B31.8S 2012 Managing System Integrity of Gas Pipelines

80 521 0
B31.8S  2012  Managing System Integrity of Gas Pipelines

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

B31.8S 2012 Managing System Integrity of Gas Pipelines This Standard applies to onshore pipeline systems constructed with ferrous materials and that transport gas. Pipeline system means all parts of physical facilities through which gas is transported, including pipe, valves, appurtenances attached to pipe, compressor units, metering stations, regulator stations, delivery stations, holders and fabricated assemblies. The principles and processes embodied in integrity management are applicable to all pipeline systems. This Standard is specifically designed to provide the operator (as defined in section 13) with the information necessary to develop and implement an effective integrity management program utilizing proven industry practices and processes. The processes and approaches within this Standard are applicable to the entire pipeline system.

Ngày đăng: 21/02/2017, 19:29

Mục lục

  • ASME B31 COMMITTEE ROSTER

  • 3.3 Consequence Factors to Consider

  • 4.4 Data Collection, Review, and Analysis

  • 5.4 Developing a Risk Assessment Approach

  • 5.7 Characteristics of an Effective Risk Assessment Approach

  • 5.8 Risk Estimates Using Assessment Methods

  • 5.9 Data Collection for Risk Assessment

  • 5.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs

  • 5.11 Integrity Assessment and Mitigation

  • 6.2.5 Special Considerations for the Use of In-Line Inspection Tools

  • 6.5 Other Integrity Assessment Methodologies

  • 7.5 Timing for Scheduled Responses

  • 9.5 Performance Measurement: Industry Based

  • 11 MANAGEMENT OF CHANGE PLAN

  • 13 TERMS, DEFINITIONS, AND ACRONYMS

    • 14 REFERENCES AND STANDARDS

    • Figures

      • Fig. 2.1-1 Integrity Management Program Elements

      • Fig. 2.1-2 Integrity Management Plan Process Flow Diagram

      • Fig. 3.2.4-1 Potential Impact Area

      • Fig. 7.2.1-1 Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity Management Plan

      • Fig. 13-1 Hierarchy of Terminology for Integrity Assessment

Tài liệu cùng người dùng

Tài liệu liên quan