Tài liệu tham khảo |
Loại |
Chi tiết |
1. Au, T. Introduction to Systems Engineering--Deterministic Models, Addison-Wesley, Reading, MA, 1973, Chapter 8 |
Sách, tạp chí |
Tiêu đề: |
Introduction to Systems Engineering--Deterministic Models |
|
4. Moder, J., C. Phillips and E. Davis, Project Management with CPM, PERT and Precedence Diagramming, Van Nostrand Reinhold Company, Third Edition,1983 |
Sách, tạp chí |
Tiêu đề: |
Project Management with CPM, PERT and Precedence Diagramming |
|
1. See Au, T., Introduction to Systems Engineering, Deterministic Models, Addison-Wesley Publishing Company, Reading, MA, 1973, for a detailed description of linear programming as a form of mathematical optimization. Back |
Sách, tạp chí |
Tiêu đề: |
Introduction to Systems Engineering, Deterministic Models |
|
2. See K.C. Crandall, "Project Planning with Precedence Lead/Lag Factors," Project Management Quarterly, Vol. 4, No. 3, Sept. 1973, pp. 18-27, or J.J. Moder, C.R. Phillips, and E.W. Davis, Project Management with CPM, PERT and Precedence Diagramming, New York: Van Nostrand Reinhold Company, third edition, 1983, chapter 4. Back |
Sách, tạp chí |
Tiêu đề: |
Project Planning with Precedence Lead/Lag Factors |
|
3. See C.T. Hendrickson and B.N. Janson, "A Common Network Formulation of Several Civil Engineering Problems," Civil Engineering Systems, Vol. 1, No. 4, 1984, pp. 195-203. Back |
Sách, tạp chí |
Tiêu đề: |
A Common Network Formulation of Several Civil Engineering Problems |
|
4. See IBM, Project Management System, Application Description Manual, (H20-0210), IBM, 1968. Back |
Sách, tạp chí |
Tiêu đề: |
Project Management System, Application Description Manual |
|
5. A variety of mathematical programming techniques have been proposed for this problem. For a review and comparison, see J.H. Patterson, "A Comparison of Exact Approaches for Solving the Multiple Constrained Resource Project Scheduling Problem," Management Science, Vol. 30, No. 7, 1984, pp. 854-867. Back |
Sách, tạp chí |
Tiêu đề: |
A Comparison of Exact Approaches for Solving the Multiple Constrained Resource Project Scheduling Problem |
|
6. This example is adapted from H. Smallowitz, "Construction by Computer," Civil Engineering, June, 1986, pp. 71-73. Back |
Sách, tạp chí |
Tiêu đề: |
Construction by Computer |
|
15. For the project defined in Table 10-20, suppose that you are limited to a maximum of 20 workers at any given time. Determine a desirable schedule for the project, using the late start time heuristic described in Section 10.9 |
Khác |
|
16. For the project defined in Table 10-21, suppose that you are limited to a maximum of 15 workers at any given time. Determine a desirable schedule for the project, using the late start time heuristic described in Section 10.9 |
Khác |
|
17. The examples and problems presented in this chapter generally make use of activity duration and project durations as measured in working days from the beginning of the project. Outline the procedures by which time measured in working days would be converted into calendar |
Khác |
|