Trang 1 CRD FIELD DEVELOPMENT PROJECT AND PVE PROPOSED ENGINEERING SOW Trang 2 INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR PVETABLE CONTENT1.INTRODUCTION FOR CA RON

Trang 1

CRD FIELD DEVELOPMENT PROJECT AND

PVE PROPOSED ENGINEERING SOW

CRD FIELD DEVELOPMENT PROJECT AND

PVE PROPOSED ENGINEERING SOW

Trang 2

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

TABLE CONTENT

1 INTRODUCTION FOR CA RONG DO FIELD DEVELOPMENT(CRĐ)

2 INTRODUCTION FOR CRD TLWP + FPSO

3 THE PROPOSED SOW FOR PVE

4 TRACK RECORD AND KEY PERSONNEL

Trang 3

ENGINEERING FOR VALUE 3

1 INTRODUCTION

Talisman Vietnam 07/03 is the operator

of Block 07/03 field offshore Vietnam

and is considering the development of

the Ca Rong Do (CRD) oil discovery

on behalf of the Block 07/03 Partners.

The CRD field is located on an area

with water depth of approximately

320m CRD targets for the first oil in

Q.2/2018

Trang 4

1 INTRODUCTION

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

Field Data:

- Field Type: Oil Field

- Well Count: 15 (09 producer wells, 02 gas injection wells, and 04 water injection wells.

- A total of 16 slots for fixed wellhead facility

- Average depth of 320 m

Facilities Design Capacity:

- Oil System: 30,000 stbpd (margined 20%)

- Associated Gas Systems: 60 MMSCFD (margined 20%)

- Non-associated Gas System: 40 MMSCFD (margined 33%)

- Gaslift Systems: 27 MMSCFD (margined 20%)

- Water Injection Systems: 46,200 bpd (margined 10%)

- Total liquids System: 46,200 bpd (margined 10%)

Trang 5

ENGINEERING FOR VALUE 5

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT CRD SCHEMETIC OVERVIEW

Trang 6

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

SCHEMATIC OVERALL FIELD LAYOUT

Trang 7

ENGINEERING FOR VALUE 7

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT PROCESS FLOW SCHEMATIC

Trang 8

TOPSIDE FACILITY SYSTEMS

a Wellhead Facility

- Production Manifold (Wells Test Manifold)

- Gaslift Manifold

- Water Injection Manifold

- Gas Injection Manifold

- Wellhead Control Panel & HPU

- FWS Launcher A/B (14”)

- Gaslift Receiver (8”)

- Gas Injection Receiver (8”)

- Water Injection Receiver (10”)

- Future Inlet Receiver (14”)

- Temporary Launcher/Receiver (8” & 10”)

b Production Separator

c Power Generator

d Chemical Injection System

e Potable Water Sysytem

f Utilities System

JACKET (TENSION LEG)

2.1 TLWP FACILITY SYSTEMS

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE

PROPOSED SOW FOR PVE

Trang 9

ENGINEERING FOR VALUE 9

2.1 TLWP FACILITY SYSTEMS

2 2 CRD TLWP STRUCTURE

Trang 10

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

2 2 CRD TLWP STRUCTURE (CONTINUE)

Trang 11

ENGINEERING FOR VALUE 11

2 2 CRD TLWP DRILLING TEMPLATE

Trang 12

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

2.3 CRD TLWP STRUCTURE DESIGN

Trang 13

ENGINEERING FOR VALUE 13

2.3 CRD TLWP STRUCTURE DESIGN

Trang 14

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

- Condensate Stabiliser Package

- LP Separator Crude Pump

- Produced Water Cooler

b Gas Recompression System

b Gas Dehydration System

c MRU (Mercury Removal Unit) (Future

Equipment)

d Gas Dewpoint Control

e Booster Compression System

f Gas Meetring System

2.2 FPSO FACILITY SYSTEMS

TOPSIDE FACILITY SYSTEMS

f Gas Re-Injection System

g Produced Water Treament System

h Heating Medium System

i Cooling Medium System

j Water Injection

k Power Generator

l Flare/Vent System

m Chemical Injection System

n Fuel Gas System

o Other Utilities System

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT

Trang 15

ENGINEERING FOR VALUE 15

2.3 SUBSEA PIPELINE

2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT

THE PIPELINE AND UMBILICAL SYSTEM OF CA RONG DO FIELD

DEVELOPMENT ARE CONSISTS OF:

 02 X 14”, 1500#, INSULATED PRODUCTION LINES;

 01 X 6”, 1500#, GAS LIFT LINE;

 01 X 6”, 2500#, GAS RE-INJECTION LINE;

 01 X 8”, 1500#, WATER INJECTION;

 01 X 10”, 1500#, SALES GAS EXPORT PIPELINE;

 01 X UMBILICAL FOR POWER AND FIBER OPTICS CONTROL

Trang 16

3 THE PROPOSED SOW FOR PVE

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

Trang 17

ENGINEERING FOR VALUE 17

3 THE PROPOSED SOW FOR PVE

3.2 FPSO

FOR FPSO TOPSIDE FACILITY SYSTEMS

Because of the topside facility systems on FPSO are similar to others CPP Topside Facility which PVE had completed design such as:

Trang 18

sub-ENGINEERING FOR VALUE 18

3 THE PROPOSED SOW FOR PVE

INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR

PVE

3.3 SUBSEA PIPELINE

SOW FOR SUBSEA PIPELINE FEDD DESIGN:

 PIPELINE ROUTE SELECTION REPORT;

 PIPELINE COATING SELECTION ASSESSMENT REPORT;

 PIPELINE WALL THICKNESS CALCULATION REPORT;

 PIPELINE ON-BOTTOM STABILITY ANALYSIS REPORT;

 PIPELINE END EXPANSION ANALYSIS REPORT;

 PIPELINE FREE SPAN ANALYSIS REPORT;

 PIPELINE INSTALLATION ANALYSIS REPORT;

 DROPPED OBJECT AND TRAWL GEAR IMPACT STUDY REPORT;

 CATHODIC PROTECTION REPORT;

 TIE-IN SPOOL STRESS ANALYSIS REPORT;

 SCR (STEEL CATENARY RISER) AND FLEXIBLE RISER

CONFIGURATION AND BUOYANCY ASSESSMENT REPORT – PARTNER’S SCOPE;

 SCR DESIGN – STRESS ANALYSIS/ VIV ASSESSMENT/ FATIGUE

ANALYSIS – PARTNER’S SCOPE

 LATERAL BUCKLING ANALYSIS FOR HIGH PRESSURE/ HIGH

TEMPERATURE PIPELINES;

PVE has experienced personnel and software required for execution of CRD PL FEED

We suggest to be nominated main Contractor with involvement of an International

Trang 19

ENGINEERING FOR VALUE 19

 SOME OF THE INVOLVED DEEPWATER PROJECTS ARE LISTED BELOW:

Trang 20

 2 X DTU (DRY THREE UNITS)

 1 X CPF (CENTRAL PROCESSING FACILITY) IN 100 M WATER DEPTH

 SUBSEA STRUCTURES, MANIFOLDS, WELL HEADS, PLETS, HT/HP INFIELD FLOWLINES AND EXPORT PIPELINES, UMBILICAL AND POWER CABLES

Trang 21

ENGINEERING FOR VALUE 21

4 KEY PERSONEL

Trang 22

 SUBSEA CONTROL AND UMBILICAL SYSTEMS

 SUBSEA STRUCTURES, WELL HEADS, MANIFOLDS, PLET, RISER BASES, SSIV.

Trang 23

ENGINEERING FOR VALUE 23

Trang 24

HEADS, PLETS, ETC.

 HT/HP CRA CLAD

FLOWLINES, PIPELINES, UMBILICAL AND POWER CABLES

Trang 25

ENGINEERING FOR VALUE 25

THANK YOU FOR THE

ATTENTION!