Trang 11 Remove the starter Refer to “Starter” in this section.
2 Pinion clearance inspection
D Disconnect the starter motor terminal M (1)
D Connect the 12-volt battery lead to the starter tor terminals M and S
mo-Notice: Complete the testing in a minimum amount of
time to prevent overheating and damaging the solenoid.(in 10 seconds)
D102E702
D Switch on to move the pinion gear (2)
D Now check the clearance between the pinion andthe stopper with the filler gauge (3)
D If the clearance does not fall within the limits,check for improper installation and replace all wornparts
D102E703
3 Magnetic switch pull-in test
D Disconnect the starter motor terminal M (1)
D Connect the 12-volt battery lead to the starter tor terminals M and S
mo-Notice: Complete the testing in a minimum amount of
time to prevent overheating and damaging the solenoid.(in 10 seconds)
Trang 2D Inspect the pinion gear’s moving to the outside (2)
D If the pinion gear does not move outside, replacethe magnetic switch
D102E705
4 Solenoid hold-in test
D Disconnect the starter motor terminal M (1)
D Connect the 12-volt battery lead to the starter tor terminal S and body
mo-Notice: Complete the testing in a minimum amount of
time to prevent overheating and damaging the solenoid
D102E706
D Check the pinion gear’s moving to the outside (2)
D If the pinion gear move to the inside, the circuit isopen Replace the magnetic switch
5 Solenoid return test
D Disconnect the starter motor terminal M (1)
D Connect the 12-volt battery lead to the starter tor terminal S and body
mo-Notice: Complete the testing in a minimum amount of
time to prevent overheating and damaging the solenoid
Trang 3D Check the returning speed of pinion gear (2)
If the returning speed is fast, the operation is mal
nor-D Replace the solenoid if the operation is abnormal
D102E709
5 No-road test
D Connect the 12-volt battery lead to the starter cuit
cir-D Connect the current and the voltage (1)
D Install the starter motor rpm gage (2)
D Start the starter motor with the switch on (3)
D Measure the speed of pinion gear and the current
D If the measurement satisfy the limit, the starter tor is normal
1 Remove the starter contact end frame
D Remove the through-bolts (1)
D Remove the contact end frame bolts (2)
D Remove the frame with the spacer (3)
Trang 42 Remove the brush holder assembly
D Remove the starter motor terminal M nut (1)
D Remove the brush holder assembly (2)
D102E713
3 Remove the field frame assembly from the armatureset (1)
D102E714
4 Remove the solenoid assembly
D Remove the solenoid screws (1)
D Remove the magnetic switch (2)
D Remove the spring (3)
5 Remove the armature set and solenoid from the
start-er housing
D Remove the armature set (1)
D Remove the rubber sealer (2)
D Remove the shift lever plate (3)
D Remove the shift lever (4)
D Remove the solenoid (5)
Trang 5Inspection / Measurement (After the Overhaul)
1 Ground test for armature coil
D Inspect the insulation between commutator and mature coil using the voltmeter
ar-D Replace the armature assembly if necessary
D102E717
2 Short circuit test for armature coil
D If test equipment is available, check the armaturefor short circuit by placing it on a growler, and hold-ing back a saw blade over the armature core whilethe armature is rotated If the saw blade vibrates,replace the armature
D102E718
3 Open circuit test for armature coil
D Check the continuity between the commutatorbars using multimeter
D Replace the armature assembly if necessary
4 Inspect the brushes wear
D Inspect the brushes, the pop-out springs and thebrush holder for wear and damage Replace thebrushes, if necessary
a Brushes wear limit
Desciption Standard Limit
Trang 69-12 NSm
4-6 NSm
Assembly Procedure
1 Install in the reverse order of removal
2 Install the bolts / nuts
2 Remove the front bracket and rear bracket
D Remove the through-bolts (1)
D102E722
D Pry front bracket downwards using a screwdriver(2)
D Separate the front bracket and rear bracket (3)
3 Remove the pulley and rotor assembly from the frontbracket
D Cover the rotor with the cloth (1)
D Place the pulley upwards and vice the rotor (2)
D Remove the pulley nut (3)
D Remove the pulley (4)
Trang 74 Remove the front bracket, rotor and collar
D Remove the collar (large) (1)
D Remove the rotor from the front bracket (2)
D Remove the collar (small) from the rotor shaft (3)
D102E725
5 Remove the front bearing
D Remove the support plate screws (1)
D Remove the plate (2)
D Remove the front bearing using the press (3)
D102E726
6 Remove the battery positive terminal nut from therear bracket
D Remove the battery position terminal nut (1)
D Remove the washer (2)
7 Remove the stator assembly from the rear bracket
D Remove the rectifier screw (1)
D Remove the brush holder and regulator assemblyscrews (2)
D Remove the stator assembly with the rectifier /brush holder / regulator (3)
Trang 8con-D Remove the stator and rectifier connections (2).
Notice: If the stator connections are welded, melt the
lead Avoid overheating as it can damage the diodes
D102E729
Inspection / Measurement
1 Inspect the rotor assembly
D Test the rotor for an open circuit by using the meter (1) Replace the rotor if necessary
D Replace the rotor if necessary
D Test the rotor for open or ground circuit by usingthe ohmmeter (3) Replace the rotor if necessary
2 Inspect the stator
D Test the stator for an open circuit by using the meter (1) Replace the stator if necessary
Trang 9D Test the stator for open or ground circuit by usingthe ohmmeter (2) Replace the starter if necessary
D102E733
3 Inspect the rectifier
D Positive rectifier test:
Inspect the open circuit for stator coil lead nals using the ohmmeter (1)
termi-Replace the rectifier if necessary
D102E734
D Negative rectifier test:
Inspect the open circuit for stator coil lead nals using the ohmmeter (2)
termi-Replace the rectifier if necessary
4 Inspect trio diodes
D Inspect the open circuit for trio diodes using theohmmeter (1)
D Replace the heat sink if necessary (a)
Trang 105 Inspect the brush wear
D If the brush wear exceeds the specified valve (a),replace the brush
Desciption Standard Limit
Brushes wear 18.5 (0.73) 13.5 (0.53)
D102E737
Assembly Procedure
1 Install in the reverse order of removal
D Assemble the stator assembly into the rear bracketand rotor assembly
Trang 112 Remove the cover from the generator.
D Remove the battery positive terminal nut (1)
D Remove the cover (2)
D Remove the rectifier bolts (2)
D Remove the rectifier / regulator screw (3)
D Remove the brush holder / regulator screw (4)
D Remove the regulator screw (5)
D Remove the regulator / brush holder / rectifier sembly (6)
Trang 124 Remove the regulator / brush holder / rectifier
D Remove the rectifier and regulator connection (1)
D Remove the regulator and brush holder connection(2)
D Visibly inspect the rectifier / regulator / brush
hold-er for damage or broken
D Remove the shield (1)
D Remove the through-bolts (2)
D Remove the frame from the drive end bracket (3)
D102E746
6 Remove the pulley and rotor assembly from the driveend bracket
D Cover the rotor with the cloth (1)
D Place the pulley upwards and vice the rotor (2)
D Remove the pulley nut (3)
D Remove the pulley (4)
7 Remove the drive end bracket, rotor and space
D Remove the collar (1)
D Remove the rotor from the driver end bracket (2)
D Remove the collar from the rotor shaft (3)
D Inspect the front bearing for corrosion, wear, noisyand other damage (4)
Trang 138 Remove the stator assembly from the frame
D Remove the remains after the welding
D Remove the stator assembly (2)
D102E749
Inspection / Measurement
1 Inspect the rotor assembly
D Test the rotor coil for an open circuit by using theohmmeter The reading should be sufficiently low,
or the rotor must be replaced (1)
D Inspect the fan blade for damage
2 Inspect the stator
D Test the rotor for an open circuit by using the meter The reading should be sufficiently low, orthe stator must be replaced (1)
Trang 14D Test the stator for open or ground circuits by usingthe ohmmeter The reading should be sufficientlyhigh, or the stator must be replaced (2)
D102E753
3 Inspect the rectifier
D Positive rectifier test:
Inspect the open circuit for stator coil lead nals using the ohmmeter (1)
termi-Replace the rectifier if necessary
D102E754
D Negative rectifier test:
Inspect the open circuit for stator coil lead nals using the ohmmeter (2)
termi-Replace the rectifier if necessary
4 Inspect trio diodes
D Inspect the open circuit for trio diodes using theohmmeter (1)
Replace the heat sink if necessary (a)
Trang 155 Inspect the brush wear
D If the brush wear exceeds the specified value, place the brush
re-a Brush wear limit
Desciption Standard Limit
Brushes wear 20 (0.79) 14 (0.55)
D12E757A
9–12 NSm
Assembly Procedure
1 Install in the reverse order of removal
2 Install the screws / nuts / bolts
Trang 16D Remove the bolts (1).
D Remove the distributor cap (2)
D Remove the seal (3)
D Remove the rotor (4)
D102E762
D Inspect the cap for cracks or damage (a)
D Inspect the cap electrode for damage / wear or bon traces (b)
car-D Inspect the rotor for damage or carbon traces (c)
3 Remove the inner / outer cover from the distributorhousing
D Remove the outer cover (1)
D Remove the screws (2)
D Remove the inner cover (3)
Trang 174 Remove the optical sensor cover and adaptor fromthe distributor housing
D Remove the screw (1)
D Remove the adaptor (2)
D Remove the screws (3)
D Remove the cover (4)
D Remove the gasket (5)
D102E765
5 Remove the optical sensor unit from the distributorhousing
D Carefully remove the disc wheel (1)
D Remove the bushing (2)
D Remove the screws (3)
D Remove the optical sensor unit plate (4)
D Remove the optical sensor unit (5)
D102E766
6 Remove the bearing plate from the distributor ing
hous-D Remove the screws (1)
D Remove the bearing plate (2)
7 Remove the coupling, shaft and bearing from the tributor housing
dis-D Remove the coupling (1)
D Remove the shaft using the press (2)
D Remove the bearing (3)
Trang 18Assembly Procedure
1 Install in the reverse order of removal
D Lubricate the shaft with clean engine oil
Trang 19SCHEMATIC AND ROUTING DIAGRAMS
STARTING SYSTEM
Trang 20CHARGING SYSTEM
Trang 21IGNITION SYSTEM CIRCUIT – TYPICAL
Trang 22IGNITION SYSTEM CIRCUIT – EURO III
Trang 23STARTER SPECIFICATIONS
Application Description Unit Standard Limit
No Load Test @ 9 voltsDrive Pinion Speed
ARPM
1502,000
–
Brushes Length mm (in.) 11.3–11.5
(0.445–0.453)
7.0–7.25(0.275–0.285)
GENERATOR SPECIFICATIONS
Application Description Unit Standard Limit
A-TypeB-Type
14.3–4.9
–
Brushes Length
A-TypeB-Type
A-TypeB-Type
12V, 65A
–
IGNITION SYSTEM SPECIFICATIONS
Application Description Unit Standard Limit
Magnetic Type
–
Second Coil Resistance KΩ 12.1 $15% –
Trang 24BATTERY SPECIFICATIONS
Application Description Unit Standard Limit
FASTENER TIGHTENING SPECIFICATIONS
Application NSm Lb-Ft Lb-In
Battery Retainer Clamp–to–Battery Rod Nuts 6–8 – 53–71
Generator Brush Holder / Rectifier Screw 9–12 – 80–106Generator Belt Tension Adjusting Bolt 18–28 13–21 –
Generator Lower Bracket–to–Generator Bolt/Nut 18–28 13–21 –