicara del Orinoco, Venezuela Type of structure: Diamond-shaped pylons Construction work by: Odebrecht Structure data • Height: max 65 m • Length: 798 m • Casting sections: 58 Structure data • Length: 677 m • Width: 28.6 m • Casting sections: 74 Structure data • Height: 135.5 m • Length: 11,125 m • Casting sections: 46 Products used • Large-area formwork Top 50 • Climbing formwork MF240 • Cantilever forming traveller (CFT) • Framed formwork Framax Xlife • SL-1 system beam Products used • Climbing formwork MF240 • Load-bearing tower Staxo 100 • Large-area formwork Top 50 • Wall formwork FF20 • Cantilever forming traveller (CFT) Products used • Automatic climbing formwork SKE100 • Large-area formwork Top 50 • Ladder system XS Services • Formwork planning Services • On-site engineering support Services • Engineering, Formwork instructor, onsite engineering support, 3D planning Highrise expertise Understanding how to build high faster Other references in building construction • World Trade Center, New York, USA • GEWA-Tower, Fellbach, Germany • 40 Marsh Wall London, Great Britain • The Exchange 106, Kuala Lumpur, Malaysia • Banco de la Nacion, Lima, Peru • Omkar 1973 Worli, Mumbai, India On construction sites of gigantic dimensions, our specially developed Doka automatic climbing formwork climbs hundreds of metres to the top swiftly Our formwork units were able to demonstrate their climbing skills during construction of what is currently the world‘s tallest tower, the Burj Khalifa in Dubai And also currently the highest upcoming building: the Kingdom Tower, km in height Central Park Tower New York City, USA Type of structure: Residential highrise Construction work by: Pinnacle Industries Torre Isozaki Milan, Italy Type of structure: Highrise (multi-purpose building) Construction work by: Colombo Costruzioni S.p.A Lotte World Tower Seoul, South Korea Type of structure: Highrise (multi-purpose building) Construction work by: Lotte Construction Structure data • Height: 472 m • Number of storeys: 99 • Height of each casting section: 3.9 m Structure data • Height: 202 m • Height of each casting section: 3.9 m • Casting sections: 54 Structure data • Height: 555 m • Height of each casting section: 4.5 m • Casting sections: 123 Products used • Super Climber SCP • Automatic climbing formwork Xclimb 60 • Protection screen Xclimb 60 Xbright with integral loading platforms • Table lifting system TLS • Large-area formwork Top 50 • Framed formwork Frami Xlife Products used • Automatic climbing formwork SKE100 plus • Protection screen Xclimb 60 • Large-area formwork Top 50 Products used • Automatic climbing formwork SKE plus and Xclimb 60 • Protection screen Xclimb 60 • Large-area formwork Top 50 Services Formwork planning, Utilisation plans, Formwork pre-assembly on site, Formwork instructor Services • Formwork planning, Formwork pre-assembly on site, Formwork instructor Services • Formwork planning, Formwork pre-assembly, Formwork instructor 22 Istanbul Marina Istanbul, Turkey Type of structure: Residential and office building Construction work by: DAP Yapi Insaat The different geometries and unique views characterise the individual buildings Doka deployed the Protection screen Xclimb 60 to ensure safe and speedy progress on the build Structure data • Height: 145 m • Number of storeys: 38 • Height of each casting section: 3.3 m Products used • Protection screen Xclimb 60 Services • Technical planning, Formwork instructor Burj Khalifa Dubai, United Arab Emirates Type of structure: Highrise (multi-purpose building) Construction work by: Joint Venture between Samsung, Besix, Arabtec Doka formwork was used in Dubai to help construct the world’s tallest building Doka supplied the formwork solution for the entire structure core Inspired by an Arabian desert flower, the shape of the tower meant that the formwork needed to be highly adaptable In addition, the extremely tight construction schedule necessitated an ingenious utilisation plan Structure data • Height: 830 m • Height of each casting section: 3.7 m • Number of storeys: 160 • Casting sections: 180 Products used • Automatic climbing formwork SKE100 • Protection screen Xclimb 60 • Large-area formwork Top 50 • Stair tower 250 Services • Formwork planning and coordination, Site logistics, Formwork pre-assembly on site, Formwork instructor Tunnel-building expertise Understanding how to break through Other references in tunnel construction • Lưtschberg Base Tunnel, Switzerland • M4 metro line – Rákóczi tér, Budapest, Hungary • Brenner Base Tunnel, Austria • S10 Highway through Mühlviertel, Austria • Imberg Tunnel, Germany • E39 Eiganes Tunnel, Norway Over a 2-year span of intensive development work, our experts put their hearts and souls into designing a statically optimised load system that allows for elimination of shoring frames For the utmost in certainty of time, costs and quality in tunnel construction This is how the new forming wagon surprised right from its first deployment Gotthard Base Tunnel Erstfeld, Switzerland Type of structure: Mining-type tunnel Construction work by: ARGE AGN The 7,400 m long Erstfeld contract section is the northern-most part of the Gotthard Base Tunnel It also includes construction of two 400 m long underground branch-off s built using the drill-and-blast method followed by CIP concrete lining Doka chose all-hydraulic forming for this complex cross-section Structure data Floor (segmented) • Cross-section: round • Clear width: 17.65 m • Clear height: 10.4 m Wall (segmented) • Clear height: 5.65 m • Formed length of tunnel: 370 m • Length of each casting section: 10 m • Casting sections: 37 Products used • Heavy-duty supporting system SL-1 • Large-area formwork Top 50 Services • Formwork planning, Formwork instructor, Pre-assembly Service, Utilisation plans, Verifiable structural analysis 24 Südgürtel Graz Graz, Austria Type of structure: Cut-and-cover contruction tunnel Construction work by: ARGE Südgürtel Graz / Teerag-Asdag / Granit / Porr With the concrete monitoring system Concremote and the Tunnel system DokaCC, a 5-day cycle was maintained on this build Structure data • Length: 2000 m, of which 1442 m underground • Width: 26 m to 40 m • Earthworks 500,000 m³ excavated • Reinforcement: 10,000 t • Concrete 100,000 m3 Products used • Tunnel formwork traveller DokaCC • Heavy-duty supporting system SL-1 • Wall formwork FF20 • Working scaffold Modul • Staxo 100 • Stair tower Services • Pre-assembly Service, Formwork instructor, Concremote concrete monitoring Second Midtown Tunnel Norfolk and Portsmouth VA, USA Type of structure: immersed tunnel Construction work by: ARGE SkanskaKiewit-Weeks City Tunnel, Leipzig Leipzig, Germany Type of structure: Cut-and-cover construction tunnel Construction work performed by: ARGE Leipzig City Tunnel Central Hidroélectrica Angostura Los Angeles, Chile Type of structure: Mining-type tunnel Construction work performed by: Empresa Constructora Angostura Ltda Structure data Floor (arched) • Clear width: 10.97 m • Clear height: 6.55 m • Length of tunnel: 1,130 m • Length of each casting section: 22 m • Casting sections: 55 Structure data • Cross-section: rectangular • Clear width: m • Clear height: 6.8 m • Formed length of tunnel: 320 m • Length of each casting section: 10 m • Casting sections: 32 Products used • Heavy-duty supporting system SL-1 • Large-area formwork Top 50 Products used • Heavy-duty supporting system SL-1 • Wall formwork FF20 Structure data Wall (partially monolithic) • Cross-section: round • Clear width: 10.75 m • Clear height: 10.75 m • Formed length of tunnel: 168 m • Length of each casting section: 10 m • Casting sections: 18 Services • Formwork planning, Formwork pre-assembly, Formwork instructor, Verifiable structural analysis Products used • Heavy-duty supporting system SL-1 • Large-area formwork Top 50 • Ladder system XS • Handrail post Services • Utilisation plans, Formwork instructor Power-station construction expertise Understanding how to go at full steam Other references in power plant construction • Muskrat Falls, Labrador, Canada • Castrovido Dam, Spain • Offshore Windpark Thornton Bank, Belgium • Nant de Drance, Valais, Switzerland • LNG-Tank Map Ta Phut, Thailand • Xayaburi Hydroelectric Power Project, Laos • Poplar Pumping Station, Washington D.C., USA Block heights up to metres are a cinch for our dam formwork Feasibility of higher casting sections ensures rapid construction progress – even in adverse weather conditions Whether at minus 15 degrees in Norway or an average of 30 degrees in Thailand Sohlstufe Lehen Power Station Salzburg, Austria Type of structure: Hydropower station Construction work by: ARGE Kraftwerk Lehen: G Hinteregger & Söhne / Porr / Teerag-Asdag Structure data • Drop height: 6.6 m Products used • Wall formwork FF20 • Large-area formwork Top 50 • Load-bearing tower Staxo 100 • Special platforms Services • Pre-assembly Service Keeyask Manitoba Manitoba, Canada Type of structure: Hydropower station Construction work by: BBE Hydro Constructors LP Structure data • Capacity: 695 megawatts • Formwork used: more than 28,000 m2 Products used • Dam formwork D22 • Large-area formwork Top 50S • Load-bearing tower Staxo 100 • Framed formwork Framax S Xlife Services • Formwork planning, Formwork instructor, Pre-assembly 26 Dam Sarvsfossen Bykle (Aust-Agder province), Norway Type of structure: Dam/concrete arch dam Construction work by: Kruse Smith Construction of this concrete arch marks the first time Doka’s Dam formwork D35 was put to use in the field The success of this premiere was ensured by the standard system that includes casting sections m high as well as an integrated safety and logistics concept Structure data • Height: 50 m • Length: 150 m • Height of each casting section: m • Casting sections: 10 Products used • Dam formwork D35 • Large-area formwork Top 50 Services • Formwork planning, Formwork instructor Cooling tower for coal-fired power plant Krishnapatnam, India Type of structure: Cooling tower Construction work by: Tata Projects Ltd Aulepa Wind Park Aulepa, Estonia Type of structure: Wind turbines Construction work by: Skanska Freeport LNG Tanks Texas, USA Type of structure: LNG tank Construction work by: Joint Venture of Technip – Zachry – Saipem Structure data • Height: 172.5 m • Diameter: 132.1 m to 76.4 m • Height of each casting section: 1.5 m • Casting sections: 113 Structure data • Height: 36.5 m • Height of each casting section: 4.1 m • Casting sections: Structure data • Height: 37 m • Height of each casting section: 4.4 m • Casting sections: Products used • Doka wind-turbine formwork Products used • Climbing formwork MF240 • Large-area formwork Top 50 Products used • Cooling-tower formwork SK175 Services • Formwork planning, Formwork instructor Services • Utilisation plans, Formwork planning, Formwork instructor Services • Pre-assembly Service Fair-faced concrete construction expertise Understanding how to realise exceptional ideas – together The extraordinarily stable Doka Xface formwork sheet with fibre-reinforced synthetic resin coating was developed in order to set a new standard for fair-faced concrete: a particularly even surface result without loss of coating colour For realising exceptional ideas and more complex shapes with the ability to select customised surfaces and therefore even more room to play for architects Other references in fair-faced concrete • New Port House, Antwerp, Belgium • Calgary New Central Library, Canada • The Tides Warsaw, Poland • KTM Museum Mattighofen, Austria • Rabat Ring Road expressway, Morocco Red Rock National Conservation Area Las Vegas, USA Type of structure: Cultural edifice Construction work by: Armada Construction Architect: Line and Space Architects AB Dock, Prague Prague, Czech Republic Type of structure: Office and residential building Construction work by: Monolity-Bau s.r.o Architect: Schindler Seko architekti, spol s.r.o Structure data Wall (fair-faced concrete) • Height: up to 5.8 m Structure data Slab/columns (fair-faced concrete) Products used • Large-area formwork Top 50 with profiled timber formers • Form-ply: film-coated multi-ply formwork sheet Services • Utilisation plans, project support Special feature • Red dyed fair-faced concrete Products used • Wall formwork Framax Xlife • Column formwork KS • Timber-beam floor formwork Dokaflex • Load-bearing tower Staxo 40 • Floor prop Eurex 60 Services • Technical service in the field, use of myDoka Special feature • Monolithic structure • Complicated, W-shaped columns 28 Phaeno Science Centre Wolfsburg, Germany Type of structure: Museum Construction work by: E Heitkamp Architect: Zaha Hadid Ltd & Mayer Bährle Freie Architekten BDA Structure data Pillar/column (conical) • Height: 16 m Products used • Large-area formwork Top 50 • Framed formwork Framax Xlife • Column formwork RS • Face sheet: Tongue-and-groove boards formwork Services • 3D planning Special feature • Self-compacting concrete (SCC), structure geometry Hotel am Domplatz Linz, Austria Type of structure: Hotel Construction work by: Strabag AG Architect: Hohensinn Architektur, Graz Structure data Pillar/column • Height: 26 m • Height of each casting section: 3.3 m Drop beam • Height of each casting section: 0.64 m • Storeys: Products used • Framed formwork Framax Xlife • Face sheet: Dokaplex formwork sheet Services • Utilisation plans Special feature • Building inclines in two directions; facade consists of columns and drop beams only, exterior walls in cast-in-place concrete with no visible form-ties Understanding What the future holds 30 Regardless of the direction in which the world of construction develops, you can count on Doka to remain curious and continue to seek innovative solutions to ensure our customers are able to build at the highest levels of quality, functionality and efficiency – tomorrow and in the days ahead linkedin.com/company/doka youtube.com/doka Doka GmbH | Josef Umdasch Platz | 3300 Amstetten | Austria | T +43 7472 605-0 | F +43 7472 64430 | info@doka.com | www.doka.com Art.-Nr 931114002 // 09/2017 en-GB facebook.com/dokacom ... such as DokaShape for complex construction geometries • Column formwork • Single-sided formwork Doka Floor Systems • Tableforms such as Dokamatic and Doka ex tables • Panel floor formwork Dokadek... Executive Board Doka Group | Production, Engineering, Innovation Harald Ziebula Chairman of Executive Board Doka Group | Sales, Marketing Gerd Pechura Member of Executive Board Doka Group | Finance... Doka ex tables • Panel floor formwork Dokadek 30 • Timber-beam floor formwork such as Doka ex 30 tec and Doka ex Doka Climbing Systems • Automatic climbing formwork such as Platform SCP, SKE plus