1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

dwg 13 9070 00304bl1 a 000

2 212 1

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 2
Dung lượng 249,08 KB

Nội dung

DRAWING/DOCUMENT STATUS A FOR REFERENCE 2006-04-10 First issue Steenmeyer DATE DESCRIPTION Bearb Coord Rev Liedtke Sudhoff Geprüft Checked APPD PROJECT : CAMAU 750MW COMBINED CYCLE POWER PLANT OWNER : OWNER’S ENGINEER : PETRO VIETNAM CPMB CONTRACTOR : CONTRACTOR’S ENGINEER : LILAMA CORPORATION FICHTNER SUBCONTRACTOR’S NAME : SUBCONTRACTOR’S SUPPLIER : s PARKER POWER GENERATION DRAWING TITLE : P+I Diagram Hydraulic GAP Optimization Supply System BL1 PKZ UAS Contents Code Ursprung/Original Reg No UNID Urspr.-PKZ-Nr Orig.-PC Ursprung-Nr./Original-No Projekt/Project gezeich Drawn bearb Coord geprüft Checked Abtlg Dept PKZ/PC Datum Date Name 06-04-10 STEENM 06-04-10 LIEDTKE 06-04-10 SUDHOFF P415 sgd s AG POWER GENERATION CA MAU CCPP VIT154 Maßstab Scale UA/DCC Type Inhaltskennzeichen Contents Code N/A A4 Benennung/Title P+I Diagram Hydraulic GAP Optimization Supply System BL1 Dienstst./Dept P415 UNID 454659342 XG02 MBA Zähl.-Nr Reg.-No Index/Rev 355050 Version A Blatt-Nr./Page-No CM1-L1-M-MBA.52-355050 Erstellt mit/designed with of Ersatz für Supersedes

Ngày đăng: 19/03/2017, 00:35

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN