1. Trang chủ
  2. » Khoa Học Tự Nhiên

Báo cáo sinh học: " ISSN Article type Submission date Acceptance date Publication date Article URL" pdf

36 203 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 36
Dung lượng 386,06 KB

Nội dung

Journal of Remanufacturing This Provisional PDF corresponds to the article as it appeared upon acceptance Fully formatted PDF and full text (HTML) versions will be made available soon Coping with disassembly yield uncertainty in remanufacturing using sensor embedded products Journal of Remanufacturing 2011, 1:7 doi:10.1186/2210-4690-1-7 Mehmet Ali Ilgin (mehmetali.ilgin@deu.edu.tr) Surendra M Gupta (gupta@neu.edu) Kenichi Nakashima (nakasima@kanagawa-u.ac.jp) ISSN Article type 2210-4690 Research Submission date 13 February 2011 Acceptance date 12 December 2011 Publication date 12 December 2011 Article URL http://www.journalofremanufacturing.com/content/1/1/7 This peer-reviewed article was published immediately upon acceptance It can be downloaded, printed and distributed freely for any purposes (see copyright notice below) For information about publishing your research in Journal of Remanufacturing go to http://www.journalofremanufacturing.com/authors/instructions/ For information about other SpringerOpen publications go to http://www.springeropen.com © 2011 Ilgin et al ; licensee Springer This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/2.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited Coping with disassembly yield uncertainty in remanufacturing using sensor embedded products Mehmet Ali Ilgina, Surendra M Guptab and Kenichi Nakashimac a b Department of Industrial Engineering Dokuz Eylul University Buca 35160, Izmir, Turkey + 90-232-4127601 mehmetali.ilgin@deu.edu.tr Laboratory for Responsible Manufacturing 334 SN Department of MIE Northeastern University, Boston, MA 02115, USA +1-617-3734846 gupta@neu.edu c Department of Information and Creation Kanagawa University Yokohama, 221-8686, Japan +81-454815661 nakasima@kanagawa-u.ac.jp ABSTRACT This paper proposes and investigates the use of embedding sensors in products when designing and manufacturing them to improve the efficiency during their end-of-life (EOL) processing First, separate design of experiments studies based on orthogonal arrays are carried out for conventional products (CPs) and sensor embedded products (SEPs) In order to calculate the response values for each experiment, detailed discrete event simulation models of both cases are developed considering the precedence relationships among the components together with the routing of different appliance types through the disassembly line Then, pair-wise t-tests are conducted to compare the two cases based on different performance measures The results showed that sensor embedded products improve revenue and profit while achieving significant reductions in backorder, disassembly, disposal, holding, testing and transportation costs While the paper addresses the EOL processing of dish washers and dryers, the approach provided could be extended to any other industrial product Keywords: disassembly line, experimental design, sensor embedded products, cost-benefit analysis, discrete event simulation Background Remanufacturing is an industrial process involving the conversion of used products into like-new condition This process starts with the collection and transportation of EOL products to a remanufacturing plant where they are disassembled into parts Following the cleaning and inspection of disassembled parts, repair and replacement operations are performed to deal with defective and worn-out parts Finally, all parts are re-assembled into a remanufactured product which is expected to function like a new product In addition to repair and replacement, some parts or modules may also be upgraded while remanufacturing a product New and stricter government regulations on EOL product treatment and increasing public awareness towards environmental issues have forced many manufacturers to establish specific facilities for remanufacturing operations Being the most environment-friendly and profitable product recovery option, remanufacturing has many advantages over other recovery options such as recycling, repairing or refurbishing In remanufacturing, majority of labor, energy and material values embedded in an EOL product are recovered because the disassembled parts are used as is in the remanufacturing process On the other hand, in recycling, only the material is recovered because the EOL products are simply shredded in a recycling facility Remanufactured products provide superior performance due to replacement of worn-out parts and upgrading of some key parts That is why many manufacturers are willing to give consumers the same warranty provisions as with the new products Although replacement of some parts may occur during the repair or refurbishment option, there is no upgrading Therefore repaired or refurbished products may not provide a superior performance and their warranty provisions are inferior to those of the remanufactured or new products Although remanufacturing is more sustainable than the traditional way of manufacturing where we only use virgin materials to produce new products, it involves more uncertainty In a traditional manufacturing system, there are strict requirements to be obeyed by suppliers regarding the quality, quantity and arrival time of components On the other hand, in remanufacturing, such strict requirements can not be imposed on the quality, quantity and arrival time of EOL products That is why, determination of the condition, type and quantity of a component before actually disassembling it is not possible This increases the uncertainty associated with the used component yield Sensor embedded products which involve sensors embedded into their critical components during the production process can solve this problem by providing information on the condition, type and number of components before actually disassembling them In this study, we consider the application of SEPs in disassembly of components from EOL appliances for remanufacturing The impact of SEPs on system performance is analyzed by performing separate experimental design studies based on orthogonal arrays for conventional products (CPs) and SEPs Detailed discrete event simulation (DES) models of both cases are used to calculate various performance measures under different experimental conditions Then, the results of pairwise t-tests comparing the two cases based on different performance measures are presented The paper is organized as follows In section 2, a review of the issues considered in this study is presented In Section 3, characteristics of the appliance disassembly line are explained Section 4 and Section explain the details and results of the design of experiments study, respectively Finally, some conclusions are presented in Section Literature Review Heuristics, tools or methodologies developed for manufacturing systems can not directly be applied to remanufacturing systems in most cases due to unique characteristics of remanufacturing process Hence, researchers developed novel techniques considering different issues in remanufacturing including logistics [1, 2], operations and production management [3, 4], design for remanufacturing [5-7] and disassembly [8] A complete and up-to-date overview of these studies can be found in the reviews by [9] and [10] Being a crucial step in remanufacturing, disassembly has received increasing attention of researchers Many studies have been presented on different domains of disassembly including sequencing [11, 12] , scheduling [13], disassembly line [14, 15], disassembly line balancing [16, 17], disassembly-toorder systems [18] and design for disassembly [19] Researchers have also addressed the issues related to the disassembly of different type of products e.g., vehicles [20], electronics [21] and consumer appliances [22] For detailed information on the different aspects of disassembly, we refer the reader to a couple of recent books [23, 24] There is a vast amount of literature on the use of sensor-based technologies on after-sale product condition monitoring Starting with the study of [25], different methods of data acquisition from products during product usage were presented by the researchers [26-28] In all of these studies, the main idea is the use of devices with memory to save monitoring data generated during the product usage Although most of these studies focus on the development of SEP models, only few researchers presented a cost-benefit analysis [29] analyzed the trade-off between the higher initial manufacturing cost caused by the use of an electronic data log in products and cost savings from the reuse of used motors [30] improved the cost-benefit analysis of [29] by considering the limited life of a product design They showed that, in that case, servicing provides more reusable components compared to EOL recovery of parts [31] investigated the effectiveness of embedding sensors in computers by comparing several performance measures in the two scenarios-with embedded sensors and without embedded sensors The performance measures considered include average life cycle cost, average maintenance cost, average disassembly cost, and average downtime of a computer However, they not provide a quantitative assessment of the impact of SEPs on these performance measures Moreover, since only one component of a computer (hard disk) was considered, the disassembly setting does not represent the complexity of a disassembly line which is generally used to disassemble EOL computers By extending [31], [32] analyzed the effect of SEPs on the performance of an EOL computer disassembly line which is used to disassemble three components from EOL computers, namely, memory, hard disk and motherboard Due to relatively simple structure of an EOL computer, they did not consider the precedence relationships among the components However, disassembly of a particular component is restricted by one or more components in some products That is why, these products are disassembled according to a route determined based on the precedence relationships In this study, we investigate the quantitative impact of SEPs on different performance measures of a disassembly system The disassembly setting we consider is a disassembly line which is used to disassemble components from EOL dryers and dish washers We also consider the precedence relationships among the components together with the routing of different EOL product types through the disassembly line Appliance Disassembly Process EOL dryers and dish washers (DWs) are disassembled on a five-station disassembly line Physical configuration of the stations in the disassembly line is given in Figure Figure presents the components disassembled at different stations of the disassembly line together with the disassembly sequence and routing of EOL dryers and dish washers According to this figure, EOL dryers travel only in downstream direction since the precedence relationships among their components follow the sequencing of disassembly process However, EOL DWs can travel in both upstream and downstream directions depending on which component is to be disassembled next There are two common components shared by EOL dryers and dish washers, viz., metal cover and electric motor Drum is only included in dryers while timer and circuit board are the components that can be disassembled only from EOL dish washers All disassembled components are demanded except for the metal cover Table presents the precedence relationships among the components Disassembly times at stations, demand inter-arrival times for components and EOL product inter-arrival times are all distributed exponentially Figures and present disassembly flow charts for conventional and sensor embedded appliance disassembly processes, respectively Conventional appliances (ones with no sensors) visit all stations Following the disassembly at each station, components are tested The testing times are normally distributed with the means and standard deviations presented in Table Sensor embedded appliances visit only the stations which are responsible for the disassembly of functional components and their predecessor components In addition, no testing is required for this case because of the sensor information available on the condition of the component Excess products, subassemblies and components are disposed of using a small truck with a load volume of 475 cubic feet Whenever the total volume of the excess product, subassembly and component inventories become equal to the truck volume, the truck is sent to a recycling facility Any product, subassembly or component inventory which is greater than maximum inventory level is assumed to be excess Component volumes are given in Table The volumes of EOL DWs and EOL dryers are taken as 20 cubic feet and 22 cubic feet, respectively A multi kanban system (MKS) developed by [33] is used to control the disassembly line Design of Experiments Study In this section, we compare SEPs against CPs under different experimental conditions The factors and factor levels considered in the experiments are given in Table In this table, weights and prices of components have been estimated based on an online web search of various DW and dryer component sellers in USA Further online web search was performed of various recyclers throughout the USA in order to estimate the steel scrap revenue per pound, disposal cost per pound, disposal cost increase factor for EOL products and scrap revenue decrease factor for EOL products User and service manuals of various DW and dryer manufacturers were employed while estimating the mean disassembly and testing times of components together with small component weight factor Maximum inventory level was estimated by making some trial simulation runs with different maximum inventory level values and investigating the changes in the number of products and components waiting in queues and various cost parameters All the remaining parameter values (viz., non-functional and missing component probabilities, mean demand rates for components, mean arrival rates of products, backorder cost rate, holding cost rate, testing cost per minute and disassembly cost per minute) were estimated based on the values used in the literature A full factorial design with 39 factors requires an extensive number of experiments (viz., 4.05E+18) Therefore, experiments were performed using orthogonal Arrays (OAs) [34] which allow for the determination of main effects by running a minimum number of experiments Specifically, L81 OA was chosen since it requires 81 experiments while accommodating 40 factors with three levels [35] DES models for both cases were developed using Arena 11 [36] to determine profit value together with various cost and revenue parameters for each experiment Animations of the simulation models were built for verification purposes In addition, models’ output results were checked for reasonableness Dynamic plots and counters providing dynamic visual feedback were used to validate the simulation models The replication time for each DES model was 60480 minutes, the equivalent of six months with one eight hour shift per day DES models were replicated 10 times for each OA experiment Flow chart for the demand process is given in Figure Figures and present the flow charts for the disassembly processes initiated by component kanbans for the CPs at the stations other than the last station and at the last station, respectively Figures and present the flow charts of Table Use of experimental design study results to determine the average value of sensors (1) (2) (3) (4) Experiment Profit (SEPs) Profit (CPs) 80 81 Average 892765.57 1478995.73 1476935.85 2050911.70 3063884.18 1801372.32 1748333.24 2259563.26 689984.74 1048313.37 1055570.37 1350521.63 2798715.87 1370260.27 1315398.01 1366333.99 Difference in Profit ((2)-(3)) 202780.84 430682.35 421365.48 700390.07 265168.31 431112.05 432935.24 893229.27 (5) Total Number of EOL Products Collected 16161.60 16173.60 16185.60 32327.60 32339.60 24271.20 24247.20 32320.83 (6) Value of Sensors in an EOL Product ((4)/(5)) 12.55 26.63 26.03 21.67 8.20 17.76 17.86 28.64 Figure Physical configuration of the stations in the disassembly line Figure Sequence of appliance flows on the disassembly line Figure Disassembly flow chart for conventional products Figure Disassembly flow chart for sensor embedded products Figure Operations performed upon the arrival of demand for a component Figure Disassembly operations authorized by a component kanban at stations other than the last station for the case of CPs Figure Disassembly operations authorized by a component kanban at the last station for the case of CPs Figure Disassembly operations authorized by a component kanban at stations other than the last station for the case of SEPs 21 Figure Disassembly operations authorized by a component kanban at the last station for the case of SEPs Figure 10 Disassembly operations authorized by a subassembly kanban for the case of CPs Figure 11 Disassembly operations authorized by a subassembly kanban for the case of SEPs Figure 12 Plots of changes in four performance measures against different levels of two factors for sensor embedded products Figure 13 Plots of changes in four performance measures against different levels of two factors for conventional products 22 STATION Figure STATION STATION STATION STATION Component Buffer for Drum Component Buffer for Motor Assembly Drum Motor Assembly DISPOSAL Metal Cover and Door Dryers DISPOSAL STATION STATION STATION Dish Washers DISPOSAL STATION STATION Timer Circuit Board Component Buffer for Timer Component Buffer for Circuit Board Dryer Flow Dish Washer Flow Disassembled Component Flow Figure STATION Determine the status of Timer Does Timer exist? Yes STATION Disassemble Timer STATION Test Timer STATION Determine the status of Circuit Board No Dish Washer STATION Test Circuit Board START STATION Disassemble Metal Cover STATION Disassemble Circuit Board Yes Type of the Product Does Circuit Board exist? No STATION Determine the status of Motor Does Motor exist? Yes STATION Disassemble Motor STATION Test Motor No Dryer No STATION Determine the status of Drum Figure Does Drum exist? Yes STATION Disassemble Drum STATION Test Drum STOP START Is Drum functional? Yes No Does Drum exist? Yes Dryer Dish Washer Type of Product Does Timer exist? No No STATION Disassemble Metal Cover Yes Is Timer functional? STATION Disassemble Drum STATION Disassemble Metal Cover Yes No STATION Disassemble Timer No No Does Motor exist? Does Metal Cover Exist? No Is Circuit Board functional? Yes Yes Yes Does Circuit Board exist? No Is Motor functional? No Yes Yes STATION Disassemble Metal Cover STATION Disassemble Timer Type of the Product Dryer Does Circuit Board exist? Dish Washer Does Timer exist? Does Drum exist? No No Yes Does Metal Cover Exist? Yes STATION Disassemble Metal Cover No No No Does Timer exist? Yes Yes STATION Disassemble Circuit Board STATION Disassemble Timer Yes STATION Disassemble Drum STATION Disassemble Motor STOP Figure STATION Disassemble Circuit Board Demand for a component arrives Increase holding cost Increase total cost Yes Is there enough component in overflow inventory? Increase backorder cost Increase total cost Satisfy demand with a component from kanban inventory No Satisfy demand with a component from overflow inventory Yes Increase the number of current backorders of the component Is there enough component in kanban inventory? Decrease overflow inventory of the component No Dispose entity Figure Increase holding cost Increase total cost Release component kanban Increase the number of total backorders of the compoenent Decrease kanban inventory of the component Does subassembly to be disassembled come from kanban inventory? Seize component kanban Increase holding cost Increase total cost No Release component kanban Release subassembly kanban Yes Increase holding cost Increase total cost Decrease subassembly kanban inventory Decrease subassembly overflow inventory Use 10% of disassembly time for realizing that component is missing Is component missing? Yes No Disassemble component Increase disassembly cost Increase total cost Test the component Increase testing cost Increase total cost Increase disassembly cost Increase total cost Is there any backorder for this component? Yes Is component functional? No Increase holding cost Increase total cost No Increase backorder cost Increase total cost Yes Yes Is component scrap? Release component kanban Increase component kanban inventory Satisfy the backorder Increase scrap weight Increase scrap volume Decrease the number of current backorders Is total volume of excess inventories equal to truck volume? Release component kanban Yes Dispose excess Inventory Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Increase waste weight Increase waste volume No No Is there a free subassembly kanban? Yes Seize subassembly kanban Send subassembly to subassembly kanban inventory Increase holding cost Increase total cost Increase subassembly kanban inventory Dispose entity No Send subassembly to subassembly overflow inventory Increase holding cost Increase total cost Increase subassembly overflow inventory Is total volume of excess inventories equal to truck volume? Yes Figure No Dispose excess inventory Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Does subassembly to be disassembled come from kanban inventory? Seize component kanban No Is component missing? No Disassemble component Yes Release subassembly kanban Increase holding cost Increase total cost Increase disassembly cost Increase total cost Increase holding cost Increase total cost Decrease subassembly kanban inventory Decrease subassembly overflow inventory Test the component Increase testing cost Increase total cost No Yes Release component kanban Release component kanban Is component scrap? Yes Increase scrap weight Increase scrap volume Is total volume of excess inventories equal to truck volume? Yes Yes Dispose excess Inventory Increase waste weight Increase waste volume No Use 10% of disassembly time for realizing that component is missing No Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Increase disassembly cost Increase total cost Increase component kanban inventory Increase holding cost Increase total cost No Is there any backorder for this component? Send subassembly to cannibalized products inventory Yes Release component kanban Is total volume of excess inventories equal to truck volume? Figure No Yes Decrease the number of current backorders Dispose excess Inventory Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Satisfy the backorder Increase backorder cost Increase total cost Dispose entity Is component functional? Seize component Seize component kanban kanban Does subassembly to be Does subassembly to be disassembled come from disassembled come from kanban inventory? kanban inventory? Yes Release subassembly Release subassembly kanban kanban Increase holding cost Increase holding cost Increase total cost Increase total cost Decrease Decrease subassembly kanban subassembly kanban inventory inventory Seize subassembly Seize subassembly kanban kanban No Decrease Decrease subassembly subassembly overflow inventory overflow inventory Increase holding cost Increase holding cost Increase total cost Increase total cost Send subassembly to Send subassembly to subassembly kanban subassembly kanban inventory inventory Disassemble Disassemble component component Increase disassembly cost Increase disassembly cost Increase total cost Increase total cost Is there any backorder for this component? No Yes Increase holding cost Increase total cost Is there a free Is there a free subassembly kanban? subassembly kanban? Increase component kanban inventory Yes Increase holding cost Increase holding cost Increase total cost Increase total cost No Increase subassembly Increase subassembly kanban inventory kanban inventory Increase backorder cost Increase total cost Send subassembly to Send subassembly to subassembly subassembly overflow inventory overflow inventory Satisfy the backorder Increase holding cost Increase holding cost Increase total cost Increase total cost Decrease the number of current backorders Increase Increase subassembly subassembly overflow inventory overflow inventory Release component kanban Is total volume of excess Is total volume of excess inventories equal to truck inventories equal to truck volume? volume? Dispose Entity Dispose Entity No Yes Dispose excess Dispose excess inventory inventory Figure Increase scrap revenue Increase scrap revenue Increase disposal cost Increase disposal cost Increase transportation cost Increase transportation cost Increase total cost Increase total cost Seize component kanban Does subassembly to be disassembled come from kanban inventory? Yes No Disassemble component Increase disassembly cost Increase total cost Release subassembly kanban Increase holding cost Increase total cost Is there any backorder for this component? Increase holding cost Increase total cost Decrease subassembly kanban inventory Decrease subassembly overflow inventory Yes Increase holding cost Increase total cost Increase component kanban inventory No Release component kanban Send subassembly to cannibalized products inventory Decrease the number of current backorders Is total volume of excess inventories equal to truck volume? No Figure Satisfy the backorder Yes Dispose excess Inventory Increase backorder cost Increase total cost Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Dispose entity Does subassembly to be disassembled come from kanban inventory? Seize subassembly kanban Yes Increase holding cost Increase total cost No Yes Is component missing? No Disassemble component Yes Decrease subassembly kanban inventory Decrease subassembly overflow inventory Increase disassembly cost Increase total cost Is component functional? No Increase holding cost Increase total cost Release subassembly kanban Yes Is there any backorder for this component? Increase testing cost Increase total cost Test the component Yes Increase backorder cost Increase total cost Decrease the number of current backorders Satisfy the backorder No Is component scrap? No Yes Increase waste weight Increase waste volume Is there a free component kanban? Increase scrap weight Increase scrap volume Yes Seize component kanban Increase holding cost Increase total cost No Increase holding cost Increase total cost Use 10% of disassembly time for realizing that component is missing Increase component kanban inventory Is total volume of excess inventories equal to truck volume Yes Increase component overflow inventory Dispose excess inventory Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Increase holding cost Increase total cost Increase subassembly kanban inventory No Increase disassembly cost Increase total cost Figure 10 Send subassembly to subassembly kanban inventory Dispose entity Does subassembly to be disassembled come from kanban inventory? Seize subassembly kanban Yes Release subassembly kanban Increase holding cost Increase total cost Decrease subassembly kanban inventory Disassemble component No Increase holding cost Increase total cost Increase disassembly cost Increase total cost Is component functional? Decrease subassembly overflow inventory Increase backorder cost Increase total cost Yes Satisfy the backorder Decrease the number of current backorders Yes Is there any backorder for this component? No Is component scrap? Seize component kanban Yes No Increase holding cost Increase total cost Increase component kanban inventory Is there a free component kanban? Yes Increase holding cost Increase total cost No Increase component overflow inventory No Increase scrap weight Increase scrap volume Increase waste weight Increase waste volume Is total volume of excess inventories equal to truck volume? Yes Dispose excess inventory No Send subassembly to subassembly kanban inventory Figure 11 Increase holding cost Increase total cost Increase subassembly kanban inventory Dispose entity Increase scrap revenue Increase disposal cost Increase transportation cost Increase total cost Profit Disposal Cost Figure 12 Disassembly Cost Backorder Cost Profit Disposal Cost Figure 13 Disassembly Cost Backorder Cost ... precedence relationships among the components together with the routing of different appliance types through the disassembly line Then, pair-wise t-tests are conducted to compare the two cases... quality, quantity and arrival time of EOL products That is why, determination of the condition, type and quantity of a component before actually disassembling it is not possible This increases... during the production process can solve this problem by providing information on the condition, type and number of components before actually disassembling them In this study, we consider the

Ngày đăng: 18/06/2014, 18:20

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN