1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Systematic Drilling and Blasting for Surface Excavations Part 8 potx

10 231 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 10
Dung lượng 495,6 KB

Nội dung

EM iiiO-2-3800 1 Mar 72 (1) Underwater Sllrface Shooting. Where hard rock overlies softer rock at shallow depth or only a few feet of soft material is to be removed, the “adobe” or- underwat”er surface blasting technique may be used. Usually 50-lb charges of high-velocity, waterproof explo- sives such as 60 percent gelatin dynamite or slurry blasting agents, are placed on the surface of the rock in a regular pattern connected with detonating cord for simultaneous detonation. At least 25 ft of water is needed for confinement in some jobs but this will vary. (2) Underwater Blasting in Drill Holes. Underwater blastholes are usually drilled from a barge. IIole diameters us(lally range from 2-1/2 to 6 in. depending on rock type and depth oi cut. To insure proper depth of cut, blastholes are often drilled to the same depth below grade as the spacing between the holes. A commonly used depth below grade and hole spacing is 10 ft. A higher powder factor is LIsu- ally required for underwater blasting. A square pattern of blastholes, with the same voll~me of rock per hole as an extended pattern (Fig. 5-16(a) and (b)), assures breakage of the rock by succeeding EDGE OF EENCH EDGE OF BENCfi 2 3 ● 004000 “42135 ● 00000000 .s 6 ● 0 :00 (o) SQUARE PATTERN. HOLE 1. OEFECTIVE, IS MISSED BY 2 AND 3 BUT BLASTED eY 4, 5. AND 6. FOR LARGE BuRDEN ANO SENCli HEIGHT. ● 00000000 (b) EXTENOEO PATTERN. HOLE 1, OEFECTIVE, MAY BE TAKEN OUT BY 2, 3, 4, ANO 5, SUT WILL BE UNAFFECTED BY THE SECOND ROW OF HOLES. GOOO FOR LOW BENCHES. Fig. 5-16. Blasthole patterns for [Underwater blasting (after Langefors and Kihlstr8m14) rows of holes even if a defective hole fails to fire in the front row, pro- vided the holes are drilled to a sufficient depth below grade and charged heavily enollgh Lo pull the added burden of the ~]nfired hole. 5-4. Excavation for Control of Rock Sllrfaces. Over breakage and 5-14 . BE UNAFFECTED BY THE SECOND ROW OF HOLES. GOOO FOR LOW BENCHES. Fig. 5-16. Blasthole patterns for [Underwater blasting (after Langefors and Kihlstr8m14) rows of holes even if a defective hole fails. the bottom and for close hole spac- ing should be much less. (2) Relation to Main Blast. Presplitting and primary blasting are sometimes performed in one operation with the presplit and pri- mary. iiiO-2- 380 0 i Mar 72 Table 5-3. Some Typical Hole Spacings and Diameters, Charge Concentrations, and Burdens for Smooth Blasting (after Langefors and Kihlstr6m14) Drill Hole Charge Con- Burden (thick- Diameter centration

Ngày đăng: 11/08/2014, 20:21

TỪ KHÓA LIÊN QUAN