1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Korea experience(gangwon) v170607

92 221 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 92
Dung lượng 6,76 MB

Nội dung

Up-Scaling of Wind Power in Vietnam Experiences from the Region – Example South Korea Case Study – Gangwon Wind Farm Energy Demand by Regions Up-Scaling of Wind Power in Viet Nam Energy Growth Rates by Region Up-Scaling of Wind Power in Viet Nam Energy Status in Korea Total Energy vs Renewable Energy Consumption Total (T Toe) Renewable (T Toe) 250,000 Total 12,000 Renewable 10,000 200,000 8,000 150,000 6,000 100,000 4,000 50,000 - 2,000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 - Year (Source: Korea Energy Economic Institute) Up-Scaling of Wind Power in Viet Nam Energy Status in Korea WTG Installed Status (1999 ~ 2015) Yearly Installed (MW) Accumulated Installed (MW) 900 Yearly Installed 225 Accumulated Installed 800 200 700 175 600 150 500 125 400 100 300 75 200 50 100 25 ~ 99 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Year (Source: Korea Wind Energy Industry Association) Up-Scaling of Wind Power in Viet Nam Energy Status in Korea WTG Installed Status (Plan vs Actual from 2003 ~ 2012) Installed Capacity (MW) 600 Plan Actual 500 400 300 200 100 Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 (Source: MOTIE for Plan and Korea Wind Energy Industry Association for Actual) Up-Scaling of Wind Power in Viet Nam Energy Status in Korea WTG Installation Plan (2016 ~ 2029) Yearly Installed (MW) Accumulated Installed (MW) 9,000 Yearly Installed 8,000 Accumulated Installed 7,000 6,000 5,000 4,000 3,000 2,000 1,000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 900 850 800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 Year (Source: MOTIE) Up-Scaling of Wind Power in Viet Nam New & Renewable Energy Policy in Korea The 4th Basic Plan for New & Renewable Energy To reach 11% of total energy supply by 2035 Year (Unit: %) 2012 2014 2025 2035 Solar Thermal 0.3 0.5 3.7 7.9 Photovoltaic 2.7 4.9 12.9 14.1 Wind 2.2 2.6 15.6 18.2 Bio 15.2 13.3 19.0 18.0 Small Hydro 9.3 9.7 4.1 2.9 Geothermal 0.7 0.9 4.4 8.5 Ocean 1.1 1.1 1.6 1.3 Waste 68.4 67.0 38.8 29.2 Total Target 3.2 3.6 7.7 11.0 (Source: MOTIE) Up-Scaling of Wind Power in Viet Nam New & Renewable Energy Policy in Korea History of RE Policy 1987/12 Promulgation of Promotion Act for NRE Sources 2001/02 10-year R&D Basic Plan for NRE (concentration on wind, PV, and fuel cell) 1997/01 1997/12 2002/03 2002/05 2002/08 2003/10 2004 2006/10 10-year National Plan for Energy Technology Development Amendment of the 1987 Promotion Act (incl Dissemination) (1997~2006) Amendment of the 1997 Promotion Act (feed-in law) Announcement of tariffs under the feed-in law, fixed for years (FIT for wind: 107.66 KRW) 2nd National Energy Plan (2002~2012, target 5% by 2011, development of Korean WTG technology) Extension of fixed tariff period to 15 years for PV and wind Amendment of the 2002 Promotion Act (standardizations) Revision of feed-in tariffs for new projects (FIT for wind: 107.29 KRW, 2% decrease per year from 2009/10) Up-Scaling of Wind Power in Viet Nam New & Renewable Energy Policy in Korea Recent Developments of RE Policy 2010/03 Decision for Replacement of FITs by a Renewable Portfolio Standard (RPS) 2013/01 End of FIT program and change into RPS as of December 31, 2012 (with a little reduced targets, i.e 2% by 2015 and 8% by 2022) 2013 So far there was no Offshore-Wind FIT, but from 2013 under the new RPS from 2012: power utilities with more than 500MW generation, to generate 4% of energy from RE by 2015, increasing 10% by 2022 scheme offshore wind energy receives a credit factor 2, which is double than for onshore wind Up-Scaling of Wind Power in Viet Nam 10 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 78 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 79 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 80 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 81 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 82 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 83 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 84 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 85 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 86 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 87 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 88 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 89 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 90 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 91 Case Study – Gangwon Wind Farm in Korea Up-Scaling of Wind Power in Viet Nam 92 ... establishment of the basic plan for supply-demand 3) Korea Energy Agency (renamed from Korea Energy Management Corporation): Korea Energy Agency is, one of Korean government owned company, efficient implementation... Viet Nam 21 New & Renewable Energy Policy in Korea Related Authority, Agency and Institute 1) Korea Energy Economic Institute (KEEI): KEEI who is one of Korean government owned research institute,... economy 2) Korea Wind Energy Industry Association (KWEIA) :The main role of KWEIA is information exchange and cooperate among relevant companies for Korea wind energy industry 3) Korea Institute

Ngày đăng: 15/10/2017, 08:49

TỪ KHÓA LIÊN QUAN