How to switch on alcatellucent 1850TSS320 equipment power. All Notice, safety requirements.Các bước bật nguồn thiết bị Alcatellucent 1850TSS320. Các chú ý, yêu cầu an toàn. Thủ tục dựa trên tài liệu của hãng AlcatelLucent.
Alcatel-Lucent 1850 TSS-320H Test and Measurements Equipment Switch-on with GENTRU and STEP-UP converters Equipment Switch-on with GENTRU and STEP-UP converters Overview The Equipment is started up through the STEP-UP converters into the GENTRU Purpose The following checks allow to verify the correct forwarding of the power supply to the equipment Before you begin Required skills Experienced technical team Frequency First installation of the shelf Duration It takes 15 minutes Instruments The following instruments are recommended: Q.ty Description Note Digital multimeter Refer to Table 11-1, “Instruments” (p 11-3) Accessories Q.ty Description Note Screwdriver Philips #2 Voltage polarity test This test must be performed on the Branch Connectors of each rack Ensure all Step-up Converters are in OFF position Check branch -A and -B against "+" Line with the multi meter: Result: Input Power Range: -40.5 Vdc to -72 Vdc E N D O F S T E P S Alcatel-Lucent – Proprietary Alcatel-Lucent 1850 TSS-320H 12-14 Use pursuant to applicable agreements 8DG10260NAAATQZZA Release 7.1 Issue May 2016 Alcatel-Lucent 1850 TSS-320H Test and Measurements Equipment Switch-on with GENTRU and STEP-UP converters Output Voltage for main shelf with PSF320H (3.5KW) NOTICE Equipment damage hazard Never disconnect and connect power cable under load Important! All GENTRU Step-up Converters must be in OFF position Disconnect the power cables from the PSF units Turn ON the GENTRU Step-up Converters The green LED will be blinking ON/OFF for second (no load condition) and no power is provided during this period for safety reasons After that this LED will be ON in permanent way providing power: check the voltage, A1 (+BATT) vs A5 (-BATT), at the power cable plugs Figure 12-6 Power Supply Cable TSS320H with GENTRU STEP-UP - 8DG87617AA Result: • Branch Input < -65 VDC > Output Power GENTRU > -65 VDC • Branch Input < -65 VDC > Output Power GENTRU = Branch Voltage • Output Power Range GENTRU: -65 Vdc to -72 Vdc After the voltages have been measured, switch OFF the GENTRU Step-up Converters and reconnect the power cables E N D O F S T E P S Alcatel-Lucent 1850 TSS-320H Alcatel-Lucent – Proprietary 12-15 8DG10260NAAATQZZA Release 7.1 Use pursuant to applicable agreements Issue May 2016 Alcatel-Lucent 1850 TSS-320H Test and Measurements Equipment Switch-on with GENTRU and STEP-UP converters Output Voltage for main shelf with PSF2XBI (5.5KW) NOTICE Equipment damage hazard Never disconnect and connect power cable under load Important! All GENTRU Step-up Converters must be in OFF position Disconnect the power cables from the PSF units Turn ON the GENTRU Step-up Converters The green LED will be blinking ON/OFF for second (no load condition) and no power is provided during this period for safety reasons After that this LED will be ON in permanent way providing power: check the voltage at the power cables plugs • • A1 (+BATT) vs A5 (-BATT) TSS-320H side, for the cable 8DG87617AA; A1 (+BATT) vs A4 (-BATT) TSS-320H side, for the cable 8DG10009AA Figure 12-7 Power Supply Cable TSS320H with GENTRU STEP-UP - 8DG87617AA Alcatel-Lucent – Proprietary Alcatel-Lucent 1850 TSS-320H 12-16 Use pursuant to applicable agreements 8DG10260NAAATQZZA Release 7.1 Issue May 2016 Alcatel-Lucent 1850 TSS-320H Test and Measurements Equipment Switch-on with GENTRU and STEP-UP converters Figure 12-8 Power Supply Cable 5.5KW TSS320H w/ GENTRU-STEP-UP 8DG10009AA Result: • Branch Input < -65 VDC > Output Power GENTRU > -65 VDC • Branch Input < -65 VDC > Output Power GENTRU = Branch Voltage • Output Power Range GENTRU: -65 Vdc to -72 Vdc After the voltages have been measured, switch OFF the GENTRU Step-up Converters and reconnect the power cables E N D O F S T E P S Equipment Power-on Switch ON all Step-up Converters and Rack Breakers, located at the top of each rack Switch ON peripheral devices (printer, etc.) connected to the CT/ZIC Result: After FLC (in MXEC320H, MXEC320L) boot-up with empty persistency, the hardware in the system has to be configured via Equipment Provisioning Dialog and CT/ZIC (refer to the Alcatel-Lucent 1850 Transport Service Switch (TSS-320, TSS-320H, TSS-160 and TSS-160H) Release 7.1 User Provisioning Guide) E N D O F S T E P S Alcatel-Lucent 1850 TSS-320H Alcatel-Lucent – Proprietary 12-17 8DG10260NAAATQZZA Release 7.1 Use pursuant to applicable agreements Issue May 2016