Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 37 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
37
Dung lượng
1,23 MB
Nội dung
ABB Oy PSS/SAS RTU560 Revision: Cities ABB Oy RTU560StepByStep 1-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Contents: INTRODUCTION INSTALLATION EXCEL IMPORT 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 4.7 PRECONDITION EDIT THE EXCEL FILE EDIT THE PATTERN FILE START EXCEL IMPORT 14 BUILD RTU FILES 22 RTU560 WEB SERVER 27 PRECONDITION 27 ESTABLISH PPP- CONNECTION 27 START INTERNET EXPLORER WITH ADDRESS HTTP//10.0.10.50 29 LOAD CONFIG.IOD (I/O DATA) 30 LOAD CONFIG.GCD (GENERAL CONFIGURATION DATA) 32 LOAD CONFIG.IOD (TEXTS FROM ARCHIV OR PRINTER) 34 RESTART RTU560 36 ABB Oy 2-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Introduction This brief description does not replace the standard 560RTUtil NT User’s Guide and RTU560 Web Servers User’s Guide” For details please refer to the manuals mentioned This description is made to show, how to change or add an item to an existing configuration in the RTU, in case the user has not been working with the tool for a while, or to help a newcomer to get easily started with the 560RTUtil NT This brief description handles: • • Installation The description for this installation procedure is complete different from the installation procedure described in the Users’Guide This way of installation is mainly based on field experience Excel import This Excel import procedure shows each step that has to be done if a change the RTU configuration is required The precondition is, that this steps have been carried out before This is the standard case when the RTU is delivered from the factory with the appropriate configuration files and the customer make changes for example during commissioning This guide advises you to keep the actual files which are in use in the RTU as backup If everything goes wrong during Excel-import, you will still have the healthy GCD, IOD and PTX file which can be loaded to the RTU This steps seem more complicate as they really are It is a matter of practice The main goal for Excel import is, if you have a large amaount of I/O’s or IDE’s The Excel-import helps to keep track of the parameters used in the RTU The output of this Excel-import chapter are the RTU-Files The GCD-, IOD- and the PTX File will be loaded to the CPU with the WEB Server Tool ABB Oy 3-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Installation RTUtil NT is distributed as CD-ROM and is developed for the Windows NT 4.0 operating system Copy the packed file ”RTUtilNT_xx_xx_xxx_00.exe” into a directory with the release name Wbtr xxx and unpack the file into the same directory This will create the sub-directory Disk1 with additional subdirectories as shown below Keep this directory for future use, for example when you have to re-install the RTUtil NT Double-click Setup.exe in the directory Disk1 The installation Process guides you through the installation process ABB Oy 4-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Follow the steps from the installation program and click through the following dialog sheets: Acknowledge welcome page Accept license agreements Select the program path, where the files should be installed Select the program group of RTUtil NT Restart your computer If you are working with different RTUtil NT releases as in the picture above, create your ”Release specific directory” and name it accordingly Keep your projects in the appropriate release directories If upgrade is required to the next higher release, please ask your supplier for support If you currently are working with release and you need to edit a project made with release 5, just re-install RTUtil NT release over the already existing directory from release This will not affect the project files, but will set registry to keep track of internal paths ABB Oy 5-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Excel import 3.1 Precondition RTUtil NT is installed and at least the Pattern and the Excel file(s) exist in the appropriate directory The Pattern file contains: • Complete Network Tree (Including all links to the Hardware Tree) • The Hardware Tree down to RTU560 board level (Without I/O signal definitions and assignments The Excel file(s) contains: • Project Signal Tree (Signal names structured according to the project settings of the project pattern) • The data object’s hardware assignment to RTU I/O points • Data object parameters and addresses The Pattern file and the Excel sheet will be merged into the RTU File! 3.2 Edit the Excel file Open directory ”xls_import” under your current release ant open your project directory ABB Oy 6-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Make a copy of the ”ACTIVE xls” file, change the date and remove the ACTIVE from the old version to keep track of history Open the Excel file and select the sheet in question For example change input range from 20 mA to mA Save the changes and close the file ABB Oy 7-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep 3.3 Edit the Pattern file Open directory ”pattern” under your current release and open your project directory Make a copy of the ”ACTIVE TU” file, change the date and remove the ACTIVE from the old version to keep track of history ABB Oy 8-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Start RTUtil from your work-directory or create a shortcut on your desktop or Start RTUtil via Windows ”Start / Programs / RTUtil NT/ RTUtil NT ABB Oy 9-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep RTUtil NT workspace offers to setup a new project As we are editing an already existing Project press Cancel! Select ”Open” (existing pattern) ABB Oy 10-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Select your project directory! Name the RTU file for example RTU name & build date This name can be seen on the CPU after down loading Continue with Select! Check that the path and filename of the RTU file is correct! Continue with Next! ABB Oy 23-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep RTUtil NT prompts for Plausibility Check Continue with Plausibility Ensure there are no Errors, Warnings or Information’s This requires that the RTU configuration is build in a way that no plausibility messages is generated Continue with Generate File! During RTU File generation a DOS window can be noticed ABB Oy 24-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Finally RTUtil NT reports ”RTU files are generated” Continue with ”OK” The window will close ABB Oy 25-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Close the session with ”File” and ”Exit” Check the generated files in the directory “rtufile” ABB Oy 26-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStepRTU560 Web Server 4.1 Precondition Refer to manual “User’s Guide to RTU560 Web Server Installation and Configuration Release” • Chapter: PPP Installation and RAS Configuration • Chapter: Establish PPP-Connection 4.2 Establish PPP- Connection Establish PPP-Connection Continue with Dial No passwort is required Continue with OK Connection is establishing… Field is flashing due to active link Connected to: PPP Line speed: 38 400 bps ABB Oy 27-37 ABB Oy PSS/SAS RTU560 Revision: Cities ABB Oy RTU560StepByStep 28-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep 4.3 Start Internet Explorer with address http//10.0.10.50 You will get the basic picture with the menu list on the left hand side Choose Configuration Enter User Name and Password and accept with OK ABB Oy 29-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep 4.4 Load config.iod (I/O Data) “Load the basic Configuration files to the RTU” window appears Continue with Browse Browse for the config.iod file in your project rtufile directory and select Open ABB Oy 30-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Check for correct selected file And continue with Load RTU Uploading takes from aprox to minutes depending of the size of configuration ABB Oy 31-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep File succsessfully transferred! Continue with Configuration 4.5 Load config.gcd (General Configuration Data) Browse for the config.gcd file in your project rtufile directory and select Open ABB Oy 32-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Check for correct selected file And continue with Load RTU Uploading takes only a few seconds depending of the size of configuration ABB Oy 33-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep File succsessfully transferred! Continue with Configuration 4.6 Load config.iod (Texts from Archiv or Printer) Browse for the config.ptx file in your project rtufile directory and select Open ABB Oy 34-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Check for correct selected file And continue with Load RTU Uploading takes only a few seconds depending of the size of configuration ABB Oy 35-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep File succsessfully transferred! Continue with Configuration 4.7 Restart RTU560 Reset RTU to activate the new configuration files Continue with Reset ABB Oy 36-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560StepByStep Connection lost due to restart of RTU Establish the web Server connection again and check the System Diagnostic for possible errors Check the new functionality of the RTU560 and make also spot checks of the old functionality ABB Oy 37-37 ... speed: 38 400 bps ABB Oy 27-37 ABB Oy PSS/SAS RTU560 Revision: Cities ABB Oy RTU560 Step By Step 28-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560 Step By Step 4.3 Start Internet Explorer with address... RTU560 Step By Step Close the session with ”File” and ”Exit” Check the generated files in the directory “rtufile” ABB Oy 26-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560 Step By Step RTU560. .. PSS/SAS RTU560 Revision: Cities RTU560 Step By Step Check that your project file does contain the imported signals in the ”View Hardware Tree” ABB Oy 21-37 ABB Oy PSS/SAS RTU560 Revision: Cities RTU560