1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

3G_Pre-launch Optimization Guidelines ppsx

93 209 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 93
Dung lượng 1,53 MB

Nội dung

GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero GUIDELINE for 3G RF OPTIMIZATION America Movil LATAM Projects Owner: NSN Scope: Guidelines Originator: Raj Sandhu, Allan Bispo and Daniel Platero Revised by: Danilo Cabral Status: Version 1.1 Document ID: Location: NSN BR GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero Table of Content DOCUMENT HISTORY 5 1. Introduction 6 1.1 Purpose 6 1.2 Overview 6 2. RF Cluster Acceptance 8 2.1 Preparation Phase 8 2.1.1 Compilation of planning data 9 2.1.2 Site Clustering 9 2.1.3 Drive Routes and Site Selection for Stationary Test, IRAT and RAU 9 2.1.4 Field Measurement Tools 10 2.1.4.1 Field Measurement Tools Setup 11 2.1.5 Post Processing Tools 11 2.1.6 Consistency Check 12 2.1.7 Alarm Check 12 2.1.8 PrxNoise Check 12 2.1.9 Cell Availability 13 2.2 Optimization Phase 13 2.2.1 Stationary Testing 13 2.2.2 IRAT Testing 15 2.2.3 RAU Testing 15 2.2.4 Mobile Testing 15 2.2.5 Cluster KPI References 16 2.2.6 Drive-test UE Distribution – Cluster Level 16 2.2.7 Data Processing, Analysis and Report 17 2.2.8 Change Request 17 2.3 Acceptance Phase 18 3. RF PROJECT Acceptance 19 3.1 Preparation Phase 20 3.2 Optimization Phase 20 3.2.1 IRAT Testing 21 3.2.2 Mobile Testing 21 3.2.3 Cluster KPI References 21 3.2.4 Drive-test UE Distribution – Project Level 21 3.2.5 Data Processing, Analysis and Report 22 3.2.6 Change Request 22 3.3 Acceptance Phase 22 4. Radio Optimization Guide 23 4.1 Initial Tuning 23 4.1.1 Definitions 23 4.1.2 Initial Tuning Procedure – Overview 24 4.1.2.1 Preparation Phase 24 4.1.2.2 Measurement Collection 25 4.1.2.3 Post-processing and Reporting 30 4.1.2.4 RF Analysis 30 4.1.3 Pilot Pollution 38 4.1.4 Coverage for different services 39 4.1.5 Handover Verifications 39 4.1.5.1 Soft-Handover Area Distribution 40 4.1.5.2 Neighbour List Optimization 41 4.1.5.3 Missing Neighbour 43 4.1.5.4 Inter-system Handover Verification (IRAT HO) 44 4.1.6 Other Issues not related to RF optimization 45 GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero 4.1.6.1 UE Issues 45 4.1.6.2 UTRAN HW and SW Issues 46 4.1.6.3 CORE Issues 46 4.1.6.4 Drive-test Equipment Issues 46 4.2 Optimization 47 4.2.1 Common performance issues that affect any service 47 4.2.2 Video Call Performance Issues 50 4.2.3 PS Call Performance Issues 50 4.2.4 IRAT performance 52 4.2.5 OSS KPI’s optimization 53 4.2.5.1 Accessibility related problems 53 4.2.5.2 Retainability related problems 53 4.2.5.3 Availability and Usage related problems (Capacity optimization) 54 4.2.5.4 Mobility related problems 54 4.2.5.5 Integrity related problems 54 5. Database parameters check and optimization 54 5.1 Parameter groups in RNC Database 55 5.2 Consistency Check 56 5.3 Parameter optimization 56 5.3.1 RNC Parameters 56 5.3.2 COCO Parameters 56 5.3.3 WANE and WGS Parameters 56 5.3.4 WLCSE and WSMLC Parameters 57 5.3.5 FMCI, HOPI and ADJI Parameters 57 5.3.6 WBTS Parameters 57 5.3.7 WCEL 57 5.3.8 FMCS 58 5.3.9 FMCG 60 5.3.10 HOPS 60 5.3.11 HOPG 61 5.3.12 ADJS 61 5.3.13 ADJG 62 6. Appendix 63 6.1 KPI Targets 63 6.2 Drive-test KPI Measurements – Detailing of Layer 3 Messages 64 6.2.1 Drive-test KPI Measurements – CS Voice Service 65 6.2.1.1 CS Voice Service: Voice Call Setup Success Rate 65 6.2.1.2 CS Voice Service: Voice Call Setup Time 65 6.2.1.3 CS Voice Service: Voice Call Drop Rate 66 6.2.1.4 CS Voice Service: Voice Call BLER DL 67 6.2.1.5 CS Voice Service: Voice IRAT Handover – from 3G to 2G 68 6.2.1.6 CS Voice Service: Voice IRAT Handover – from 2G to 3G 69 6.2.2 Drive-test KPI Measurements – CS UDI Video Service 70 6.2.2.1 CS UDI Video Service: Video Call Setup Success Rate 70 6.2.2.2 CS UDI Video Service: CS Video Call Setup Elapsed Time < 20 seconds 70 6.2.2.3 CS UDI Video Service: CS Video Call Drop Rate 71 6.2.2.4 CS UDI Video Service: CS Video Call BLER DL 72 6.2.3 Drive-test KPI Measurements – PS Realese 99 Data Service 73 6.2.3.1 PS Realese 99 Data Service: PS RAB Establishment Success Rate 73 6.2.3.2 PS Realese 99 Data Service: PS Round Trip Time 74 6.2.3.3 PS Realese 99 Data Service: PS RAB Drop Rate 75 6.2.3.4 PS Realese 99 Data Service: PS DL Throughput 76 6.2.3.5 PS Realese 99 Data Service: PS UL Throughput 77 6.2.4 Drive-test KPI Measurements – PS HSDPA Data Service 78 GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero 6.2.4.1 PS HSDPA Data Service: PS Round Trip Time 78 6.2.4.2 PS HSDPA Data Service: PS HSDPA Throughput 79 6.2.5 Drive-test KPI Measurements – TCP Setting for Data Services 80 6.2.6 Drive-test KPI Measurements – Multi-RAB Service 81 6.2.6.1 Multi-RAB Services: AMR Voice CSSR during PS Calls 81 6.2.6.2 Multi-RAB Services: PS Data CSSR during AMR Voice Calls 83 6.2.7 Drive-test KPI Measurements – Others Services 85 6.2.7.1 Others Services: SMS Success Rate 85 6.2.7.2 Others Services: SMS Delivery Time < 40 seconds 86 6.2.7.3 Others Services: WAP Failure Rate 87 6.2.7.4 Others Services: WAP Session Establishment Elapsed Time < 13 seconds 88 6.2.7.5 Others Services: MMS Success Rate 89 6.2.7.6 Others Services: MMS Delivery Time < 40 seconds 90 6.2.8 Drive-test KPI Measurements – RAU Testing 91 7. References 92 GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero DOCUMENT HISTORY DATE ISSUE EDITED BY SUMMARY OF CHANGES Aug 23 th 07 V1.0 Allan Bispo and Daniel Platero Initial version. Aug 27 th 07 V1.1 Allan Bispo and Danilo Cabral Revision 1 GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero 1. INTRODUCTION 1.1 Purpose This document describes the processes for Radio Access Network (RAN) optimization of the AMX LATAM WCDMA based third generation radio access network. The focus of this document is on the Radio Frequency (RF) optimization and acceptance criteria. 1.2 Overview The figure below shows the overview of acceptance requirement for the AMX LATAM project. Figure 1 : AMX Acceptance Overview – NSN proposed version Site implementation acceptance is carried out by the implementation team after the site has been commissioned and put on air. Once site implementation acceptance has been granted and the cluster is deemed fit for optimization, RF cluster acceptance will begin. Here stationary and drive testing will be carried out. Once the KPI’s are achieved for all clusters, the RF project acceptance could begin. At this phase all tests carried out at the cluster acceptance will be done again at project level. The main diference here is, besides the amout of points of interstes of the stationary tests, the coverage test. Coverage verification at project level is carried out under 50% load. The other tests do not need this additional loading. After that Provisional Acceptance (PAC) can be granted. For the Final Acceptance (FAC) many key performance indicators need to be above the customer target during a certain stability period. The figure below shows the relationship between all acceptance stages. Site Implementation Acceptance RF Cluster Acceptance RF Project Acceptance PAC FAC GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero Figure 2 : Overview of the Acceptance Stages – NSN proposed version GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero 2. RF CLUSTER ACCEPTANCE The figure below gives an overview of the RF Cluster Acceptance process. Figure 3 : RF Cluster Acceptance Process Overview * Only for clusters which contain 3G/2G borders sites The RF cluster acceptance process can be grouped into 3 main sections which are the preparation phase, optimization phase and the acceptance phase. 2.1 Preparation Phase This phase is triggered once the rollout phase is approaching its end. The objective of this phase is to prepare all the pre-requisites for the optimization phase. This can be broken down as below: V Compilation of planning data V Site Clustering Perform Mobile Testing Data Processing, Analysis & Report KPIsAchieved Submit Report to AMX Network Optimization & Change Request RF Cluster Acceptance Project Acceptance Phase Y N Network Planning Rollout Phase Perform Stationary Testing Preparation Stage for Cluster Acceptance Testing Perform IRAT Testing* Preparation Phase Optimization Phase Acceptance Phase Perform RAU Testing Perform Mobile Testing Data Processing, Analysis & Report KPIsAchieved Submit Report to AMX Network Optimization & Change Request RF Cluster Acceptance Project Acceptance Phase Y N Network Planning Rollout Phase Perform Stationary Testing Preparation Stage for Cluster Acceptance Testing Perform IRAT Testing* Preparation Phase Optimization Phase Acceptance Phase Perform RAU Testing GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System Integrations August, 27 th 2007 Revised by: Danilo Cabral Raj Sandhu, Allan Bispo and Daniel Platero V Drive Routes & Site Selection for IRAT and Stationary Test V Field Measurement Tools V Post-processing Tools V Parameter Consistency Check V Alarm Monitoring V PrxNoise Check V Cell Availability 2.1.1 Compilation of planning data It is essential that all the planning data be collected and saved in an organized manner in order to be useful during the optimization phase. The required information from planning stage is: V Technical Site Survey Report (TSSR) including panoramic pictures V As-built Site Drawing V Complete Site Database including Site_ID, Cell_ID, RNC_ID, BTS_ID, LAC, RAC, URA, SAC, Antenna Type, Antenna Height, Azimuth, Tilt (Mechanical and Electrical), Scrambling Code, ATM layer parameters, Iu parameters, IP settings etc V Coverage plots for Loaded and Unloaded cases V Service Area plots for the services that require optimization 2.1.2 Site Clustering The clusters shall be defined by Nokia Siemens Networks and documented. Following criteria shall be used in defining the cluster: 1. Each cluster shall comprise a contiguous network area of approximately 10 to 15 sites. 2. Cluster shall not be defined across RNC boundary. 2.1.3 Drive Routes and Site Selection for Stationary Test, IRAT and RAU The drive routes for cluster acceptance will be mutually agreed by America Movil LatAm and NOKIA SIEMENS NETWORKS. Drive Routes must cover all main avenues and large streets within in the cluster. Main avenues should be driven in both directions as possible. The drive routes shall be selected such that the drive route can be completed, regarding all tests scenarios mutually agreed with the customer, in one (1) day. IRAT and stationary tests will demand one (1) additional day. Target sites for Stationary testing, IRAT and RAU will be mutually agreed by America Movil LatAm and NOKIA SIEMENS NETWORKS. The IRAT sites will also be known as 3G/2G Border Sites. Ensure the following has been carried out V The stationary test locations have been mutually agreed by America Movil LatAm and NOKIA SIEMENS NETWORKS. This should not be more then 20% of the total sites in the cluster and should be carried out in all sectors of the selected sites. [...]... intranet site GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status August, 27th 2007 1 Revised by: Danilo Cabral 4 RADIO OPTIMIZATION GUIDE This chapter gives an overview of the common pre-launch optimization activities carried out Here you can find information about Network Initial Tuning, OSS KPI optimization. .. Analysis & Report Network Optimization & Change Request N KPIs Achieved Y RF Project Acceptance Submit Report to AMX Acceptance Phase 3G Network Launch Figure 8: RF Project Acceptance * only in the 3G/2G networks border The RF project acceptance process also can be grouped into 3 main sections, which are: the preparation phase, optimization phase and the acceptance phase GUIDELINES RF Optimization Guideline... prior to starting the cluster optimization 2.2 Optimization Phase Once the mains sites defined in the target cluster have achieved all integration and site acceptance requirement, Nokia Siemens Networks will initiate the RF cluster optimization, being a requisite to that the sites in a cluster must not have any impeditive restriction The technical aspects related to the optimization activities for cluster... network performance by use of RF UMTS Field Measurement Tools 3 Evaluation of measurement results, Analysis and reporting 4 Final tuning and optimization of W-CDMA network by evaluation of test measurement results (coverage optimization, parameter adjusting) GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status... measurements The data obtained with the scanner can be useful to evaluate: o low coverage areas o antenna installation problems o missing neighbors o coverage optimization The field measurement tool to be used is NEMO Outdoor: GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status August, 27th 2007 1 Revised... 90% sites of the project area In case of problems to achieve the KPI for project acceptance, the appropriate optimization actions must be taken in order to guarantee a good performance, according to the optimization process detailed in the previous chapter The technical aspects related to the optimization activities for project optimizaion are available at the chapter “Radio Optimizaiton Guide” Stationary... data (between Radio Network Planning and Initial Tuning Team) GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status August, 27th 2007 1 Revised by: Danilo Cabral Additionally the service/bearer that will be used during the initial tuning and the optimization activities must be ones that more represent the... the whole drive-test route § o Integrity – improved IRAT handover optimization capability PS data R99 – full data along the whole drive-test route § Integrity – improved IRAT handover optimization capability GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status August, 27th 2007 1 Revised by: Danilo Cabral c)... Integrity – PS data throughput, RTT, DL BLER, UE Tx Power, SIR, improved IRAT handover optimization capability Multi-RAB with HSDPA services (R5 UE only) In the first moment of the optimization activities, especially the initial tuning is not essential to carry out HSDPA as the principal one for PS data At the firsts rounds of optimization, when the gross of the change request are done in order to improve... antenna pattern and antenna height tuning GUIDELINES RF Optimization Guideline for AMX 3G Rollout Consulting and System Integrations Raj Sandhu, Allan Bispo and Daniel Platero Version Status August, 27th 2007 1 Revised by: Danilo Cabral ü CPICH Tx Power * To change these two parameters is almost sufficient for initial tuning The flow above shows this, the main RF optimization actions for initial tuning . IRAT Testing* Preparation Phase Optimization Phase Acceptance Phase Perform RAU Testing GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and System. missing neighbors o coverage optimization The field measurement tool to be used is NEMO Outdoor: GUIDELINES Version Status RF Optimization Guideline for AMX 3G Rollout 1 Consulting and. 10 seconds 3 Video Short Call (3G to 3G) CS Video CSSR (call setup success rate) CS Video Call Setup Elapsed Time Voice Drop Rate Voice BLER - 3G to 3G Video call - Originating side

Ngày đăng: 29/06/2014, 14:20

TỪ KHÓA LIÊN QUAN