1 Remove the starter Refer to “Starter” in this section.

2 Pinion clearance inspection

D Disconnect the starter motor terminal M (1)

D Connect the 12-volt battery lead to the starter tor terminals M and S

mo-Notice: Complete the testing in a minimum amount of

time to prevent overheating and damaging the solenoid.(in 10 seconds)

D102E702

D Switch on to move the pinion gear (2)

D Now check the clearance between the pinion andthe stopper with the filler gauge (3)

D If the clearance does not fall within the limits,check for improper installation and replace all wornparts

D102E703

3 Magnetic switch pull-in test

D Disconnect the starter motor terminal M (1)

D Connect the 12-volt battery lead to the starter tor terminals M and S

mo-Notice: Complete the testing in a minimum amount of

time to prevent overheating and damaging the solenoid.(in 10 seconds)

Trang 2

D Inspect the pinion gear’s moving to the outside (2)

D If the pinion gear does not move outside, replacethe magnetic switch

D102E705

4 Solenoid hold-in test

D Disconnect the starter motor terminal M (1)

D Connect the 12-volt battery lead to the starter tor terminal S and body

mo-Notice: Complete the testing in a minimum amount of

time to prevent overheating and damaging the solenoid

D102E706

D Check the pinion gear’s moving to the outside (2)

D If the pinion gear move to the inside, the circuit isopen Replace the magnetic switch

5 Solenoid return test

D Disconnect the starter motor terminal M (1)

D Connect the 12-volt battery lead to the starter tor terminal S and body

mo-Notice: Complete the testing in a minimum amount of

time to prevent overheating and damaging the solenoid

Trang 3

D Check the returning speed of pinion gear (2)

If the returning speed is fast, the operation is mal

nor-D Replace the solenoid if the operation is abnormal

D102E709

5 No-road test

D Connect the 12-volt battery lead to the starter cuit

cir-D Connect the current and the voltage (1)

D Install the starter motor rpm gage (2)

D Start the starter motor with the switch on (3)

D Measure the speed of pinion gear and the current

D If the measurement satisfy the limit, the starter tor is normal

1 Remove the starter contact end frame

D Remove the through-bolts (1)

D Remove the contact end frame bolts (2)

D Remove the frame with the spacer (3)

Trang 4

2 Remove the brush holder assembly

D Remove the starter motor terminal M nut (1)

D Remove the brush holder assembly (2)

D102E713

3 Remove the field frame assembly from the armatureset (1)

D102E714

4 Remove the solenoid assembly

D Remove the solenoid screws (1)

D Remove the magnetic switch (2)

D Remove the spring (3)

5 Remove the armature set and solenoid from the

start-er housing

D Remove the armature set (1)

D Remove the rubber sealer (2)

D Remove the shift lever plate (3)

D Remove the shift lever (4)

D Remove the solenoid (5)

Trang 5

Inspection / Measurement (After the Overhaul)

1 Ground test for armature coil

D Inspect the insulation between commutator and mature coil using the voltmeter

ar-D Replace the armature assembly if necessary

D102E717

2 Short circuit test for armature coil

D If test equipment is available, check the armaturefor short circuit by placing it on a growler, and hold-ing back a saw blade over the armature core whilethe armature is rotated If the saw blade vibrates,replace the armature

D102E718

3 Open circuit test for armature coil

D Check the continuity between the commutatorbars using multimeter

D Replace the armature assembly if necessary

4 Inspect the brushes wear

D Inspect the brushes, the pop-out springs and thebrush holder for wear and damage Replace thebrushes, if necessary

a Brushes wear limit

Desciption Standard Limit

Trang 6

9-12 NSm

4-6 NSm

Assembly Procedure

1 Install in the reverse order of removal

2 Install the bolts / nuts

2 Remove the front bracket and rear bracket

D Remove the through-bolts (1)

D102E722

D Pry front bracket downwards using a screwdriver(2)

D Separate the front bracket and rear bracket (3)

3 Remove the pulley and rotor assembly from the frontbracket

D Cover the rotor with the cloth (1)

D Place the pulley upwards and vice the rotor (2)

D Remove the pulley nut (3)

D Remove the pulley (4)

Trang 7

4 Remove the front bracket, rotor and collar

D Remove the collar (large) (1)

D Remove the rotor from the front bracket (2)

D Remove the collar (small) from the rotor shaft (3)

D102E725

5 Remove the front bearing

D Remove the support plate screws (1)

D Remove the plate (2)

D Remove the front bearing using the press (3)

D102E726

6 Remove the battery positive terminal nut from therear bracket

D Remove the battery position terminal nut (1)

D Remove the washer (2)

7 Remove the stator assembly from the rear bracket

D Remove the rectifier screw (1)

D Remove the brush holder and regulator assemblyscrews (2)

D Remove the stator assembly with the rectifier /brush holder / regulator (3)

Trang 8

con-D Remove the stator and rectifier connections (2).

Notice: If the stator connections are welded, melt the

lead Avoid overheating as it can damage the diodes

D102E729

Inspection / Measurement

1 Inspect the rotor assembly

D Test the rotor for an open circuit by using the meter (1) Replace the rotor if necessary

D Replace the rotor if necessary

D Test the rotor for open or ground circuit by usingthe ohmmeter (3) Replace the rotor if necessary

2 Inspect the stator

D Test the stator for an open circuit by using the meter (1) Replace the stator if necessary

Trang 9

D Test the stator for open or ground circuit by usingthe ohmmeter (2) Replace the starter if necessary

D102E733

3 Inspect the rectifier

D Positive rectifier test:

Inspect the open circuit for stator coil lead nals using the ohmmeter (1)

termi-Replace the rectifier if necessary

D102E734

D Negative rectifier test:

Inspect the open circuit for stator coil lead nals using the ohmmeter (2)

termi-Replace the rectifier if necessary

4 Inspect trio diodes

D Inspect the open circuit for trio diodes using theohmmeter (1)

D Replace the heat sink if necessary (a)

Trang 10

5 Inspect the brush wear

D If the brush wear exceeds the specified valve (a),replace the brush

Desciption Standard Limit

Brushes wear 18.5 (0.73) 13.5 (0.53)

D102E737

Assembly Procedure

1 Install in the reverse order of removal

D Assemble the stator assembly into the rear bracketand rotor assembly

Trang 11

2 Remove the cover from the generator.

D Remove the battery positive terminal nut (1)

D Remove the cover (2)

D Remove the rectifier bolts (2)

D Remove the rectifier / regulator screw (3)

D Remove the brush holder / regulator screw (4)

D Remove the regulator screw (5)

D Remove the regulator / brush holder / rectifier sembly (6)

Trang 12

4 Remove the regulator / brush holder / rectifier

D Remove the rectifier and regulator connection (1)

D Remove the regulator and brush holder connection(2)

D Visibly inspect the rectifier / regulator / brush

hold-er for damage or broken

D Remove the shield (1)

D Remove the through-bolts (2)

D Remove the frame from the drive end bracket (3)

D102E746

6 Remove the pulley and rotor assembly from the driveend bracket

D Cover the rotor with the cloth (1)

D Place the pulley upwards and vice the rotor (2)

D Remove the pulley nut (3)

D Remove the pulley (4)

7 Remove the drive end bracket, rotor and space

D Remove the collar (1)

D Remove the rotor from the driver end bracket (2)

D Remove the collar from the rotor shaft (3)

D Inspect the front bearing for corrosion, wear, noisyand other damage (4)

Trang 13

8 Remove the stator assembly from the frame

D Remove the remains after the welding

D Remove the stator assembly (2)

D102E749

Inspection / Measurement

1 Inspect the rotor assembly

D Test the rotor coil for an open circuit by using theohmmeter The reading should be sufficiently low,

or the rotor must be replaced (1)

D Inspect the fan blade for damage

2 Inspect the stator

D Test the rotor for an open circuit by using the meter The reading should be sufficiently low, orthe stator must be replaced (1)

Trang 14

D Test the stator for open or ground circuits by usingthe ohmmeter The reading should be sufficientlyhigh, or the stator must be replaced (2)

D102E753

3 Inspect the rectifier

D Positive rectifier test:

Inspect the open circuit for stator coil lead nals using the ohmmeter (1)

termi-Replace the rectifier if necessary

D102E754

D Negative rectifier test:

Inspect the open circuit for stator coil lead nals using the ohmmeter (2)

termi-Replace the rectifier if necessary

4 Inspect trio diodes

D Inspect the open circuit for trio diodes using theohmmeter (1)

Replace the heat sink if necessary (a)

Trang 15

5 Inspect the brush wear

D If the brush wear exceeds the specified value, place the brush

re-a Brush wear limit

Desciption Standard Limit

Brushes wear 20 (0.79) 14 (0.55)

D12E757A

9–12 NSm

Assembly Procedure

1 Install in the reverse order of removal

2 Install the screws / nuts / bolts

Trang 16

D Remove the bolts (1).

D Remove the distributor cap (2)

D Remove the seal (3)

D Remove the rotor (4)

D102E762

D Inspect the cap for cracks or damage (a)

D Inspect the cap electrode for damage / wear or bon traces (b)

car-D Inspect the rotor for damage or carbon traces (c)

3 Remove the inner / outer cover from the distributorhousing

D Remove the outer cover (1)

D Remove the screws (2)

D Remove the inner cover (3)

Trang 17

4 Remove the optical sensor cover and adaptor fromthe distributor housing

D Remove the screw (1)

D Remove the adaptor (2)

D Remove the screws (3)

D Remove the cover (4)

D Remove the gasket (5)

D102E765

5 Remove the optical sensor unit from the distributorhousing

D Carefully remove the disc wheel (1)

D Remove the bushing (2)

D Remove the screws (3)

D Remove the optical sensor unit plate (4)

D Remove the optical sensor unit (5)

D102E766

6 Remove the bearing plate from the distributor ing

hous-D Remove the screws (1)

D Remove the bearing plate (2)

7 Remove the coupling, shaft and bearing from the tributor housing

dis-D Remove the coupling (1)

D Remove the shaft using the press (2)

D Remove the bearing (3)

Trang 18

Assembly Procedure

1 Install in the reverse order of removal

D Lubricate the shaft with clean engine oil

Trang 19

SCHEMATIC AND ROUTING DIAGRAMS

STARTING SYSTEM

Trang 20

CHARGING SYSTEM

Trang 21

IGNITION SYSTEM CIRCUIT – TYPICAL

Trang 22

IGNITION SYSTEM CIRCUIT – EURO III

Trang 23

STARTER SPECIFICATIONS

Application Description Unit Standard Limit

No Load Test @ 9 voltsDrive Pinion Speed

ARPM

1502,000

Brushes Length mm (in.) 11.3–11.5

(0.445–0.453)

7.0–7.25(0.275–0.285)

GENERATOR SPECIFICATIONS

Application Description Unit Standard Limit

A-TypeB-Type

14.3–4.9

Brushes Length

A-TypeB-Type

A-TypeB-Type

12V, 65A

IGNITION SYSTEM SPECIFICATIONS

Application Description Unit Standard Limit

Magnetic Type

Second Coil Resistance KΩ 12.1 $15% –

Trang 24

BATTERY SPECIFICATIONS

Application Description Unit Standard Limit

FASTENER TIGHTENING SPECIFICATIONS

Application NSm Lb-Ft Lb-In

Battery Retainer Clamp–to–Battery Rod Nuts 6–8 – 53–71

Generator Brush Holder / Rectifier Screw 9–12 – 80–106Generator Belt Tension Adjusting Bolt 18–28 13–21 –

Generator Lower Bracket–to–Generator Bolt/Nut 18–28 13–21 –