Ebook Multidisciplinary scheduling: Theory and applications

390 0 0
Ebook Multidisciplinary scheduling: Theory and applications

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

Ebook Multidisciplinary scheduling: Theory and applications is a volume of nineteen reviewed papers that were selected from the sixtyseven papers presented during the First Multidisciplinary International Conference of Scheduling (MISTA). This is the initial volume of MISTA—the primary forum on interdisciplinary research on scheduling research. Each paper in the volume has been rigorously reviewed and carefully copyedited to ensure its... Đề tài Hoàn thiện công tác quản trị nhân sự tại Công ty TNHH Mộc Khải Tuyên được nghiên cứu nhằm giúp công ty TNHH Mộc Khải Tuyên làm rõ được thực trạng công tác quản trị nhân sự trong công ty như thế nào từ đó đề ra các giải pháp giúp công ty hoàn thiện công tác quản trị nhân sự tốt hơn trong thời gian tới.

1st Multidisciplinary International Conference on Scheduling Theory and Applications MULTIDISCIPLINARY SCHEDULING Theory and Applications Graham Kendall, Edmund Burke Sanja Petrovic and Michel Gendreau Multidisciplinary Scheduling: Theory and Applications Multidisciplinary Scheduling: Theory and Applications 1" International Conference, MISTA '03 Nottingham, UK, 13-15 August 2003 Selected Papers edited by Graham Kendall Edmund Burke Sanja Petrovic Michel Gendreau Q - Springer Graham Kendall Univ, of Nottingharn United Kingdom Edmund K Burke Univ of Nottingham United Kingdom Sanja Petrovic Univ of Nottingham United Kingdom Michel Gendreau Universitt? de Montrkal Canada Library of Congress Cataloging-in-Publication Data A C.I.P Catalogue record for this book is available from the Library of Congress ISBN 0-387-25266-5 e-ISBN 0-387-25267-3 Printed on acid-free paper Copyright O 2005 by Springer Science+Business Media, Inc All rights reserved This work may not be translated or copied in whole or in part without the written permission of the publisher (Springer Science + Business Media, Inc., 233 Spring Street, New York, NY 10013, USA), except for brief excerpts in connection with reviews or scholarly analysis Use in connection with any form of information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now know or hereafter developed is forbidden The use in this publication of trade names, trademarks, service marks and similar terms, even if the are not identified as such, is not to be taken as an expression of opinion as to whether or not they are subject to proprietary rights Printed in the United States of America SPIN 11052258 Table of Contents Fundamentals of Scheduling Is Scheduling a Solved Problem? Stephen E Smith Formulations, Relaxations, Approximations, and Gaps 19 in the World of Scheduling Gerhard J Woeginger Order Scheduling Models: An Overview 37 Joseph Z - Leung, Haibing Li, Michael Pinedo Multi-criteria Scheduling Scheduling in Software Development Using Multiobjective Evolutionary Algorithms Thomas Hanne, Stefan Nickel 57 Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time Yakov Zindel; Van Ha Do 83 Personnel Scheduling Task Scheduling under Gang Constraints Dirk Christian Mattjield, Jiirgen Branke .113 Scheduling in Space Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems 133 Angelo Oddi, Nicola Policella, Amedeo Cesta, Gabriella Cortellessa Scheduling the Internet Towards an XML based standard for Timetabling Problems: TTML Ender 0zcan 163 vi Table of Contents A Scheduling Web Service Leonilde Varela, Joaquim Aparicio, Silvio Carmo Silva 187 Machine Scheduling An 0(N log N) Stable Algorithm for Immediate Selections Adjustments Laurent Peridy, David Rivreau 205 An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances Mohamed AH Aloulou, Marie-Claude Portmann 223 A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem Jean-Paul Watson, L Darrell Whitley, Adele E Howe 247 Bin Packing The Best-Fit Rule For Multibin Packing: An Extension of Graham's List Algorithms Pierre Lemaire, Gerd Finke, Nadia Brauner 269 Educational Timetabling Case-Based Initialisation of Metaheuristics for Examination Timetabling Sanja Petrovic, Yong Yang, Moshe Dror 289 An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling Graham Kendall and Naimah Mohd Hussin 309 Sports Scheduling Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique Dalibor Froncek, Mariusz Meszka 331 Table of Contents vii Transport Scheduling Rail Container Service Planning: A Constraint-Based Approach Nakorn Indra-Payoong, Raymond S K Kwan, Les Proll 343 Rule-Based System for Platform Assignment in Bus Stations B Adenso-Diaz 369 Measuring the Robustness of Airline Fleet Schedules 381 F Bian, E K Burke, S Jain, G Kendall, G M Koole, J D Landa Silva, J Mulder, M C E Paelinck, C Reeves, I Rusdi, M O Suleman Author Index 393 Preface The First Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA) was held in Nottingham, UK on 13—15th August 2003 Over one hundred people attended the conference and 67 abstracts and papers (including four plenary papers) were presented All of these presentations were chosen for the conference after being refereed by our international Programme Committee which consisted of 90 scheduling researchers from across 21 countries and from across a very broad disciplinary spectrum (see below) After the conference, we invited the authors of the 67 accepted presentations to submit a full paper for publication in this post conference volume of selected and revised papers This volume contains the 19 papers that were successful in a second round of rigorous reviewing that was undertaken (once again) by our Programme Committee The main goal of the MISTA conference series is to act as an international forum for multidisciplinary scheduling research As far as we are aware, there is no other conference which is specifically aimed at exploring the interdisciplinary interactions which are so important (in our opinion) to future progress in scheduling research As such, MISTA aims to bring together researchers from across disciplinary boundaries and to promote an international multi-disciplinary research agenda The first conference was particularly successful in bringing together researchers from many disciplines including operational research, mathematics, artificial intelligence, computer science, management, engineering, transport, business and industry MISTA was one of the outcomes of a highly successful interdisciplinary scheduling network grant (GRlN35205) which was funded by the UK's Engineering and Physical Sciences Research Council (EPSRC)—which is the largest of the seven UK research councils The network was launched in May 2001 and was funded for a period of three years It provided an interdisciplinary framework for academia and industrialists to meet, exchange ideas and develop a collaborative multi-disciplinary scheduling research agenda The MISTA conference was the culmination of the network's dissemination activity and it enabled the network to reach out to an international audience The aim is that the MISTA conference series will become an ongoing international legacy of the network's activity The International Society for Interdisciplinary Scheduling (ISIS) was another initiative which arose from the network Indeed, this society represents the network's international continuation strategy The goal is that the society will carry the network's activity forward-but from an international rather than national perspective The society currently has a healthy and growing mem- x Preface bership and is open to anybody with an interest in interdisciplinary scheduling The Journal of Scheduling (published by Kluwer) represents the society's journal and the MISTA conference represents the society's main international event The first MISTA conference could not have taken place without the help and support of many people and organisations We would, firstly, like to acknowledge the support of EPSRC, the London Mathematical Society, Sherwood Press Ltd, Kluwer Academic Publishers and the University of Nottingham who all supported the conference with help, advice and (most importantly) financial contributions We are particularly grateful to our international Programme Committee who worked extremely hard over two separate rounds of reviewing to ensure that the standards of the conference, and of this volume, were of the highest quality We are very grateful to our Local Organising Committee (see below) who spent a significant amount of time to make sure that the conference ran smoothly Very special thanks go to Alison Payne, Eric Soubeiga and Dario Landa Silva who deserve a particular mention for their hard work which really was above and beyond the call of duty Thanks should also go to everybody else in the Automated Scheduling, Optimisation and Planning research group at Nottingham who all pulled together to help with all the little jobs that needed carrying out during the conference organisation Special thanks should go to our copy editor, Piers Maddox, who has done such a wonderful job of putting this volume together in such a professional and careful manner We would also like to acknowledge the significant support that we received from Gary Folven and his staff at Kluwer which was so important in launching a brand new conference series We would like to say a particularly big thank you to the International Advisory Committee for their past and ongoing work in bringing you this and future MISTA conferences Finally, we would like to thank the authors, delegates and (in particular) our plenary speakers for making the conference the great success that it was The Second MISTA conference is due to take place in New York on 18-20th July 2005 We are looking forward to it and we hope to see you there Graham Kendall Edmund Burke Sanja Petrovic Michel Gendreau October 2004 MISTA Conference Series International Advisory Committee Graham Kendall (chair) The University of Nottingham, UK Abdelhakim Artiba Facultes Universitares Catholiques de Mons (CREGI - FUCAM), Belguim Institute of Computing Science, Poznan University of Technology, Poland University of Osnabrueck, Germany The University of Nottingham, UK The Chinese University of Hong Kong, Hong Kong Columbia University, USA The University of Arizona, USA Natural Selection Inc., USA Leeds School of Business, University of Colorado, USA Laboratoire Genie de Production - Equipe Production Automatisee, France ILOG, France Kyoto University, Japan New York University, USA American University of Beirut, Lebanon Universitt5 de Montreal, Canada Graduate School of Industrial Administration, Carnegie Mellon University, USA Carnegie Mellon University, USA Erasmus University, Netherlands University of Ottawa, Canada Jacek Blazewicz Peter Brucker Edmund Burke Xiaoqiang Cai Ed Coffman Moshe Dror David Fogel Fred Glover Bernard Grabot Claude Le Pape Toshihide Ibaraki Michael Pinedo Ibrahim Osman Jean-Yves Potvin Michael Trick Stephen Smith Steef van de Velde George White 378 Adenso-Diaz Although the calculation time depends to a great extent on the number of services and the number and types of rules introduced, in the station where it is being tested the system takes minutes on a Pentium III to generate a solution for 1,100 services using some 50 rules ON-LINE MODULE On a normal working day at the station, one of the off-line plans generated in the above module in accordance with different scenarios is initially loaded During the day, however, two types of event may take place that force the preestablished assignment to be modified: rn Incidents that alter the arrival or departure of buses (leading, as a result of a delay, to a platform that is assigned to a service currently being occupied by the following service assigned to it, with the consequent need to find a new assignment for the first service) or the number of buses (since, owing to passenger demand, it has been decided to reinforce a service with another bus, for which a new platform will have to be found In these cases, modifications will have to be made to the previously realised assignment for the service rn The creation of new special services not contemplated in the standard off-line plan chosen for the time of year or the day under consideration In this case, a totally new assignment will have to be made for the service In both cases, the rules that the manager wishes to consider when making the re-assignment are chosen via a new screen In the first case, the rules are of the type "find the closest platform possible to the pre-assigned platform for this service", or to another specific platform that is established In the second case, rules are used that search among the platforms that are free at the time the service has to be offered for those that are closest either to those where other similar services to the new one leave from or arrive at, or those that belong to the same company, etc The algorithm of this module is simpler to implement than the above off-line algorithm As the off-line plan is fixed and the time horizon we are dealing with is as close as it is in this case, being affected by only one service, the possible re-assignment alternatives are very few in number CONCLUSIONS Daily management of a bus station introduces many different types of fuzzy and hard constraints when assigning platforms to services A complete system has been designed for solving the platform assignment problem in bus stations Rule-Based System for Platform Assignment 379 based on the definition by the management of a set of rules that the assignment solution should satisfy Two different types of rules were considered for the off-line module Based on their characteristics, a search procedure looks for a solution satisfying (if possible) all the hard constraints, maximising the value considering the approximate rules The on-line module searches for an alternative assignment when, in the day to day use of the system, any unplanned event occurs that forces re-assignment of platforms This logic could be easily transferred to other environments where complex rules, which make the use of exact approaches difficult, have to be defined for the assignment of resources The system is currently being used at Oviedo bus station (Northern Spain), a facility with more than 1,100 daily bus services The computation time needed for the off-line calculation in this station is around 10 minutes, being the system able to find solutions satisfying the current constraints established at the site References Bolat, A (2000) Procedures for providing robust gate assignments for arriving aircrafts Eumpean Journal of Operational Research, 120:63-80 Brelaz, D (1979) New methods to color the vertices of a graph Communications of ACM, 22:251-256 Cheng, Yu (1997) A knowledge-based airport gate assignment system integrated with mathematical programming Computers and lndustrial Engineering, 322337452 Gosling, G D (1990) Design of an expert system for aircraft gate assignment Transportation Research A, 2459-69 Haghani, A and Chen, M.-Ch (1998) Optimizing gate assignments at airport terminals Transportation Research A, 32:437454 Hamzawi, S G (1986) Management and planning of airport gate capacity: a microcomputerbased gate assignment simulation model TransportationPlanning and Technology,11:189202 Mangoubi, R S and Mathaisel, E X (1985) Optimizing gate Assignments at airport terminals Transportation Science, 19:173-188 Srihari, K and Muthukrishnan, R (1991) An expert system methodology for aircraft-gate assignment Computers and lndustrial Engineering, 21:lOl-105 Su, Y Y and Srihari, K (1993) A knowledge based aircraft-gate assignment advisor Computers and Industrial Engineering, 25:123-126 Yan, S, and Chang, C.-M (1998) A network model for gate assignment Journal of Advanced Transportation, 32:176-189 Yan, S and Huo, C.-M (2001) Optimization of multiple objective gate assignments Transportation Research A, 35413-432 Yan, S., Shieh, C.-Y and Chen, M (2002) A simulation framework for evaluating airport gate assignments TransportationResearch A, 36:885-898 MEASURING THE ROBUSTNESS OF AIRLINE FLEET SCHEDULES F ~ i a n ' , E K ~ u r k e S ~ , ~ a i n G ~ , enda all^, G M ~ o o l e J.~ ,D Landa silva2, J ~ u l d e rM ~ ,C E paelinck5, C Reeves6, I Rusdi7, M 0.sulemanl ' ~niversityof Oxford, UK ~ h University e of Nottingham, UK ~ s t o nUniversity, UK ~ r e University e of Amsterdam, The Netherlands 5~~~ Airlines, The Netherlands 'coventry University, UK 7~echnicalUniversity of Delft, The Netherlands Abstract Constructing good quality fleet schedules is essential for an airline to operate in an effective and efficient way in order to accomplish high levels of consumer satisfaction and to maximise profits The robustness of an airline schedule is an indicative measure of how good the schedule is because a robust plan allows the airline to cope with the unexpected disturbances which normally occur on a daily basis This paper describes a method to measure the robustness of schedules for aircraft fleet scheduling within KLM Airlines The method is based on the "Aircraft on Ground (ACOG)" measure, it employs statistical methods (although alternative methods were also considered) and it is shown to provide a good estimation of the robustness of a given schedule Keywords: modelling, airline scheduling, schedule quality measures, INTRODUCTION The problem of generating fleet schedules is crucially important to the efficiency of an airline (Barnhart et al., 1997; Barnhart and Talluri, 1997) An effective schedule can lead to significant savings It can also, and perhaps more importantly, contribute to higher levels of customer satisfaction Customers who experience regular delays with a particular airline are likely to take their custom elsewhere Of course, delays are inevitable for a wide range of reasons (e.g technical breakdowns, security alerts, adverse weather, etc) However, an indicative measure of the quality of an airline schedule is its level of robustness: How well can a schedule cope with a delay(s) to a particular aircraft(s)? Bian et al Is there enough slack in the schedule to minimise the knock on effect of a delay to a particular aircraft? If there is no slack in the schedule then a delay to one aircraft could affect a significantproportion of the fleet and this could have major resource implications If passengers miss connecting flights then the airline has to cover the incurred costs However, building slack into the schedule is expensive It essentially involves aircraft standing idle One of the goals in trying to generate a high quality fleet schedule is to build in enough slack to ensure that the schedule has an acceptable level of robustness while, at the same time, attempting to keep costs at an effective level It would be very easy indeed to build a very robust schedule However, it would be too expensive to implement It would also be possible to build a schedule which minimises cost by decreasing aircraft idle time However, this could easily lead to an increase in the overall incurred costs if one minor delay to one aircraft leads to a chain of delays In summary, the goal is to provide an effective balance between robustness and aircraft idle time The integration of schedule optimisation algorithms and other systems in an airline is crucial to achieve an effective scheduling environment that considers all functions of the airline (Mathaisel, 1997) Reviews of research on airline scheduling are presented in Etschmaier and Mathaisel (1985) and Richter (1989) A more recent survey on models and solution methods for a range of problems in aircraft scheduling was carried out by Gopalan and Talluri (1998) Aircraft scheduling is often addressed simultaneously with other associated problems An example is provided by fleet assignment with time windows where the assignment of aircraft is carried out simultaneously to scheduling flight departures in order to improve flight connection opportunities and minimise costs (Rexing et al., 2000) The scheduling of maintenance operations and of aircraft are considered simultaneously using network models and a twophase heuristic by Feo and Bard (1989), while crew availability and maintenance operations are taken into account while tackling the fleet assignment problem in Clarke and Hane (2001) The additional constraint of equal aircraft utilisation when tackling fleet assignment and aircraft routing problems is considered by(Barnhart et al (1998) A network model for large-scale fleet assignment problems that permits the expression of constraints within a unified framework was presented by Rushmeier and Kontogiorgis (1997) Integer linear programming techniques have been applied by several researchers to tackle fleet assignment, aircraft routing and related problems (Abara, 1989; Subramanian, 1994; Hane et al., 1995) Dynamic programming and heuristics have also been investigated for the problem of fleet assignment (El Moudani and Mora-Camino, 2000) Recently, meta-heuristic methods have been used to tackle airline scheduling problems For example, simulated annealing was applied to the optimisation of airline schedules by Mashford and Marksjo (2001) Sosnowska and Rolim (2001) showed that by applying sim- Measuring the Robustness of Airline Fleet Schedules 383 ulated annealing to the fleet assignment and aircraft routing, improvements of about 10-20% over the method used by the company could be achieved A genetic algorithm was applied to generate alternative routes for air traffic by Oussedik et al (2000) Also recently, genetic search methods have been applied to solve the problem of sequencing the arrival of aircraft in airports (Hansen, 2004; Ciesielski and Scerri, 1997, 1998) Re-scheduling is a crucial activity for airlines and it has to be carried out on a daily basis due to a number of uncertainties and unforeseen events Disruptions of planned schedules can result in a chain of events that can cause major disruptions throughout the system A survey of techniques employed to recover from these disruptions is presented by Filar et al (2001) A stochastic model is employed by Rosenberger et al (2003) to show that the actual performance of an airline differs greatly from the planned performance while Argiiello and Bard (1997) propose a GRASP method to reconstruct schedules while minirnising costs and satisfying constraints Network models and Lagrangian relaxation were used by Yan and Lin (1997) for aircraft re-scheduling given a specific disruption that affects the airline operations greatly and causes substantial decrements in profits and levels of service: the temporary closure of airports (see also Thengvall et al., 2001, 2004) The problem of changing the assigned aircraft to specific flights while satisfying existing constraints is addressed by Jarrah (2000), Talluri (1996) and Klincewicz and Rosenwein (1995) A steepest ascent local search heuristic was applied by Love et al (2002) to re-schedule aircraft and it was capable of finding good quality schedules in a short amount of time The problem that is addressed in this paper is discussed in the next section It represents a real-world problem that faces KLM Airlines on a daily basis PROBLEM DESCRIPTION Within KLM, two departments are responsible for the fleet schedule The network planning department produces schedules which are then passed to the operations department who has the responsibility for implementing them and running them on a day-to-day basis These two departments have conflicting objectives The network department aims to produce a schedule which is as cost effective as possible This essentially means maximising aircraft usage by minimising their idle time The operations department prefers schedules that have enough slack to ensure a certain level of robustness This means having as much aircraft idle time as possible Then, the overall aim is to produce a schedule with the right balance between these two conflicting objectives briefly described above The aim for KLM is to introduce a method that checks the robustness of a schedule, from the network department, before it is passed to the operations 384 Bian et al department for implementation One way to achieve this is to run a simulation However, this is seen as too time consuming and other methods are sought to test for the robustness of the schedule KLM flies to over 150 destinations using 97 aircraft Four times a year, a new flight schedule is developed Though the operational feasibility is taken into account to a certain degree during the development process, the aim at that stage is largely to maximise the number of seats that can be sold During schedule development, KLM considers various commercial aspects such as the expected demand per destination and the number of possible transfer connections at Schiphol Airport in Amsterdam The realisation of a flight schedule involves a number of parties As described above, the initial plan is developed by KLM's network planning department The initial plan is based on commercial and strategic insights and long term plans for the fleet composition, cabin crew and baggage handling Two months before the beginning of a schedule plan, the plan is handed over to the operational department, the Operation Control Centre From that moment on they are the owners of the plan and small adaptations have to be evaluated and approved by them This department will try to prevent and solve problems such as emergencies and bottlenecks and, in case of unsolved problems, try to minimize the effects on succeeding flights A final plan is created two weeks before the beginning of the plan where passenger bookings are matched with aircraft capacities In order to monitor the performance of a flight schedule, some critical performance indicators are defined These are The departure and arrival punctuality: that is, the percentage of flights that departed or arrived on time The completion factor: that is, the percentage of accomplished flights These are all flights that were not cancelled The No Connection Passenger factor: that is, the percentage of transfer passengers that missed their connections due to operational problems The Irregularity-rate: that is, the number of bags that were not delivered on time For the punctuality performance indicator the contribution of each of the involved parties is also monitored This introduces the concept of building blocks The whole operational process is divided into sub processes, (the so called building blocks) Each building block is owned by a capacity and service provider, these being Ground Services, Front Office, Air Traffic Management, Engineering and Maintenance, Cabin and Cockpit Crew, Cargo and Operations Control Seven Building Blocks have been established, these are called Measuring the Robustness of Airline Fleet Schedules BB1: Flight m BB2: Arriving aircraft BB3: Layover aircraft BB4: Departing aircraft m BB5: BB5.1 Transferring passengers BB5.2 Transferring baggage BB6: BB6.1 Arriving passengers BB6.2 Arriving baggage BB7: BB7.1 Departing passengers BB7.2 Departing baggage A diagrammatical representation of the temporal sequence of the building blocks and their relationships to each other is shown in Figure These have been delimited in order to provide clear process distinction as well as accountability The doors being opened and closed are the points at which responsibility passes from one capacity and service provider to another The distinction of theJirst door being opened is made because a door can either be the passenger door(s) or a baggage door(s) For example, once a plane has physically landed it is not actually considered to have landed (i.e with responsibility passed to the ground staff) until one (passenger OR baggage) door has been opened In contrast, responsibility changes back again when all doors have been closed, not just one door All these agreements and the flight schedule itself comes together into an operational plan This functions as a contract between Network, Operations Control and the Building Blocks (Capacity & Service Providers) The plan covers an operational plan period of between to months spread over the year It consists of agreements concerning a schedule plan and a capacity plan position for each specific period It contains a demand-driven schedule that has been fully checked with the Building Block representatives (Capacity & Service Providers) and Operations Control by means of an operational check Eventually the agreements enable each provider to deliver an operational performance forecast This could deviate from the targets as laid down in the corresponding Business Plan Each operational plan will be finalized two months (at the latest) prior to each operational plan period The schedule is usually published as an Aircraft Rotation Schedule, which is different each week This is due to the fact that each day many adaptations are made so as to minimise delays For instance, if KLM know that an aircraft will arrive at Schiphol Airport with a delay, they could assign its next flight to Bian et al Arriving aircraft Arriving Figure Figure Building blocks sequence and relationships another aircraft so that that flight can still leave on time Usually, KLM will also need other adaptations to have all flights fit into the Rotation Schedule again When a schedule is first published, KLM not know the exact layout of the Rotation Schedule, so they publish a hypothetical "average" one instead Before a schedule is published, an estimation of the expected punctuality (that is the percentage of "on time" flights) is performed using a simple deterministic model As this model lacks accuracy, a simulation model is currently being developed in order to enable a better forecast This model simulates aircraft movements according to a given schedule The model subjects the schedule to a "stress test" by generating various disruptions such as air traffic congestion, delays during the boarding process or unexpected problems during maintenance Throughout the simulation, a Problem Solver algorithm attempts to resolve delays by swapping flights in the Rotation Schedule, or in extreme cases, by cancelling flights More successful runs of the simulation are considered as better schedules for implementation A simulation, though, has several disadvantages Processing times are usually too long, which limits the number of schedules that can be assessed Also, KLM need to collect a huge amount of data about the processes that are being simulated For the simulation model currently under development they need statistics about the variation in the actual flight duration, the variation in the Measuring the Robustness of Airline Fleet Schedules 387 time it takes to handle an aircraft on the ground (boarding, fuelling, catering, etc), breakdown times of each aircraft type, etc Each of these statistics must constantly be updated to reflect the change in flight routes, working methods, fleet, etc KLM are currently seeking a simpler model that would enable them to make a comparative statement, such as "Of a number of alternative schedules, schedule X will provide the best performance." MODELS FOR THE PROBLEM It was anticipated that there should be some features of any schedule that would be correlated with its performance The first question is then what features should be investigated? A brainstorming session with representatives of KLM led to some suggestions It was expected that the number of potential swaps available to a delayed flight would be an important factor, but measuring this value was not easy In practice, it might also be necessary to undertake a cascade of swaps, so another possible measure of performance would be the length of time andlor the number of swaps needed to restore the schedule to its normal condition However, this is also complicated to determine, although the Problem Solver module of the simulation could be invoked if necessary After further discussion, it was agreed to look at a simpler measure, which could easily be found, and is arguably a surrogate for some of the more complex measures suggested This is the "Aircraft on Ground" (ACOG) measure which gives an indication of the number of aircraft on ground ACOG can be calculated from the number of arriving aircraft, the number of layover aircraft, and the number of departing aircraft Having obtained some features related to this measure, the next step is the identification of a suitable model for purposes of prediction Candidates here include multiple linear regression methods, regression trees, neural nets and other pattern recognition techniques However, the fact that the amount of data available was small meant that data-hungry methods should be avoided if at all possible Thus it was resolved to begin the investigation with traditional statistical methods EXPERIMENTAL RESULTS Eleven schedules were available (SummerIWinter 2000-02, apart from the last 13 weeks of 2002) KLM's operation at Schiphol is such that the activity occurs in four major waves-a deliberate strategy to maximise passengers' opportunities for making onward connections Graphing the number of aircraft available on the ground reveals this pattern clearly These can be counted in two ways: the more accurate picture is obtained by subtracting the lengths of BB2 and BB4, leaving just those aircraft that are actually idle at a given moment 388 Bian et al Table I Performance indicators for departure punctuality and arrival punctuality using two different models For the predictor sets: pl, 1st peak, m, first moment (mean); sd, second moment (standard deviation); sk, third moment (skewness); k, fourth moment (kurtosis) PI Departures Predictor sets R-squared p-value (F-test) PI Arrivals Predictor sets R-squared p-value (F-test) Using BB3 only Using BB2-4 p4m, plsd, plsk, plk 95.6% 0.00032 p2m, p4m, p2sd, p4sd, p3sk 91.6% 0.01028 p4m, plsk, p3sk, p3k 95.2% 0.00042 plm, p4m 84.1% 0.00064 However, it is a simpler calculation to count the whole of the time on the ground from "First Door Open" to "Last Door Closed", which comprises the whole of BBs 2,3 and In the case of European operations, each day is more or less identical, so peaks can be defined quite easily For each peak, the first four moments of the ACOG values were calculated for each day, using both definitions-BB3 and BB234 As days are so alike (apart from the very first day of a new schedule), one day can be selected at random as a representative of a schedule As there are four peaks daily, we have 16 features as inputs, which we need to associate with the performance indicators (PIS) already calculated by KLM The ones used for the models developed here were simply the departure and arrival punctualities: the fraction of planes (of those scheduled) that departed or arrived on time As a first step, correlations were calculated between the PIS and the 16 input variables The six or seven most highly correlated input variables were than used in a stepwise regression procedure (using S-plus) to determine the best balance between parsimony and explanatory power (S-plus uses the Akaike information criterion for this purpose.) Table summarises the models determined by this approach Of interest is the fact that p4m, the mean number of ACOG, is important for all four models, but the other predictors seem to be far less important From KLM's point of view, this does not matter if the predictions are good enough, but from a modeller's perspective we would like to see more consistency However, all models are based on just 11 data points, so perhaps the lack of consistency is not surprising Prediction intervals can easily be obtained on the assumption of Normally distributed errors: these vary from &2% for punctualities in the middle of the range to f3% at the edges Measuring the Robustness of Airline Fleet Schedules Figure Residuals against fitted values for departure punctuality using BB3 only It was surprising that the R-squared values were as high as they were-we were anticipating that a linear model would be too simple, yet it seems quite powerful Of course regression analysis makes certain assumptions about the errors, and it is necessary to check the residuals to see if these assumptions are plausible The plot of residuals against fitted values was obtained for each model; in no case does a systematic pattern seem plausible, and a random scatter is obtained, as shown in Figure The three most extreme outliers (points 5, and 10) are labelled; point might well have been affected by September 11, but possible reasons for the others are not known A smooth has been applied, but its slopes are not very steep, so the assumption that the errors are independent random variables seems plausible Similar graphs were obtained for the other three models QQ plots of the residuals against Normal quantiles were also obtained Figure below shows the same case as in Figure The tails of the distribution in particular are not well fitted, so the assumption that the errors are Normally distributed is perhaps questionable Thus any confidence intervals should be treated cautiously In any case, the response variable in all four models is actually a ratio that is confined to remain between and This means that a better theoretical model would be based on a logistic transformation, since it is theoretically possible that a simple linear model could generate predictions outside the possible range of values For example, we can hardly have a punctuality of greater than loo%! Such a model would also be based on a more plausible probability model than the Normal distribution Bian et al Figure Normal QQ plot for residuals for departure punctuality using BB3 only However, attempts to fit such a model did not produce an improvement A possible explanation is that the data available are all in the region of approximate linearity of the logistic curve Consequently, any attempt to identify the turning points of the curve is likely to be rather speculative In any case, on inspecting the coefficients of the models, it seems unlikely that we would predict bizarre fractions in practice For example, using the most extreme values observed in the first model above would predict only 80% departure punctuality, and in the opinion of KLM's experts it is hard to imagine physical circumstances in which these values could be exceeded simultaneously (there is just not enough space to put many more planes, for example) Thus, despite the attractions of a more plausible theoretical model, the airline is comfortable with the predictive ability of a simpler linear model CONCLUSIONS An analysis of the expected number of aircraft on the ground has been shown to provide a good prediction for the robustness of a given schedule Further refinements are possible-and desirable-but even this work has given the KLM's operations department a better insight into what makes a fleet schedule easier or harder to implement effectively Some of the work that still needs to be done includes an analysis of the effect of day-to-day variations in the schedule-these variations are small, but preliminary work has suggested that the definition of activity peaks needs to be tighter, and the possibility of a day-of-the-week effect should also be explored Furthermore, the schedules Measuring the Robustness of Airline Fleet Schedules 391 examined so far have concentrated only on the European operations, where fleet homogeneity is substantial and diurnal variation is small Incorporating the effects of the inter-continental timetable may lead to some changes in these conclusions Acknowledgments We would like to thank the following bodies for supporting the collaboration described in this paper: rn The Lorentz Centre in Leiden: 45th European Study Group for Mathematics with Industry The EU Mathematics, Computing and Simulation for Industry Network (MACSI-net) rn The Smith Institute for Industrial Mathematics and Systems Engineering References Abara, J (1989), Applying integer linear programming to the fleet assignment problem Interfaces, 19:20-28 Argiiello, M F and Bard, J E (1997), A GRASP for aircraft routing in response to groundings and delays Journal of Combinatorial Optimization, 1:211-228 Bamhart C., Boland N L., Clarke L W., Johnson E L., Nemhauser G L, and Shenoi, R G (1998) Flight string models for aircraft fleeting and routing, Transportation Science, Special Issue on Airline Optimization, 32:208-220 Barnhart C., Lu, E and Shenoi, R (1997), Integrated airline scheduling In Operations Research in the Airlndustry, Gang Yu (Ed.), International Series in Operations Research and Management Science, Vol 9, Kluwer, Dordrecht, pp 384-403 Bamhart, C and Talluri, K (1997) Airline operations research In Design and Operations of Civil and Environmental Engineering Systems, A McGarity and C ReVelle (Eds.), Wiley, New York, pp 435-469 Ciesielski V and Scerri P (1997), An anytime algorithm for scheduling of aircraft landing times using genetic algorithms, Australian Journal of Intelligent Information Processing Systems, 4206213 Ciesielski V and Scerri P (1998), Real time genetic scheduling of aircraft landing times In Proceedings of the 19% IEEE International conference on Evolutionary Computation (ICEC98) IEEE, Piscataway, NJ, pp 360-364 Clarke L W., Hane C A., Johnson E L, and Namhauser G L (2001), Maintenance and crew considerations in fleet assignment, Transportation Science, 3249-260 El Moudani, W and Mora-Camino, E (2000) A dynamic approach for aircraft assignment and maintenance scheduling by airlines, Journal of Air Transport Management, 6:233-237 Etschmaier, M, and Mathaisel, D (1985) Airline scheduling: an overview, Transportation Science, 19:127-138 Feo, T A and Bard, J F (1989) Flight scheduling and maintenance base planning, Management Science, 351415-1432 Bian et al Filar, J A., Manyem, P and White, K (2001) How airlines and airports recover from schedule perturbations: a survey, Annals of Operations Research, 108:315-333 Gopalan, R and Talluri, K T (1998) Mathematical models in airline schedule planning: a survey, Annals of Operations Research, 76:155-185 Hane, C A., Barnhart, C., Johnson, E L., Marsten, R E., Nemhauser, G L and Sigismondi, G (1995) The fleet assignment problem: solving a large-scale integer program, Mathematical Programming, 70:211-232 Hansen, J V (2004) Genetic search methods in air traffic control, Computers and Operations Research, 31:445459 Jarrah, A I (2000) An efficient airline re-fleeting model for the incremental modification of planned fleet assignments, Transportation Science, 34:349-363 Klincewicz, J G., Rosenwein, M B (1995) The airline exception scheduling problem, Transportation Science, 294-16 Love, M., Sorensen, K R., Larsen, J, and Clausen, J (2002) Disruption management for an airline-rescheduling of aircraft, Applications of Evolutionary Computation: Proceedings of the EvoWorkshops 2002, Lecture Notes in Computer Science, Vol 2279, Springer, Berlin, pp 15-324 Mashford, J S, Marksjo, B S (2001) Airline base schedule optimisation by flight network annealing, Annals of Operations Research, 108:293-3 13 Mathaisel, D F X (1997) Decision support for airline schedule planning, Journal of Combinatorial Optimization, 1:251-275 Oussedik, S., Delahaye, D and Schoenauer, M (2000) Flights alternative routes generator by genetic algorithms In Proceedings of the 2000 Congress on Evolutionary Computation (CEC 2000), IEEE, Piscataway, NJ, pp 896-901 Rexing, B., Barnhart, C, Kniker, T., Jarrah, A and Krishnamurthy, N (2000) Airline fleet assignment with time windows, Transportation Science, 34: 1-20 Richter, H (1989) Thirty years of airline operations research, Inter$aces, 19:3-9 Rosenberger, J M., Schaefer, A J., Goldsman, D., Johnson, E L., Kleywegt, A J, and Nemhauser, G L (2003) A stochastic model of airline operations, Transportation Science, 36:4 Ruland, K S (1999) A model for aeromedical routing and scheduling, International Transactions in Operational Research, 657-73 Rushmeier, R A and Kontogiorgis, S A (1997) Advances in the optimization of airline fleet assignment, Transportation Science, 31: 159-169 Sosnowska, D, and Rolim, J (2001) Fleet scheduling optimization: a simulated annealing approach In Practice and Theory ofAutomated Timetabling111 (PATAT2000),E Burke and W Erben (Eds.), Lecture Notes in Computer Science, Vol 2079, Springer, Berlin, pp 227-241 Subrarnanian, R (1994) Coldstart: fleet assignment at Delta Air Lines, Inter$aces, 24:104-120 Talluri, K T (1996) Swapping applications in a daily airline fleet assignment, Transportation Science, 30:237-248 Thengvall, B G., Yu, G and Bard, J F (2001) Multiple fleet aircraft schedule recovery following hub closures, Transportation Research A, 35:289-308 Thengvall, B G., Bard, J F and Yu, G (2004) A bundle algorithm approach for the aircraft schedule recovery problem during hub closures, Transportation Science, to appear Yan, S and Lin, C G (1997) Airline scheduling for the temporary closure of airports, Transportation Science, 31:72-82 Author Index Adenso-Diaz, B Aloulou, Mohamed Ali Aparicio, Joaquim Bian, F Branke, Jiirgen Brauner, Nadia Burke, E K Carmo Silva, Silvio Cesta, Amedeo Cortellessa, Gabriella Do, Van Ha Dror, Moshe Finke, Gerd FronEek, Dalibor Hanne, Thomas Howe, Adele E Indra-Payoong, Nakorn Jain, S Kendall, Graham Koole, G M Kwan, Raymond S K Landa Silva, J D Lemaire, Pierre Leung, Joseph Y.-T Li, Haibing Mattfield, Dirk Christian Meszka, Mariusz Mohd Hussin, Naimah Mulder, J Nickel, Stefan Oddi, Angelo ~ z c a nEnder , Paelinck, M C E Pbridy, Laurent Petrovic, Sanja Pinedo, Michael Policella, Nicola Portmann, Marie-Claude Proll, Les Reeves, C Rivreau, David Rusdi, I Smith, Stephen F Suleman, M Varela, Leonilde Watson, Jean-Paul Whitley, L Darrell Woeginger, Gerhard J Yang, Yong Zinder, Yakov

Ngày đăng: 10/01/2024, 01:21

Tài liệu cùng người dùng

Tài liệu liên quan