1. Trang chủ
  2. » Luận Văn - Báo Cáo

Ibim profile ver2020 oc02

10 0 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Nội dung

Copyrights @ 2020 IBIMCO.,LTD MODELING OF SYNCHRONIZATION CÔNG TY TNHH MƠ HÌNH THƠNG TIN XÂY DỰNG TÂN TIẾN INNOVATION BUILDING INFORMATION MODELING CO.,LTD Rep Office: 59/01 Dinh Bo Linh, Ward 26, Binh Thanh District, HCMC, VN Tel: (+84) 39 79 79 427 | Buss Code: 0315155208 | Email: info@ibim.com.vn | Facebook: https://www.facebook.com/ibimconsultant BIM CONSULTANT IN DESIGN or RENOVATION DESIGN  BIM DELOYMENT FOR SHOP DRAWING or SIMULATION  BIM DELOYMENT FOR O&M/FM MODE or AS BUILT MODEL  Copyrights @ 2020 I INTRODUCTION - GIỚI THIỆU IBIMCo.,LTD (short name of Innovation Building Information Modeling Company Limited) is a leading company in using BIM for Design – Coordination Deloyment, which is accompanied with Owners - Contractors - Consultants for applying Full BIM and Leading Lean BIM, in Building Lifecycle IBIMCo.,LTD (tên viết tắt Cơng ty TNHH Mơ Hình Thơng Tin Xây Dựng Tân Tiến) công ty đầu việc dùng công nghệ BIM cho việc Thiết kế Phối hợp – Triển khai, đơn vị đồng hành với Chủ đầu tư – Nhà thầu – Các đơn vị tư vấn áp dụng hoàn toàn BIM, hướng tới ứng dụng BIM, vịng đời cơng trình HUMAN RESOURCES / NHÂN LỰC Masters/Thạc sỹ Engnineers/Kỹ sư iBIM 10 _ Associates (05 units) Architects/KTS Modeler/Lập mơ hình Others/Khác – MODELING OF SYNCHRONIZATION I INTRODUCTION - GIỚI THIỆU APPLIED BIM MODELS – MƠ HÌNH BIM ĐÃ ĐƯƠC ÁP DỤNG BIM for Designers BIM for Contractors BIM for Owners 01 Collaborative work process - Quy trình làm việc hợp tác APS OF OPTIMZATION iBIM– SOLUTION – MODELING OF SYNCHRONIZATION 02 Two-tiered coordination process - Quy trình phối hợp hai tầng I INTRODUCTION - GIỚI THIỆU iBIM’s SCOPE OF WORKS – PHẠM VI CÔNG VIỆC CỦA iBIM FOR DESIGN ĐỐI VỚI THIẾT KẾ o BIM Design / Thiết kế ứng dụng công nghệ BIM o Modeling and exacting 2d drawings complied with standard Mơ hình xuất vẽ 2D theo tiêu chuẩn o Clash detection and resolution/ Phát giải xung đột o Quantity take off and Cost Estimation / Bốc tách khối lượng Áp chí phí 01 iBIM o Modeling and modifying for FM model / Mơ hình hóa bổ sung cho mơ hình quản lý sở hạ tầng o Video for performance and visualization Dựng Video để trình chiếu thể o Clash detection and resolution Phát giải xung đột o Convert data Point Cloud to Revit Model Chuyển đổi liệu Point Cloud sang Revit Model FOR OWNERS ĐỐI VỚI CDT 03 02 FOR CONTRACTOR ĐỐI VỚI NHÀ THẦU o Shop drawing/ Bản vẽ shop drawing o Set up Model from CAD, Clash detection and resolution, quantity take off / Dựng lại mơ hình từ CAD, kiểm tra báo cáo xung đột, xuất khối lượng o Construction simulation (4D&5D) / Mô xây dựng (4D&5D) o Modeling and modifying for as-built model / Mơ hình hóa bổ sung cho mơ hình hồn cơng iBIM – MODELING OF SYNCHRONIZATION I INTRODUCTION - GIỚI THIỆU 01 GENERAL DIRECTOR / TỔNG GIÁM ĐỐC 05 DDD / P THIẾT KẾ VÀ TRIỂN KHAI iBIM 02 FAD / P KẾ TOÁN 03 HRD / P NHÂN SỰ ASSOCIATES IN DESIGN / CÔNG SỰ THIẾT KẾ DEPARMENTS IN DESIGN CÁC BỘ PHẬN THIẾT KẾ C&S DEP P TK KC & HT (LEADER) BIM DELOYING DEPARMENT BỘ PHẬN TRIỂN KHAI BIM iBIM’s ORGANIZARION CHART / SƠ ĐỒ TỔ CHỨC CỦA iBIM 04 EPD / P KINH DOANH STRUC KẾT CẤU BIM DEPLOYING DEPT / P TRIỂN KHAI BIM – BIM MANAGER 06 PRJ / DỰ ÁN TRIỂN KHAI PRJ 01 LEADER 01 …… … PRJ n LEADER n – MODELING OF SYNCHRONIZATION INFRA HẠ TẦNG C&S Modeler BIM_A CTY TK KT & NT (LEADER) CONCEPT & DESIGN P.ÁN & THIẾT KẾ INTERIOR TK NÔI THẤT A&I Modeler BIM_M&E CTY TK CƠ ĐIỆN (LEADER) ELECTRICITY ĐIỆN ACMV DHKK MEP Modeler BIM_QS CTY KS KHỐI LƯỢNG (LEADER) PSF CTN NƯƠC Quantity Take off II LEGAL AND LICENCES – PHÁP NHÂN VÀ GIẤY PHÉP HÀNH NGHỀ BUSSINESS REGISTER CERTIFICATION – GIẤY CHỨNG NHẬN ĐĂNG KÝ KINH DOANH APS OF OPTIMZATION iBIM– SOLUTION – MODELING OF SYNCHRONIZATION II LEGAL AND LICENCES – PHÁP NHÂN VÀ GIẤY PHÉP HÀNH NGHỀ CERTIFICATE OF CONSTRUCTION ACTIVITY CAPACITY – CHỨNG CHỈ NĂNG LỰC HOẠT ĐỘNG XÂY DỰNG APS OF OPTIMZATION iBIM– SOLUTION – MODELING OF SYNCHRONIZATION III iBIM’s PROCESS – QUY TRÌNH TRIỂN KHAI CỦA iBIM GENERAL REGULATIONS – CÁC QUY TẮC CHUNG iBIM – MODELING OF SYNCHRONIZATION III iBIM’s PROCESS – QUY TRÌNH TRIỂN KHAI CỦA iBIM iBIM FOLDER TREE – CÂY THƯ MỤC CTY iBIM IBIM FOLDER CÂY THƯ MỤC CƠNG TY IBIM CTY TNHH IBIM 01 PHỊNG BAN GIÁM ĐỐC 02 PHỊNG KẾ TỐN 03 PHỊNG NHÂN SỰ 04 PHÒNG KINH DOANH 05 PHÒNG THIẾT KẾ VÀ TRIỂN KHAI 06 00 QUẢN LÝ THIẾT KẾ VÀ TRIỂN KHAI 01 BỘ PHẬN KIẾN TRÚC 02 BỘ PHẬN HẠ TẦNG 03 BỘ PHẬN KẾT CẤU 04 BỘ PHẬN MEP 05 BỘ PHẬN BOQ 06 BỘ PHẬN TRIỂN KHAI BIM PHÒNG TRIỂN KHAI DỰ ÁN 00 QUẢN LÝ TỔNG DỰ ÁN THƯ MỤC TRIỂN KHAI DỰ ÁN 07 THƯ VIỆN LƯU TRỮ TÀI LIỆU 08 THAM KHẢO CHUNG 09 iBIM – MODELING OF SYNCHRONIZATION 00 LƯU TRỮ TẠM (1 TUẦN) 01 DỰ ÁN MẪU THAM KHẢO 02 THAM KHẢO KHÁC TÀI LIỆU HƯỚNG DẪN VIII CLIENT’S RECEIVING FROM iBIM – ĐIỀU KHÁCH HÀNG NHẬN ĐƯƠC TỪ iBIM BENEFITS AND EFFICIENCY A PS – SOLUTION OF OPTIMZATION iBIM – MODELING OF SYNCHRONIZATION 10

Ngày đăng: 18/04/2023, 13:00

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w