Slides calculate total cost and incremental costs

50 219 1
Slides calculate total cost and incremental costs

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Calculate Total Cost And Incremental Costs Principles of Cost Analysis and Management © Dale R Geiger 2011 What if? • Relationship between cost and unit of output is neither fixed nor variable? • There are multiple elements that affect the cost of an output? • A different type of cost relationship is relevant to the decision at hand? © Dale R Geiger 2011 Terminal Learning Objective • Task: Calculate Total Cost And Incremental Costs Given Various Production Volumes • Condition: You are a cost advisor technician with access to all regulations/course handouts, and awareness of Operational Environment (OE)/Contemporary Operational Environment (COE) • Standard: With at least 80% accuracy: • • • • Describe multivariate (mixed) and incremental costs Express total multivariate cost in an equation Graph total multivariate cost over a relevant range Express incremental cost in an equation â Dale R Geiger 2011 Cost Definitions Mixed Costs - A combination of fixed and variable costs Total Cost = Variable Cost + Fixed Cost • Also known as multivariate costs © Dale R Geiger 2011 Multivariate Cost Expressions • Variable component: • Variable $Cost per Unit * # Units -Plus• Fixed component: • Sum of relevant costs that remain the same regardless of units of output © Dale R Geiger 2011 Multivariate Cost Example • Relevant cost of transporting a unit for onlocation training is $350,000 • Cost of training operations on-location runs $20,000 per day • What is the unit of output? • Days of training © Dale R Geiger 2011 Multivariate Cost Example • Relevant cost of transporting a unit for onlocation training is $350,000 • Cost of training operations on-location runs $20,000 per day • What is the unit of output? Days of training â Dale R Geiger 2011 Multivariate Cost Example • Relevant cost of transporting a unit for onlocation training is $350,000 • Cost of training operations on-location runs $20,000 per day • What is the cost expression for Fixed cost? • Fixed cost = $350,000 © Dale R Geiger 2011 Multivariate Cost Example • Relevant cost of transporting a unit for onlocation training is $350,000 • Cost of training operations on-location runs $20,000 per day • What is the cost expression for Fixed cost? • Fixed cost = $350,000 © Dale R Geiger 2011 Multivariate Cost Example • Relevant cost of transporting a unit for onlocation training is $350,000 • Cost of training operations on-location runs $20,000 per day • What is the cost expression for Variable Cost? • Variable cost = $20,000/day * # of days © Dale R Geiger 2011 10 Incremental Cost Example • Our airline provides a $.50 bag of peanuts and a $.75 can of soda to each passenger • Additional fuel cost per passenger is $8.75 • What is the Incremental cost of increasing from 125 to 126 passengers? • Incremental cost = Cost of 126 psgrs – Cost of 125 psgrs ($10 * 126 + $15,000) - ($10 * 125 + $15,000) = $10 © Dale R Geiger 2011 36 Incremental Cost Example • Our airline provides a $.50 bag of peanuts and a $.75 can of soda to each passenger • Additional fuel cost per passenger is $8.75 • What is the Incremental cost of increasing from 125 to 126 passengers? • Incremental cost = Cost of 126 psgrs – Cost of 125 psgrs ($10 * 126 + $15,000) - ($10 * 125 + $15,000) = $10 37 © Dale R Geiger 2011 Graph Airline Flight Cost $K 16.50 16.45 16.40 16.35 Incremental cost = $16,260 – $16,250 = 10 Total Cost at 125 passengers = 125 * $10 per passenger + $15,000 = $16,250 16.30 16.25 16.20 16.15 Total Cost at 126 passengers = 126 * $10 per passenger + $15,000 = $16,260 16.10 16.05 16.00 X Axis = Number of passengers As number of passengers increases, Total Cost increases © Dale R Geiger 2011 38 Incremental Cost Example • Our airline provides a $.50 bag of peanuts and a $.75 can of soda to each passenger • Additional fuel cost per passenger is $8.75 • What is the Incremental cost of increasing from 150 to 151 passengers? • Incremental cost = Cost of 151 psgrs – Cost of 150 psgrs ($10 * 151 + $30,000) - ($10 * 150 + $15,000) = $15,010 © Dale R Geiger 2011 39 Incremental Cost Example • Our airline provides a $.50 bag of peanuts and a $.75 can of soda to each passenger • Additional fuel cost per passenger is $8.75 • What is the Incremental cost of increasing from 150 to 151 passengers? • Incremental cost = Cost of 151 psgrs – Cost of 150 psgrs ($10 * 151 + $30,000) - ($10 * 150 + $15,000) = $15,010 © Dale R Geiger 2011 40 Graph Airline Flight Cost $K 33.00 Incremental cost = $16,500 – $31,510 = $15,010 31.00 29.00 Total Cost at 151 psgrs = 151 * $10 per psgr + $30,000 Or $31,510 27.00 25.00 23.00 21.00 19.00 Total Cost at 150 psgrs = 150 * $10 per psgr+ $15,000 Or $16,500 17.00 15.00 X Axis = Number of passengers As number of passengers increases, Total Cost increases © Dale R Geiger 2011 41 Check on Learning • What is the generic cost expression for incremental cost? • If the relevant range for fixed cost is not exceeded, incremental cost is equal to © Dale R Geiger 2011 42 Other Multivariate Cost Expressions • Some cost expressions consist of multiple components • Example: Cell phone plan Base plan $35 for 500 minutes Additional minutes $.25 per minute Data plan $10 for 200 MB Additional MB of data $.50 per MB © Dale R Geiger 2011 43 Cell Phone Plan Example Base plan $35 for 500 minutes Additional minutes $.25 per minute Data plan $10 for 200 MB Additional MB of data $.50 per MB • What is the cost expression? • Base plan $35 + $.25/min * additional minutes + data plan $10 + $.50/MB * additional MB © Dale R Geiger 2011 44 Cell Phone Plan Example Base plan $35 for 500 minutes Additional minutes $.25 per minute Data plan $10 for 200 MB Additional MB of data $.50 per MB • What is the cost expression? Base plan $35 + ($.25 per * add’l mins) + data plan $10 + ($.50 per MB * add’l MB) © Dale R Geiger 2011 45 Cell Phone Plan Example Base plan $35 for 500 minutes Additional minutes $.25 per minute Data plan $10 for 200 MB Additional MB of data $.50 per MB • What is the cost if 400 minutes and 250 MB are used? $35 + ($.25/min * additional minutes) + $10 + ($.50/MB * 50 additional MB) © Dale R Geiger 2011 46 Cell Phone Plan Example Base plan $35 for 500 minutes Additional minutes $.25 per minute Data plan $10 for 200 MB Additional MB of data $.50 per MB • What is the cost if 400 minutes and 250 MB are used? $35 + ($.25 per * additional minutes) + $10 + ($.50 per MB * 50 additional MB) = $70 © Dale R Geiger 2011 47 Graph of Cell Phone Cost $100 $90 $80 $70 $60 $50 $40 $30 $20 $10 $0 25 $10 $25 $35 50 M / in 00 m B $10 $10 $35 $35 00 M / 0 B 00 M / in 00 m © Dale R Geiger 2011 Add'l MB Data Plan Add'l minutes Base Plan B 48 Check on Learning • You are planning a one-week vacation for you and your significant other How would you define the cost expression for the trip? © Dale R Geiger 2011 49 Practical Exercises © Dale R Geiger 2011 50 ... Definitions • Mixed Costs - A combination of fixed and variable costs Total Cost = Variable Cost + Fixed Cost • Also known as multivariate costs © Dale R Geiger 2011 Multivariate Cost Expressions... the cost expression for Total Cost of on-location training? • Total Cost = Variable cost + Fixed Cost • Total Cost = $20,000 per day * #days + $350,000 © Dale R Geiger 2011 13 Graph of Mixed Cost. .. the decision at hand? © Dale R Geiger 2011 Terminal Learning Objective • Task: Calculate Total Cost And Incremental Costs Given Various Production Volumes • Condition: You are a cost advisor technician

Ngày đăng: 09/01/2018, 12:23

Từ khóa liên quan

Mục lục

  • Slide 1

  • What if?

  • Terminal Learning Objective

  • Cost Definitions

  • Multivariate Cost Expressions

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Multivariate Cost Example

  • Graph of Mixed Cost

  • Graph of Mixed Cost

  • Graph of Mixed Cost

  • Questions

  • Cost Definitions

  • Semi-Variable Cost Example

  • Cost Expression for Semi Variable

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan