BIỆN PHÁP BỌC CÁCH NHIỆT ỐNG GIÓ VÀ ỐNG NƯỚC

41 1 0
BIỆN PHÁP BỌC CÁCH NHIỆT ỐNG GIÓ VÀ ỐNG NƯỚC

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

MOS, Biện pháp bọc cách nhiệt hệ ống gió và hệ ống nước, MOS for Duct and Pipe Insulation, Cách bọc cách nhiệt hệ ống gió và ống nước trong các Tòa nhà cao tầng, nhà máy, cao ốc văn phòng, cách thi công cách nhiệt ống gió, cách thi công cách nhiệt ống nước

PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION METHOD STATEMENT FOR MVAC DUCT & PIPE INSULATION Prepare by : SUB CONTRACTOR NAME: Hong Soon Min DATE : 11-April-2015 Submission Ref :PSC-HK-MS-M-0006 Rev-00 Checked by : Approved by : Consulted by: POSCO NAME: POSCO NAME: NAME: DATE : DATE : DATE : Date: 08-April-15 Revision: Rev-00 MVAC Services Page HKL PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION Table of Contents INTRODUCTION 1.1 1.2 1.3 Purpose Scope Exclusions .3 GENERAL 2.1 Program 2.2 Location Address 2.3 Approvals 2.4 Labor resources 2.5 Communications 2.6 Site Resources Required 2.7 Temporary material .4 2.8 Protection 2.9 Equipment/Tools 2.10 Hot works 2.11 Confined space works .6 2.12 Emergency & Safety Equipment .6 2.13 Materials required for installation 2.14 Schedule of drawings 2.15 Schedule of inspection 2.16 Attendees 2.17 Safety Briefing 2.18 Mitigation of Risk .10 Actual Works Method Statement 11 3.1 Delivery and Store .11 3.2 Installation (PIPE) .11 3.3 Jointing of piping 20 3.4 Welding .21 3.5 Setting to work .24 3.6 Testing 24 3.7 T&C Register 24 3.8 Reports 25 Appendix 27 4.1 Certificate of calibration 27 4.2 Instrument catalogue and manual book .27 4.3 Certificate of welding ………………… .29 MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -1 INTRODUCTION 1.1 Purpose The purpose of this Method statement is to bring the requirements from the technical specifications, drawings together in one convenient document for reference by the drafters, factory, site installers, QA/QC and all parties who are concerned with the project And this methodology to be followed for the insulation of the Duct Work and Air Conditioning System Pipe Work 1.2 Scope This is applicable to the insulation of all chilled water pipe, condensate water pipe and duct as set out in the project technical brief and the approved drawing 1.3 Exclusions Not application GENERAL 2.1 Program 2.1.1 Ensure that the shop drawing used for the references at site is approved for construction 2.1.2 Ensure that designated manpower to conduct works at site must be properly trained and well oriented by the safety engineer 2.1.3 All equipments, tools and mobile scaffolding to be used must be inspected and approved by authorized safety engineer at site 2.1.4 All staffs associated with the works shall be sufficiently experienced 2.1.5 When the workers climb up the working platform, ladder, his hands must be free 2.1.6 All materials to be used at site must be properly secured and clean 2.1.7 Working period to base on civil work and piping installation schedule which will be attached after getting approval (Waiting for approval) 2.2 LOCATION – ADDRESS Application for Basement and all high floors 2.3 APPROVALS Materials of submission (Waiting for submission & approval) Shop drawing (Waiting for submission & approval) MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION 2.4 LABOUR RESOURCES The pipe team will coordinate and carry out as below organization chart 2.5 Communications Office mobile phone or walkie-talkie will be used during working time 2.6 SITE RESOURCES REQUIRED Temporary fire protection equipment Site electric panel should be needed as site condition 2.7 TEMPORARY MATERIALS Materials cover needs to be prepared on the floor and cover pipe when needed 2.8 PROTECTION Materials cover needs to be prepared on the floor and cover pipe when needed MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION 2.9 EQUIPMENT/TOOLS Ensure the availability of equipment and tools provision for Duct and AC Piping insulation works as follows: Tape measure or folding rule Chalk Silver ink marker pen Long blade knife Short blade knife Clean rug and cloth Tee square Scissors Large divider 10 Calipers 11 Mitre box cutting angles 13 Whetstone (knife sharpener) for 12 Caution Tape 14 Brush with short firm bristles 2.10 HOT WORKS Not application MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -2.11 CONFINED SPACE WORKS Not application 2.12 EMERGENCY & SAFETY EQUIPMENT 1) Safety helmet 2) Safety shoes 3) Safety uniform 4) Hand gloves MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -2.13 MATERIALS REQUIRED FOR INSULATION Insulation materials as Insulation sheet, Insulation tube, Insulation glue, Insulation tape Insulation sheet Insulation tube Insulation glue Canvas sheet Insulation tape 2.14 SCHEDULE OF DRAWINGS Refer to shop drawing layout of floors as below: 2.15 SCHEDULE OF INSPECTION/T&C FORM Refer to ITP form as the attached file in below 2.16 ATTENDEES 2.16.1 Sub-contractor manager 2.16.2 Sub-contractor site manager 2.16.3 Main contractor MEP coordinator MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -2.16.4 Main contractor mechanical engineer 2.16.5 HKL M&E manager 2.17 SAFETY BRIEFING 2.17.1 Safety shall be in first priority during construction, safety staff shall be present on site all the time to supervise and to remind workers to observe safety requirement Stop work order shall enforce once its dose not meet the safety requirements 2.17.2 Safety shall conform strictly observed All workers and staff on site shall be oriented of safety requirements All safety equipment such as cloths , shoes, helmet , gloves , safety belt should provide and regularly checked during construction 2.17.3 The engineer shall inspect all subcontractor tools prior to be used on site 2.17.4 Safety Supervisor shall be present for all the safety site inspection 2.17.5 For the safety of worker, grounding wire for the electric ARC process must be provided and wet cloths, protective glasses, long sleeve cloth must be imposed to worker 2.17.6 Fire extinguisher shall be provided at welding area and safety provision must done to ensure usage workability 2.17.7 Safety working with Scaffolding 2.17.7-1 All scaffolds must be erected under the supervision of a competent and experienced person- usually the construction superintendent This includes moving scaffolds from one position to another Each leg of a scaffold must be supported by and adequate footing Loose bards, bricks and other material not provide a safe, adequate base 2.17.7-2 Where the working platform in more than 10 feet off the ground, the scaffold shall have guardrails installed 2.17.7-3 If people are working under the scaffold, toe boards must be used to prevent tools and materials from falling on them 2.17.7-4 Workers are not to climb the metal tubular frame of the scaffold to get the working platform Other, safer means of access must be used – a ladder or access from the building 2.17.8 Safety working with Mobile Scaffold 2.17.9 Mobile scaffolds have restricted reach unless a guy wire secures them They are more susceptible to overturning and require a smooth, level working surface A complete guardrail system must be used at elevations above 10 feet and shall be used at all working levels Scaffold should be moved when unoccupied and only by pushing from the base Wheel brakes must be set when scaffold is in use MVAC Services Page PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -2.18 MITIGATION OF RISK Impact damage during pouring of concrete installation to be monitored constancy white concrete is poured Correct connections or materials, ensure the final installation and connections are inspected and signed off with photographic records by MEP coordinator on site M&E staff from contractor, architect and client ACTUAL WORKS METHOD STATEMENT 3.1 Delivery and store Insulation sheet & Insulation tube materials arrived to site shall be inspected and stored according to manufacturer recommendations Materials shall be stored in the covered and dry space During the receiving materials of Insulation, manpower shall be used to make Insulation The Insulation and accessories shall be protected and covered with MVAC Services polythene sheets before insulating Page Materials of Insulation is as table below PROJECT: EXCHANGE SQUARE (STREET 106 SITE) TITLE OF WORK: METHOD STATEMENT MVAC 11 APRIL 2015 FOR DUCT & PIPE INSULATION -3.2 DUCT & PIPE WORK INSULATION METHODOLOGY 3.2.1 Cutting insulation tube How to cut Insulation tube MVAC Services Page 10

Ngày đăng: 19/04/2023, 22:56

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan