Trang 1 CRD FIELD DEVELOPMENT PROJECT AND PVE PROPOSED ENGINEERING SOW Trang 2 INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR PVETABLE CONTENT1.INTRODUCTION FOR CA RON
Trang 1CRD FIELD DEVELOPMENT PROJECT AND
PVE PROPOSED ENGINEERING SOW
CRD FIELD DEVELOPMENT PROJECT AND
PVE PROPOSED ENGINEERING SOW
Trang 2INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
TABLE CONTENT
1 INTRODUCTION FOR CA RONG DO FIELD DEVELOPMENT(CRĐ)
2 INTRODUCTION FOR CRD TLWP + FPSO
3 THE PROPOSED SOW FOR PVE
4 TRACK RECORD AND KEY PERSONNEL
Trang 3ENGINEERING FOR VALUE 3
1 INTRODUCTION
Talisman Vietnam 07/03 is the operator
of Block 07/03 field offshore Vietnam
and is considering the development of
the Ca Rong Do (CRD) oil discovery
on behalf of the Block 07/03 Partners.
The CRD field is located on an area
with water depth of approximately
320m CRD targets for the first oil in
Q.2/2018
Trang 41 INTRODUCTION
INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
Field Data:
- Field Type: Oil Field
- Well Count: 15 (09 producer wells, 02 gas injection wells, and 04 water injection wells.
- A total of 16 slots for fixed wellhead facility
- Average depth of 320 m
Facilities Design Capacity:
- Oil System: 30,000 stbpd (margined 20%)
- Associated Gas Systems: 60 MMSCFD (margined 20%)
- Non-associated Gas System: 40 MMSCFD (margined 33%)
- Gaslift Systems: 27 MMSCFD (margined 20%)
- Water Injection Systems: 46,200 bpd (margined 10%)
- Total liquids System: 46,200 bpd (margined 10%)
Trang 5ENGINEERING FOR VALUE 5
2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT CRD SCHEMETIC OVERVIEW
Trang 62 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT
INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
SCHEMATIC OVERALL FIELD LAYOUT
Trang 7ENGINEERING FOR VALUE 7
2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT PROCESS FLOW SCHEMATIC
Trang 8TOPSIDE FACILITY SYSTEMS
a Wellhead Facility
- Production Manifold (Wells Test Manifold)
- Gaslift Manifold
- Water Injection Manifold
- Gas Injection Manifold
- Wellhead Control Panel & HPU
- FWS Launcher A/B (14”)
- Gaslift Receiver (8”)
- Gas Injection Receiver (8”)
- Water Injection Receiver (10”)
- Future Inlet Receiver (14”)
- Temporary Launcher/Receiver (8” & 10”)
b Production Separator
c Power Generator
d Chemical Injection System
e Potable Water Sysytem
f Utilities System
JACKET (TENSION LEG)
2.1 TLWP FACILITY SYSTEMS
2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT
INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE
PROPOSED SOW FOR PVE
Trang 9ENGINEERING FOR VALUE 9
2.1 TLWP FACILITY SYSTEMS
2 2 CRD TLWP STRUCTURE
Trang 10INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
2 2 CRD TLWP STRUCTURE (CONTINUE)
Trang 11ENGINEERING FOR VALUE 11
2 2 CRD TLWP DRILLING TEMPLATE
Trang 12INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
2.3 CRD TLWP STRUCTURE DESIGN
Trang 13ENGINEERING FOR VALUE 13
2.3 CRD TLWP STRUCTURE DESIGN
Trang 14INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
- Condensate Stabiliser Package
- LP Separator Crude Pump
- Produced Water Cooler
b Gas Recompression System
b Gas Dehydration System
c MRU (Mercury Removal Unit) (Future
Equipment)
d Gas Dewpoint Control
e Booster Compression System
f Gas Meetring System
2.2 FPSO FACILITY SYSTEMS
TOPSIDE FACILITY SYSTEMS
f Gas Re-Injection System
g Produced Water Treament System
h Heating Medium System
i Cooling Medium System
j Water Injection
k Power Generator
l Flare/Vent System
m Chemical Injection System
n Fuel Gas System
o Other Utilities System
2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT
Trang 15ENGINEERING FOR VALUE 15
2.3 SUBSEA PIPELINE
2 INTRODUCTION FOR CRD TLWP AND FPSO DEVELOPMENT
THE PIPELINE AND UMBILICAL SYSTEM OF CA RONG DO FIELD
DEVELOPMENT ARE CONSISTS OF:
02 X 14”, 1500#, INSULATED PRODUCTION LINES;
01 X 6”, 1500#, GAS LIFT LINE;
01 X 6”, 2500#, GAS RE-INJECTION LINE;
01 X 8”, 1500#, WATER INJECTION;
01 X 10”, 1500#, SALES GAS EXPORT PIPELINE;
01 X UMBILICAL FOR POWER AND FIBER OPTICS CONTROL
Trang 163 THE PROPOSED SOW FOR PVE
INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
Trang 17ENGINEERING FOR VALUE 17
3 THE PROPOSED SOW FOR PVE
3.2 FPSO
FOR FPSO TOPSIDE FACILITY SYSTEMS
Because of the topside facility systems on FPSO are similar to others CPP Topside Facility which PVE had completed design such as:
Trang 18sub-ENGINEERING FOR VALUE 18
3 THE PROPOSED SOW FOR PVE
INTRODUCTION FOR CRD FIELD DEVELOPMENT AND THE PROPOSED SOW FOR
PVE
3.3 SUBSEA PIPELINE
SOW FOR SUBSEA PIPELINE FEDD DESIGN:
PIPELINE ROUTE SELECTION REPORT;
PIPELINE COATING SELECTION ASSESSMENT REPORT;
PIPELINE WALL THICKNESS CALCULATION REPORT;
PIPELINE ON-BOTTOM STABILITY ANALYSIS REPORT;
PIPELINE END EXPANSION ANALYSIS REPORT;
PIPELINE FREE SPAN ANALYSIS REPORT;
PIPELINE INSTALLATION ANALYSIS REPORT;
DROPPED OBJECT AND TRAWL GEAR IMPACT STUDY REPORT;
CATHODIC PROTECTION REPORT;
TIE-IN SPOOL STRESS ANALYSIS REPORT;
SCR (STEEL CATENARY RISER) AND FLEXIBLE RISER
CONFIGURATION AND BUOYANCY ASSESSMENT REPORT – PARTNER’S SCOPE;
SCR DESIGN – STRESS ANALYSIS/ VIV ASSESSMENT/ FATIGUE
ANALYSIS – PARTNER’S SCOPE
LATERAL BUCKLING ANALYSIS FOR HIGH PRESSURE/ HIGH
TEMPERATURE PIPELINES;
PVE has experienced personnel and software required for execution of CRD PL FEED
We suggest to be nominated main Contractor with involvement of an International
Trang 19ENGINEERING FOR VALUE 19
SOME OF THE INVOLVED DEEPWATER PROJECTS ARE LISTED BELOW:
Trang 20 2 X DTU (DRY THREE UNITS)
1 X CPF (CENTRAL PROCESSING FACILITY) IN 100 M WATER DEPTH
SUBSEA STRUCTURES, MANIFOLDS, WELL HEADS, PLETS, HT/HP INFIELD FLOWLINES AND EXPORT PIPELINES, UMBILICAL AND POWER CABLES
Trang 21ENGINEERING FOR VALUE 21
4 KEY PERSONEL
Trang 22 SUBSEA CONTROL AND UMBILICAL SYSTEMS
SUBSEA STRUCTURES, WELL HEADS, MANIFOLDS, PLET, RISER BASES, SSIV.
Trang 23ENGINEERING FOR VALUE 23
Trang 24HEADS, PLETS, ETC.
HT/HP CRA CLAD
FLOWLINES, PIPELINES, UMBILICAL AND POWER CABLES
Trang 25ENGINEERING FOR VALUE 25
THANK YOU FOR THE
ATTENTION!