® Edition 1.0 2013-09 INTERNATIONAL STANDARD NORME INTERNATIONALE Industrial communication networks – Profiles – Part 5-8: Installation of fieldbuses – Installation profiles for CPF IEC 61784-5-8:2013 Réseaux de communication industriels – Profils – Partie 5-8: Installation des bus de terrain – Profils d'installation pour CPF colour inside Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe IEC 61784-5-8 All rights reserved Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either IEC or IEC's member National Committee in the country of the requester If you have any questions about IEC copyright or have an enquiry about obtaining additional rights to this publication, please contact the address below or your local IEC member National Committee for further information Droits de reproduction réservés Sauf indication contraire, aucune partie de cette publication ne peut être reproduite ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie et les microfilms, sans l'accord écrit de la CEI ou du Comité national de la CEI du pays du demandeur Si vous avez des questions sur le copyright de la CEI ou si vous désirez obtenir des droits supplémentaires sur cette publication, utilisez les coordonnées ci-après ou contactez le Comité national de la CEI de votre pays de résidence IEC Central Office 3, rue de Varembé CH-1211 Geneva 20 Switzerland Tel.: +41 22 919 02 11 Fax: +41 22 919 03 00 info@iec.ch www.iec.ch About the IEC The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes International Standards for all electrical, electronic and related technologies About IEC publications The technical content of IEC publications is kept under constant review by the IEC Please make sure that you have the latest edition, a corrigenda or an amendment might have been published Useful links: IEC publications search - www.iec.ch/searchpub Electropedia - www.electropedia.org The advanced search enables you to find IEC publications by a variety of criteria (reference number, text, technical committee,…) It also gives information on projects, replaced and withdrawn publications The world's leading online dictionary of electronic and electrical terms containing more than 30 000 terms and definitions in English and French, with equivalent terms in additional languages Also known as the International Electrotechnical Vocabulary (IEV) on-line IEC Just Published - webstore.iec.ch/justpublished Customer Service Centre - webstore.iec.ch/csc Stay up to date on all new IEC publications Just Published details all new publications released Available on-line and also once a month by email If you wish to give us your feedback on this publication or need further assistance, please contact the Customer Service Centre: csc@iec.ch A propos de la CEI La Commission Electrotechnique Internationale (CEI) est la première organisation mondiale qui élabore et publie des Normes internationales pour tout ce qui a trait l'électricité, l'électronique et aux technologies apparentées A propos des publications CEI Le contenu technique des publications de la CEI est constamment revu Veuillez vous assurer que vous possédez l’édition la plus récente, un corrigendum ou amendement peut avoir été publié Liens utiles: Recherche de publications CEI - www.iec.ch/searchpub Electropedia - www.electropedia.org La recherche avancée vous permet de trouver des publications CEI en utilisant différents critères (numéro de référence, texte, comité d’études,…) Elle donne aussi des informations sur les projets et les publications remplacées ou retirées Le premier dictionnaire en ligne au monde de termes électroniques et électriques Il contient plus de 30 000 termes et définitions en anglais et en franỗais, ainsi que les termes ộquivalents dans les langues additionnelles Egalement appelé Vocabulaire Electrotechnique International (VEI) en ligne Just Published CEI - webstore.iec.ch/justpublished Restez informé sur les nouvelles publications de la CEI Just Published détaille les nouvelles publications parues Disponible en ligne et aussi une fois par mois par email Service Clients - webstore.iec.ch/csc Si vous désirez nous donner des commentaires sur cette publication ou si vous avez des questions contactez-nous: csc@iec.ch Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright © 2013 IEC, Geneva, Switzerland ® Edition 1.0 2013-09 INTERNATIONAL STANDARD NORME INTERNATIONALE colour inside Industrial communication networks – Profiles – Part 5-8: Installation of fieldbuses – Installation profiles for CPF Réseaux de communication industriels – Profils – Partie 5-8: Installation des bus de terrain – Profils d'installation pour CPF INTERNATIONAL ELECTROTECHNICAL COMMISSION COMMISSION ELECTROTECHNIQUE INTERNATIONALE PRICE CODE CODE PRIX ICS 25.040.40; 35.100.40 XC ISBN 978-2-8322-1066-6 Warning! Make sure that you obtained this publication from an authorized distributor Attention! Veuillez vous assurer que vous avez obtenu cette publication via un distributeur agréé ® Registered trademark of the International Electrotechnical Commission Marque déposée de la Commission Electrotechnique Internationale Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe IEC 61784-5-8 61784-5-8 © IEC:2013 CONTENTS FOREWORD 12 INTRODUCTION 14 Scope 15 Normative references 15 Terms, definitions and abbreviated terms 15 CPF 8: Overview of installation profiles 15 Installation profile conventions 16 Conformance to installation profiles 16 Annex A (normative) CP 8/1 and CP 8/2 (CC-Link/V1 and CC-Link/V2) specific installation profile 18 A.1 Installation profile scope 18 A.2 Normative references 18 A.3 Installation profile terms, definitions, and abbreviated terms 18 A.3.1 Terms and definitions 18 A.3.2 Abbreviated terms 18 A.3.3 Conventions for installation profiles 18 A.4 Installation planning 18 A.4.1 General 18 A.4.1.1 Objective 18 A.4.1.2 Cabling in industrial premises 18 A.4.1.3 The planning process 18 A.4.1.4 Specific requirements for CPs 18 A.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 19 A.4.2 Planning requirements 19 A.4.2.1 Safety 19 A.4.2.2 Security 19 A.4.2.3 Environmental considerations and EMC 19 A.4.2.4 Specific requirements for generic cabling in accordance with ISO/IEC 24702 19 A.4.3 Network capabilities 19 A.4.3.1 Network topology 19 A.4.3.2 Network characteristics 20 A.4.4 Selection and use of cabling components 21 A.4.4.1 Cable selection 21 A.4.4.2 Connecting hardware selection 23 A.4.4.3 Connections within a channel/permanent link 24 A.4.4.4 Terminators 24 A.4.4.5 Device location and connection 24 A.4.4.6 Coding and labelling 25 A.4.4.7 Earthing and bonding of equipment and devices and shielded cabling 25 A.4.4.8 Storage and transportation of cables 26 A.4.4.9 Routing of cables 26 A.4.4.10 Separation of circuit 26 A.4.4.11 Mechanical protection of cabling components 26 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe –2– –3– A.4.4.12 Installation in special areas 26 A.4.5 Cabling planning documentation 26 A.4.6 Verification of cabling planning specification 26 A.5 Installation implementation 26 A.5.1 General requirements 26 A.5.1.1 Common description 26 A.5.1.2 Installation of CPs 26 A.5.1.3 Installation of generic cabling in industrial premises 26 A.5.2 Cable installation 26 A.5.2.1 General requirements for all cabling types 26 A.5.2.2 Installation and routing 27 A.5.2.3 Specific requirements for CPs 27 A.5.2.4 Specific requirements for wireless installation 27 A.5.2.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 27 A.5.3 Connector installation 27 A.5.3.1 Common description 27 A.5.3.2 Shielded connectors 28 A.5.3.3 Unshielded connectors 28 A.5.3.4 Specific requirements for CPs 28 A.5.3.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 28 A.5.4 Terminator installation 28 A.5.4.1 Common description 28 A.5.4.2 Specific requirements for CPs 28 A.5.5 Device installation 28 A.5.6 Coding and labelling 28 A.5.6.1 Common description 28 A.5.6.2 Specific requirements for CPs 28 A.5.7 Earthing and bonding of equipment and devices and shield cabling 28 A.5.7.1 Common description 28 A.5.7.2 Bonding and earthing of enclosures and pathways 28 A.5.7.3 Earthing methods 28 A.5.7.4 Shield termination methods 29 A.5.7.5 Specific requirements for CPs 29 A.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC 24702 29 A.5.8 As-implemented cabling documentation 29 A.6 Installation verification and installation acceptance test 29 A.6.1 General 29 A.6.2 Installation verification 29 A.6.2.1 General 29 A.6.2.2 Verification according to cabling planning documentation 29 A.6.2.3 Verification of earthing and bonding 29 A.6.2.4 Verification of shield earthing 29 A.6.2.5 Verification of cabling system 29 A.6.2.6 Cable selection verification 29 A.6.2.7 Connector verification 30 A.6.2.8 Connection verification 30 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © IEC:2013 61784-5-8 © IEC:2013 A.6.2.9 Terminators verification 30 A.6.2.10 Coding and labelling verification 30 A.6.2.11 Verification report 30 A.6.3 Installation acceptance test 30 A.6.3.1 General 30 A.6.3.2 Acceptance test of Ethernet-based cabling 30 A.6.3.3 Acceptance test of non-Ethernet-based cabling 30 A.6.3.4 Specific requirements for wireless installation 30 A.6.3.5 Acceptance test report 30 A.7 Installation administration 31 A.8 Installation maintenance and installation troubleshooting 31 Annex B (normative) CP 8/3 (CC-Link/LT) specific installation profile 32 B.1 Installation profile scope 32 B.2 Normative references 32 B.3 Installation profile terms, definitions, and abbreviated terms 32 B.3.1 Terms and definitions 32 B.3.2 Abbreviated terms 32 B.3.3 Conventions for installation profiles 32 B.4 Installation planning 32 B.4.1 General 32 B.4.1.1 Objective 32 B.4.1.2 Cabling in industrial premises 32 B.4.1.3 The planning process 32 B.4.1.4 Specific requirements for CPs 32 B.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 33 B.4.2 Planning requirements 33 B.4.2.1 Safety 33 B.4.2.2 Security 33 B.4.2.3 Environmental considerations and EMC 33 B.4.2.4 Specific requirements for generic cabling in accordance with ISO/IEC 24702 33 B.4.3 Network capabilities 33 B.4.3.1 Network topology 33 B.4.3.2 Network characteristics 34 B.4.4 Selection and use of cabling components 36 B.4.4.1 Cable selection 36 B.4.4.2 Connecting hardware selection 38 B.4.4.3 Connections within a channel/permanent link 40 B.4.4.4 Terminators 41 B.4.4.5 Device location and connection 41 B.4.4.6 Coding and labelling 41 B.4.4.7 Earthing and bonding of equipment and devices and shielded cabling 41 B.4.4.8 Storage and transportation of cables 42 B.4.4.9 Routing of cables 42 B.4.4.10 Separation of circuit 42 B.4.4.11 Mechanical protection of cabling components 42 B.4.4.12 Installation in special areas 42 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe –4– –5– B.4.5 Cabling planning documentation 43 B.4.6 Verification of cabling planning specification 43 B.5 Installation implementation 43 B.5.1 General requirements 43 B.5.1.1 Common description 43 B.5.1.2 Installation of CPs 43 B.5.1.3 Installation of generic cabling in industrial premises 43 B.5.2 Cable installation 43 B.5.2.1 General requirements for all cabling types 43 B.5.2.2 Installation and routing 44 B.5.2.3 Specific requirements for CPs 44 B.5.2.4 Specific requirements for wireless installation 44 B.5.2.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 44 B.5.3 Connector installation 44 B.5.3.1 Common description 44 B.5.3.2 Shielded connectors 44 B.5.3.3 Unshielded connectors 45 B.5.3.4 Specific requirements for CPs 45 B.5.3.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 45 B.5.4 Terminator installation 45 B.5.4.1 Common description 45 B.5.4.2 Specific requirements for CPs 45 B.5.5 Device installation 45 B.5.6 Coding and labelling 45 B.5.7 Earthing and bonding of equipment and devices and shield cabling 45 B.5.7.1 Common description 45 B.5.7.2 Bonding and earthing of enclosures and pathways 45 B.5.7.3 Earthing methods 45 B.5.7.4 Shield termination methods 45 B.5.7.5 Specific requirements for CPs 45 B.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC 24702 46 B.5.8 As-implemented cabling documentation 46 B.6 Installation verification and installation acceptance test 46 B.6.1 General 46 B.6.2 Installation verification 46 B.6.2.1 General 46 B.6.2.2 Verification according to cabling planning documentation 46 B.6.2.3 Verification of earthing and bonding 46 B.6.2.4 Verification of shield earthing 46 B.6.2.5 Verification of cabling system 46 B.6.2.6 Cable selection verification 46 B.6.2.7 Connector verification 46 B.6.2.8 Connection verification 46 B.6.2.9 Terminators verification 47 B.6.2.10 Coding and labelling verification 47 B.6.2.11 Verification report 47 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © IEC:2013 61784-5-8 © IEC:2013 B.6.3 Installation acceptance test 47 B.6.3.1 General 47 B.6.3.2 Acceptance test of Ethernet-based cabling 47 B.6.3.3 Acceptance test of non-Ethernet-based cabling 47 B.6.3.4 Specific requirements for wireless installation 47 B.6.3.5 Acceptance test report 47 B.7 Installation administration 47 B.8 Installation maintenance and installation troubleshooting 47 Annex C (normative) CP 8/4 (CC-Link IE Controller Network) specific installation profile 48 C.1 Installation profile scope 48 C.2 Normative references 48 C.3 Installation profile terms, definitions, and abbreviated terms 48 C.3.1 Terms and definitions 48 C.3.2 Abbreviated terms 48 C.3.3 Conventions for installation profiles 48 C.4 Installation planning 48 C.4.1 General 48 C.4.1.1 Objective 48 C.4.1.2 Cabling in industrial premises 48 C.4.1.3 The planning process 48 C.4.1.4 Specific requirements for CPs 48 C.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 48 C.4.2 Planning requirements 48 C.4.2.1 Safety 48 C.4.2.2 Security 49 C.4.2.3 Environmental considerations and EMC 49 C.4.2.4 Specific requirements for generic cabling in accordance with ISO/IEC 24702 49 C.4.3 Network capabilities 49 C.4.3.1 Network topology 49 C.4.3.2 Network characteristics 49 C.4.4 Selection and use of cabling components 50 C.4.4.1 Cable selection 50 C.4.4.2 Connecting hardware selection 51 C.4.4.3 Connections within a channel/permanent link 52 C.4.4.4 Terminators 53 C.4.4.5 Device location and connection 53 C.4.4.6 Coding and labelling 53 C.4.4.7 Earthing and bonding of equipment and devices and shielded cabling 53 C.4.4.8 Storage and transportation of cables 54 C.4.4.9 Routing of cables 54 C.4.4.10 Separation of circuit 54 C.4.4.11 Mechanical protection of cabling components 54 C.4.4.12 Installation in special areas 55 C.4.5 Cabling planning documentation 55 C.4.5.1 Common description 55 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe –6– –7– C.4.5.2 Cabling planning documentation for CPs 55 C.4.5.3 Network certification documentation 55 C.4.5.4 Cabling planning documentation for generic cabling in accordance with ISO/IEC 24702 55 C.4.6 Verification of cabling planning specification 55 C.5 Installation implementation 55 C.5.1 General requirements 55 C.5.1.1 Common description 55 C.5.1.2 Installation of CPs 55 C.5.1.3 Installation of generic cabling in industrial premises 55 C.5.2 Cable installation 55 C.5.2.1 General requirements for all cabling types 55 C.5.2.2 Installation and routing 56 C.5.2.3 Specific requirements for CPs 56 C.5.2.4 Specific requirements for wireless installation 56 C.5.2.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 57 C.5.3 Connector installation 57 C.5.3.1 Common description 57 C.5.3.2 Shielded connectors 57 C.5.3.3 Unshielded connectors 57 C.5.3.4 Specific requirements for CPs 57 C.5.3.5 Specific requirements for wireless installation 57 C.5.4 Terminator installation 57 C.5.5 Device installation 57 C.5.5.1 Common description 57 C.5.5.2 Specific requirements for CPs 57 C.5.6 Coding and labelling 57 C.5.6.1 Common description 57 C.5.6.2 Specific requirements for CPs 57 C.5.7 Earthing and bonding of equipment and devices and shield cabling 57 C.5.7.1 Common description 57 C.5.7.2 Bonding and earthing of enclosures and pathways 57 C.5.7.3 Earthing methods 57 C.5.7.4 Shield termination methods 58 C.5.7.5 Specific requirements for CPs 58 C.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC 24702 58 C.5.8 As-implemented cabling documentation 58 C.6 Installation verification and installation acceptance test 58 C.6.1 General 58 C.6.2 Installation verification 58 C.6.2.1 General 58 C.6.2.2 Verification according to cabling planning documentation 58 C.6.2.3 Verification of earthing and bonding 58 C.6.2.4 Verification of shield earthing 58 C.6.2.5 Verification of cabling system 58 C.6.2.6 Cable selection verification 58 C.6.2.7 Connector verification 59 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © IEC:2013 61784-5-8 © IEC:2013 C.6.2.8 Connection verification 59 C.6.2.9 Terminators verification 59 C.6.2.10 Coding and labelling verification 59 C.6.2.11 Verification report 59 C.6.3 Installation acceptance test 59 C.6.3.1 General 59 C.6.3.2 Acceptance test of Ethernet based cabling 59 C.6.3.3 Acceptance test of non Ethernet based cabling 59 C.6.3.4 Specific requirements for wireless installation 59 C.6.3.5 Acceptance test report 60 C.7 Installation administration 60 C.8 Installation maintenance and installation troubleshooting 60 Annex D (normative) CP 8/5 (CC-Link IE Field Network) specific installation profile 61 D.1 Installation profile scope 61 D.2 Normative references 61 D.3 Installation profile terms, definitions, and abbreviated terms 61 D.3.1 Terms and definitions 61 D.3.2 Abbreviated terms 61 D.3.3 Conventions for installation profiles 61 D.4 Installation planning 61 D.4.1 General 61 D.4.1.1 Objective 61 D.4.1.2 Cabling in industrial premises 61 D.4.1.3 The planning process 61 D.4.1.4 Specific requirements for CPs 61 D.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702 61 D.4.2 Planning requirements 61 D.4.2.1 Safety 61 D.4.2.2 Security 62 D.4.2.3 Environmental considerations and EMC 62 D.4.2.4 Specific requirements for generic cabling in accordance with ISO/IEC 24702 62 D.4.3 Network capabilities 62 D.4.3.1 Network topology 62 D.4.3.2 Network characteristics 62 D.4.4 Selection and use of cabling components 63 D.4.4.1 Cable selection 63 D.4.4.2 Connecting hardware selection 64 D.4.4.3 Connections within a channel/permanent link 65 D.4.4.4 Terminators 66 D.4.4.5 Device location and connection 66 D.4.4.6 Coding and labelling 66 D.4.4.7 Earthing and bonding of equipment and devices and shielded cabling 66 D.4.4.8 Storage and transportation of cables 67 D.4.4.9 Routing of cables 67 D.4.4.10 Separation of circuit 68 D.4.4.11 Mechanical protection of cabling components 68 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe –8– 61784-5-8 © CEI:2013 Tableau D.1 – Caractéristiques du réseau pour un câblage paires symétriques base d’Ethernet Caractéristique CP 8/5 Débits de données pris en charge (Mbit/s) Longueur de canal prise en charge (m) Nombre de connexions sur le canal (max.) Longueur du cordon de brassage (m) 000 b 23 900 a,b 253 a Classe de canal selon l'ISO/CEI 24702 (min.) 100 b Catégorie de câble selon l'ISO/CEI 24702 (min.) D c 5e Catégorie de matériel de connexion selon l'ISO/CEI 24702 (min.) Types de câbles 5e ANSI/TIA/EIA-568-B a Voir D.4.4.3.2 b Pour les besoins du présent tableau, les définitions relatives aux canaux de l’ISO/CEI 24702 sont applicables c Des informations supplémentaires sont données dans la série CEI 61156 D.4.3.2.4 Caractéristiques du réseau pour un câblage fibres optiques Non applicable D.4.3.2.5 Caractéristiques spécifiques du réseau Non applicable D.4.3.2.6 D.4.4 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Sélection et utilisation des composants de câblage D.4.4.1 Sélection du câble D.4.4.1.1 Description commune D.4.4.1.2 Câbles en cuivre D.4.4.1.2.1 Câbles paires symétriques pour les CPs base Ethernet Remplacement: Le Tableau D.2 fournit des valeurs fondées sur le modèle du Tableau de la CEI 61918:2013 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 140 – – 141 – Tableau D.2 – Informations applicables aux câbles en cuivre: câbles fixes Caractéristique CP 8/5 100 Impédance nominale du câble (Ω) DCR des conducteurs (Ω/km) < 115 DCR du blindage (Ω/km) – Nombre de conducteurs Blindage Bande d’aluminium sur fil tressé en cuivre recuit Code de couleur du conducteur – Exigences de couleur de gaine extérieure – Matériau de gaine extérieure En fonction de l’application Résistance aux environnements rigoureux (par exemple UV, résistance l’huile, LS0H) En fonction de l’application Évaluation par les organismes de certification En fonction de l’application Standard IEEE 802.3 1000Base-T ANSI/TIA/EIA-568-B Catégorie 5e D.4.4.1.2.2 Câbles en cuivre pour les CP non Ethernet Non applicable D.4.4.1.3 Câbles pour installation sans fil Non applicable D.4.4.1.4 Câbles fibres optiques Non applicable D.4.4.1.5 Câbles paires symétriques et fibres optiques usage spécial Non applicable D.4.4.1.6 Exigences spécifiques pour les CPs Non applicable D.4.4.1.7 D.4.4.2 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Sélection du matériel de connexion D.4.4.2.1 Description commune D.4.4.2.2 Matériel de connexion pour les CPs de câblage paires symétriques base Ethernet Remplacement: Le Tableau D.3 fournit des valeurs fondées sur le modèle du Tableau de la CEI 61918:2013 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 61784-5-8 © CEI:2013 Tableau D.3 – Connecteurs pour les CPs de câblage paires symétriques base Ethernet Série CEI 60603-7 CP 8/5 a CEI 61076-3106 b CEI 61076-3117 b CEI 61076-2101 CEI 61076-2109 blindé non blindé Var Var Var 14 M12-4 codage D M12-8 codage X CEI 60603-7-3 Non Non Non Non Non Non a Pour la série CEI 60603-7, le choix du connecteur est fondé sur les exigences de performance du canal b Btiers de protection des connecteurs D.4.4.2.3 Matériel de connexion pour les CPs de câblage en cuivre non Ethernet Non applicable D.4.4.2.4 Matériel de connexion des installations sans fil Non applicable D.4.4.2.5 Matériel de connexion pour câblage fibres optiques Non applicable D.4.4.2.6 Exigences spécifiques pour les CPs Non applicable D.4.4.2.7 D.4.4.3 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Connexions dans un canal/une liaison permanente D.4.4.3.1 Description commune D.4.4.3.2 Connexions et épissures de câblage symétrique pour les CPs base Ethernet D.4.4.3.2.1 Description commune D.4.4.3.2.2 Distance minimale entre les connexions D.4.4.3.2.3 Epissures de câblage paires symétriques D.4.4.3.2.4 Connexions de cloison de câblage paires symétriques D.4.4.3.2.5 Adaptateurs J-J de câblage paires symétriques D.4.4.3.3 Connexions et épissures de câbles en cuivre pour les CPs non Ethernet Non applicable D.4.4.3.4 Connexions et épissures de câblage fibres optiques pour les CP base Ethernet Non applicable D.4.4.3.5 Connexions et épissures de câblage fibres optiques pour les CPs non Ethernet Non applicable Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 142 – D.4.4.3.6 D.4.4.4 – 143 – Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Terminaisons Non applicable D.4.4.5 Emplacement et connexion du dispositif D.4.4.5.1 Description commune D.4.4.5.2 Exigences spécifiques pour les CPs Non applicable D.4.4.5.3 Exigences particulières pour l’installation sans fil Non applicable D.4.4.5.4 D.4.4.6 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Codage et étiquetage D.4.4.6.1 Description commune D.4.4.6.2 Exigences complémentaires pour les CPs Non applicable D.4.4.6.3 Exigences spécifiques pour les CPs Non applicable D.4.4.6.4 D.4.4.7 D.4.4.7.1 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Mise la terre et équipotentialité du matériel et des dispositifs et câblage blindé Description commune D.4.4.7.1.1 Exigences fondamentales D.4.4.7.1.2 Tâches du planificateur D.4.4.7.1.3 Méthodes de contrôle des différences de potentiel dans le système de mise la terre D.4.4.7.1.4 Sélection des systèmes de mise la terre et d’équipotentialité D.4.4.7.2 Liaison équipotentielle et mise la terre des enveloppes et des chemins D.4.4.7.2.1 Dimension et longueur des conducteurs d’égalisation et de mise la terre D.4.4.7.2.2 Tresses de liaison équipotentielle et dimensions Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 D.4.4.7.2.3 Préparation de surface et méthodes D.4.4.7.2.4 Liaison équipotentielle et mise la terre D.4.4.7.3 61784-5-8 © CEI:2013 Méthodes de mise la terre D.4.4.7.3.1 Equipotentielle Non applicable D.4.4.7.3.2 Etoile D.4.4.7.3.3 Mise la terre du matériel (dispositifs) Addition: Un circuit de mise la terre RC parallèle ne doit pas être utilisé pour les réseaux CP 8/5 D.4.4.7.3.4 D.4.4.7.4 Barres de bus en cuivre Mise la terre du blindage D.4.4.7.4.1 Absence de mise la terre ou RC parallèle Non applicable D.4.4.7.4.2 Direct D.4.4.7.4.3 Dérivées de circuit RC direct et parallèle Non applicable D.4.4.7.5 Exigences spécifiques pour les CPs Non applicable D.4.4.7.6 D.4.4.8 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Stockage et transport des câbles D.4.4.8.1 Description commun e D.4.4.8.2 Exigences spécifiques pour les CPs Non applicable D.4.4.8.3 D.4.4.9 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Acheminement des câbles D.4.4.9.1 Description commune D.4.4.9.2 Acheminement des câbles des assemblages D.4.4.9.3 Exigences détaillées relatives l’acheminement des câbles l’intérieur des enveloppes Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 144 – – 145 – D.4.4.9.4 Acheminement des câbles l’intérieur des bâtiments D.4.4.9.5 Acheminement des câbles l’extérieur des bâtiments et entre les bâtiments D.4.4.9.6 Installation des câbles de communication redondants D.4.4.10 Séparation des circuits D.4.4.11 Protection mécanique des composants de câblage D.4.4.11.1 Description commune D.4.4.11.2 Exigences spécifiques pour les CPs Non applicable D.4.4.11.3 D.4.4.12 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Installation dans des zones particulières D.4.4.12.1 Description commune D.4.4.12.2 Exigences spécifiques pour les CPs Non applicable D.4.4.12.3 D.4.5 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Documentation de planification du câblage D.4.5.1 Description commune D.4.5.2 Documentation de planification du câblage pour les CPs Non applicable D.4.5.3 Documentation de certification du réseau D.4.5.4 Documentation de planification pour le câblage relative au câblage générique conformément l’ISO/CEI 24702 D.4.6 D.5 Vérification de la spécification de planification du câblage Mise en œuvre de l’installation D.5.1 Exigences générales D.5.1.1 Description commune D.5.1.2 Installation des CPs D.5.1.3 Installation du câblage générique dans des locaux industriels D.5.2 D.5.2.1 Installation des câbles Exigences générales relatives aux types de câblage Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 61784-5-8 © CEI:2013 D.5.2.1.1 Stockage et installation D.5.2.1.2 Protection des câbles de communication contre les éventuels dommages mécaniques Remplacement: Le Tableau D.4 fournit des valeurs fondées sur le modèle du Tableau 18 de la CEI 61918:2013 Tableau D.4 – Paramètres pour des câbles paires symétriques Caractéristique Effort mécanique Rayon minimal de courbure, une seule courbure (mm) a Rayon de courbure, plusieurs courbures (mm) a Efforts de traction (N) a Efforts de traction continue (N) a Forces latérales maximales (N/cm) a Plage de températures pendant l’installation (°C) a Valeur -20 +70 Selon le type de câble: voir la fiche technique du fabricant D.5.2.1.3 Prévention de formation de boucles D.5.2.1.4 Torsion D.5.2.1.5 Résistance la traction (des câbles installés) D.5.2.1.6 Rayon de courbure D.5.2.1.7 Force de traction D.5.2.1.8 Ajustement du réducteur de tension D.5.2.1.9 Installation des câbles dans l’armoire et les enveloppes D.5.2.1.10 Installation sur des parties mobiles D.5.2.1.11 Ecrasement de câbles D.5.2.1.12 Installation des câbles de flexion continue D.5.2.1.13 Instructions supplémentaires pour l’installation des câbles fibres optiques Non applicable D.5.2.2 Installation et acheminement D.5.2.2.1 Description commune D.5.2.2.2 Séparation des circuits D.5.2.3 Exigences spécifiques pour les CPs Non applicable D.5.2.4 Exigences particulières pour l’installation sans fil Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 146 – – 147 – Non applicable D.5.2.5 D.5.3 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Installation du connecteur D.5.3.1 Description commune D.5.3.2 Connecteurs blindés D.5.3.3 Connecteurs non blindés Non applicable D.5.3.4 Exigences spécifiques pour les CPs Non applicable D.5.3.5 D.5.4 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Montage des terminaisons Non applicable D.5.5 Installation du dispositif D.5.5.1 Description commune D.5.5.2 Exigences spécifiques pour les CPs Non applicable D.5.6 Codage et étiquetage D.5.6.1 Description commune D.5.6.2 Exigences spécifiques pour les CPs Non applicable D.5.7 Mise la terre et équipotentialité du matériel et des dispositifs et câblage blindé D.5.7.1 Description commune D.5.7.2 Equipotentialité et mise la terre des enveloppes et des chemins D.5.7.2.1 Dimension et longueur des conducteurs d’égalisation et de mise la terre D.5.7.2.2 Tresses de liaison équipotentielle et dimensions D.5.7.2.3 Préparation de surface et méthodes D.5.7.3 D.5.7.3.1 Méthodes de mise la terre Equipotentielle Non applicable Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 D.5.7.3.2 Etoile D.5.7.3.3 Mise la terre du matériel (des dispositifs) D.5.7.3.3.1 61784-5-8 © CEI:2013 Absence de mise la terre ou RC parallèle Non applicable D.5.7.3.3.2 Direct D.5.7.3.3.3 Installation des barres de bus en cuivre D.5.7.4 Méthodes de mise la terre du blindage D.5.7.4.1 Généralités D.5.7.4.2 RC parallèle Non applicable D.5.7.4.3 Direct D.5.7.4.4 Dérivées de circuit RC direct et parallèle Non applicable D.5.7.5 Exigences spécifiques pour les CPs Non applicable D.5.7.6 D.5.8 D.6 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Documentation du câblage comme exécuté Installation, vérification et essai de réception de l’installation D.6.1 Généralités D.6.2 Vérification de l’installation D.6.2.1 Généralités D.6.2.2 Vérification conformément la documentation de planification du câblage D.6.2.3 Vérification de la mise la terre et de l’équipotentialité D.6.2.3.1 Généralités D.6.2.3.2 Exigences particulières relatives la mise la terre et l’équipotentialité D.6.2.4 Vérification de la mise la terre du blindage D.6.2.5 Vérification du système de câblage D.6.2.5.1 Vérification de l’acheminement des câbles D.6.2.5.2 Vérification de la protection du câble et du réducteur de traction approprié D.6.2.6 Vérification de la sélection du câble Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 148 – – 149 – D.6.2.6.1 Description commune D.6.2.6.2 Exigences spécifiques pour les CPs Non applicable D.6.2.6.3 Exigences particulières pour l’installation sans fil D.6.2.7 Vérification du connecteur D.6.2.7.1 Description commune D.6.2.7.2 Exigences spécifiques pour les CPs Non applicable D.6.2.7.3 Exigences particulières pour l’installation sans fil Non applicable D.6.2.8 Vérification de la connexion D.6.2.8.1 Description commune D.6.2.8.2 Nombre de connexions et de connecteurs D.6.2.8.3 Table de correspondance des fils D.6.2.9 Vérification des terminaisons Non applicable D.6.2.10 Vérification codage et étiquetage D.6.2.10.1 Description commune D.6.2.10.2 Exigences particulières de vérification du codage et de l’étiquetage Non applicable D.6.2.11 D.6.3 Rapport de vérification Essai de réception de l’installation D.6.3.1 Généralités D.6.3.2 Essai de réception du câblage Ethernet D.6.3.2.1 Validation du câblage symétrique pour les CPs base Ethernet D.6.3.2.1.1 Description commune D.6.3.2.1.2 Paramètres d'essai de performances de transmission D.6.3.2.1.3 Exigences particulières pour les CPs base Ethernet Non applicable D.6.3.2.2 Validation du câblage fibres optiques des CPs base Ethernet Non applicable Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 D.6.3.2.3 D.6.3.3 Exigences spécifiques pour le câblage générique conformément l’ISO/CEI 24702 Essai de réception du câblage non Ethernet Non applicable D.6.3.4 Exigences particulières pour l’installation sans fil Non applicable D.6.3.5 D.7 Rapport d’essai de réception Administration de l’installation Le paragraphe 7.8 ne s’applique pas D.8 61784-5-8 © CEI:2013 Maintenance et dépannage de l’installation Le paragraphe 8.4 ne s’applique pas Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe – 150 – – 151 – Bibliographie Addition: [27] CC-Link open field network cable wiring manual, November 2008, CC-Link Partner Association, available at (disponible en anglais seulement) [28] CC-Link IE Controller Network cable installation manual, September 2008, CC-Link Partner Association, available at (disponible en anglais seulement) [29] CC-Link IE Field Network cable installation manual, June 2010, CC-Link Partner Association, available at (disponible en anglais seulement) Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe 61784-5-8 © CEI:2013 Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe ELECTROTECHNICAL COMMISSION 3, rue de Varembé PO Box 131 CH-1211 Geneva 20 Switzerland Tel: + 41 22 919 02 11 Fax: + 41 22 919 03 00 info@iec.ch www.iec.ch Copyrighted material licensed to BR Demo by Thomson Reuters (Scientific), Inc., subscriptions.techstreet.com, downloaded on Nov-27-2014 by James Madison No further reproduction or distribution is permitted Uncontrolled when printe INTERNATIONAL