Additional information Parrot Field Well data Overview on s(mula(on candidates Before S(mula(on Flow Rate, bbl/day Pressure, bar K‐401 No flow 27 drop to 10 K‐397 1350 13 K‐395 ‐ 13 K‐403 1870 then stopped 17 drop to 13 K‐394 860 11 K‐390 No flow 2 K‐284 No flow 35 drop to 12 K‐381 ‐ 12 K‐398 No flow 1 Some logging information Typical well completion Pumping Schedule with Average Rates Stage Average Coverage (gal/Μ) Volume (m³) Fluid Name Avg Pump Rate* (m³/min) Visc at 511/s (cp) Pump Time (min) Diesel 1.59 7.0 0.078 1.349 20.38 20% HCl 6.36 26.0 0.078 0.731 81.79 15% HCl + 2% VESD 2.38 10.0 0.386 39.239 6.18 20% HCl 6.36 26.0 0.400** 0.731 15.90 10.0 0.400** 39.239 5.96 26.0 0.400** 0.731 15.90 5.56 23.0 0.400** 1.349 13.91 0.00 0.0 47.70 193.0 0.400** 0.731 119.24 0.357 1.349 26.73 15% HCl + 2% VESD 20% HCl Diesel 20% HCl 2.38 6.36 Displacement Diesel 9.54 Totals: 88.24 305.99 Acid Treatment Ð Actual pumping schedule Job results Overview on s(mula(on Results Before S(mula(on AΒer S(mula(on Flow Rate, bbl/day Pressure, bar Flow Rate, bbl/day 2600 (32/64’’) 2089 (18%) 3100 (48/64’’) 2600, 2350, 1700 (48, 32, 20/64’’) 2100, 1900 (48, 32/64’’) Gas flow, 1000, 700 (20, 16/64’’) 2440,1700 (48, 32/64’’) 2100 (32/64’’) GOR, Scf/bbl K‐401 No flow 27 drop to 10 K‐397 1350 13 K‐395 ‐ 13 K‐403 1870 then stopped 17 drop to 13 K‐394 860 11 K‐390 No flow 2 K‐284 No flow 35 drop to 12 K‐381 ‐ 12 2450 (32/64’’) 382 24 (PD = 18 psi) (PI = 136psi/bbl/day) K‐398 No flow 1 2420, 1700 (48, 32/64’’) 336 29 (PD = 88 psi) (PI = 18psi/bbl/day) 270 285 270 280 1000 150 336 Pressure, bar 24 (PD = 55 psi) (PI = 48psi/bbl/day) 24 (PD = 55 psi) (PI = 48psi/bbl/day) 24 (PD = 22 psi) (PI = 105psi/bbl/day) 22 (PD = 127 psi) (PI = 14psi/bbl/day) 65.5 20 (PD =108 psi) (PI = 18psi/bbl/day) 21 (PD = 73 psi) (PI = 41psi/bbl/day) ... (PI = 136psi/bbl /day) K‐398 No flow 1 24 20, 1700 (48, 32/ 64’’) 336 29 (PD = 88 psi) (PI = 18psi/bbl /day) 27 0 2 85 27 0 28 0 1000 150 336 Pressure, bar 24 (PD = 55 psi) (PI = 48psi/bbl /day) 24 (PD = 55 psi) ... (PI = 48psi/bbl /day) 24 (PD = 55 psi) (PI = 48psi/bbl /day) 24 (PD = 22 psi) (PI = 105psi/bbl /day) 22 (PD = 127 psi) (PI = 14psi/bbl /day) 65. 5 20 (PD =108 psi) (PI = 18psi/bbl /day) 21 (PD = 73 psi) ... bbl /day 26 00 ( 32/ 64’’) 20 89 (18%) 3100 (48/64’’) 26 00, 2 350 , 1700 (48, 32, 20 /64’’) 21 00, 1900 (48, 32/ 64’’) Gas flow, 1000, 700 (20 , 16/64’’) 24 40,1700 (48, 32/ 64’’) 21 00 ( 32/ 64’’)